ACR-205 Homework week 2

Total questions: 11

Worksheet time: 7mins

Name
Class
Date
1.

The limit switch is used on the electric element assembly to ____.

a)

shuts off the unit if high temperature occurs

b)

start the unit if the thermostat malfunctions

c)

ensure that the fan stops when the unit cools down

d)

start the unit prematurely on a cold day

2.

Which of the following elements is not a power-consuming device?

a)

The contacts of a contactor.

b)

The sequencer heater coil.

c)

A magnetic solenoid that moves the armature in a contactor

d)

The blower motor.

3.

A 10 Kw heating element, operating on rated 240 V, will generate ____ Btu/h.

a)

34,130

b)

29,319

c)

31,062

d)

35,875

4.

Electric heating units provide almost instant heat. Therefore, anticipators are not needed in electric heat thermostats.

a)

false

b)

true

5.

If the number two contact on a package sequencer fails to close, the number three contact can still close.

a)

true

b)

false

6.

All electric furnaces use package sequencers.

a)

false

b)

true

7.

If the fan were to fail and the limit switch stuck closed, the element would be cut off by the (a)   .

8.

In order to provide time delay between stages of electric heat, the controls that are used are called

(a)  

9.

For each watt of electrical power, ____________________ Btu/h are generated.

a)

3.413

b)

34.13

c)

341.3

d)

3413

10.

Why do most electric furnaces have several heating elements that are activated in stages?

a)

to avoid high power loads at once

b)

to avoid low power loads at once

c)

to make sure it works

d)

none of the above

11.

How is the formula QS = 1.08 × cfm × TD often called?

a)

sensible heat formula

b)

latent heat formula

c)

sensible flow formula

d)

latent flow formula