wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

M5 Floor Systems Trade Terms 35

Total questions: 35

Worksheet time: 18mins

Name
Class
Date
1.

Written document included with a set of prints that clarifies information presented on the prints and provides additional information not easily presented on the prints.

a)

Scab

b)

Span

c)

Specifications

d)

Squash Block

2.

Short joists that run from an opening to a bearing.

a)

Floor Joists

b)

Rim Joist

c)

Tail Joists

d)

Trimmer Joists

3.

Consist of a vertical web with flanges bonded to the top and bottom. The webs are made of OSB or plywood and the flanges are grooved to fit over the web.

a)

Floor Joists

b)

I-Joists

c)

Trimmer Joists

d)

Trimmer Joists

4.

A series of parallel, horizontal framing members that make up the body of the floor frame.

a)

Floor Joists

b)

Rim Joist

c)

Tail Joists

d)

Trimmer Joists

5.

A framing member that surrounds the outer edge of the joist and stabilizes the floor system.

a)

Floor Joists

b)

Rim Joist

c)

Tail Joists

d)

Trimmer Joists

6.

Full-length joists that reinforce a rough opening in the floor.

a)

Floor Joists

b)

Rim Joist

c)

Tail Joists

d)

Trimmer Joists

7.

The first and last joists in a floor system; they run parallel to the floor joists.

a)

End Joists

b)

I-Joists

c)

Tail Joists

d)

Rim Joist

8.

Used to frame floor openings and run perpendicular to the direction of the joists. _______ are doubled when the span exceeds 4'.

a)

Floor Trusses

b)

Headers

c)

Single-Layer Floor System

d)

Two-Layer Floor System

9.

Floor system in which a layer of underlayment is installed over a layer of subfloor.

a)

Floor Trusses

b)

Headers

c)

Single-Layer Floor System

d)

Two-Layer Floor System

10.

Combined subfloor and underlayment; typically installed where direct application of carpet or tile to the floor is intended.

a)

Single-Layer Floor System

b)

Headers

c)

Squash Block

d)

Two-Layer Floor System

11.

A block of wood or rim board installed next to an I-joist to support a load directly above that spot.

a)

Single-Layer Floor System

b)

Headers

c)

Squash Block

d)

Two-Layer Floor System

12.

A horizontal wood member attached to the bottom of a frame wall and connected to floor joists, girders, slabs, or other members.

a)

Bottom Plate

b)

Dome Pans

c)

Long Pans

d)

Sill Plate

13.

Metal or fiberglass concrete forms used for two-way joist systems.

a)

Bottom Plate

b)

Dome Pans

c)

Long Pans

d)

Sill Plate

14.

Metal or fiberglass concrete forms used for one-way joist systems.

a)

Bottom Plate

b)

Dome Pans

c)

Long Pans

d)

Sill Plate

15.

A horizontal wood member anchored to the foundation and supporting floor joists. A _______ _______ is typically preservative-treated or naturally durable wood.

a)

Bottom Plate

b)

Dome Pans

c)

Long Pans

d)

Sill Plate

16.

Dimensions shown on the prints that indicate the distance from the inside edge of one trimmer joist to the inside edge of the opposing trimmer joist.

a)

Floor Trusses

b)

Lateral Pressure

c)

Rough Opening

d)

Stem Wall

17.

Sideways pressure against a structure, such as a foundation.

a)

Floor Trusses

b)

Lateral Pressure

c)

Rough Opening

d)

Stem Wall

18.

A common foundation that typically has a shorter wall and is used for slab construction or to create a crawl space.

a)

Floor Trusses

b)

Lateral Pressure

c)

Rough Opening

d)

Stem Wall

19.

Engineered assemblies usually manufactured with lumber oriented flatwise and connected with light-gauge metal connector plates.

a)

Floor Trusses

b)

Lateral Pressure

c)

Rough Opening

d)

Floor Joists

20.

Solid pieces of lumber, usually the same depth as the floor joists, installed between them.

a)

Bridging

b)

Dead Load

c)

Blocking

d)

Live Load

21.

Used to keep the top and bottom of joists straight for alignment and attachment of subfloor panels.

a)

Bridging

b)

Dead Load

c)

Blocking

d)

Live Load

22.

The total of all moving and variable loads that may be placed upon a structure.

a)

Bridging

b)

Dead Load

c)

Blocking

d)

Live Load

23.

The weight of permanent, stationary construction and equipment included in a building.

a)

Bridging

b)

Dead Load

c)

Blocking

d)

Live Load

24.

Lumber with moisture removed prior to construction.

a)

Scab

b)

Seasoned

c)

Shoring

d)

Span

25.

A length of lumber applied over a joint to strengthen it.

a)

Scab

b)

Seasoned

c)

Shoring

d)

Span

26.

Temporary bracing used to support above-grade concrete slabs while they set.

a)

Scab

b)

Seasoned

c)

Shoring

d)

Span

27.

The distance between structural supports such as walls, columns, piers, beams, or girders.

a)

Scab

b)

Seasoned

c)

Shoring

d)

Span

28.

A material, such as particleboard or plywood, laid on top of the subfloor to provide a smoother surface for the finished floor.

a)

Crown

b)

Fire Stops

c)

Foundation

d)

Underlayment

29.

Approved materials used to fill air passages in a frame to retard the spread of fire.

a)

Crown

b)

Fire Stops

c)

Foundation

d)

Underlayment

30.

The supporting portion of a structure, including the footings.

a)

Crown

b)

Fire Stops

c)

Foundation

d)

Underlayment

31.

The highest point of the curved edge of a framing member.

a)

Crown

b)

Fire Stops

c)

Foundation

d)

Underlayment

32.

A metal stirrup secured to the face of a structural member, such as a girder, to support and align the ends of joists flush with the member.

a)

Precast

b)

Joist Hanger

c)

On Center

d)

Piers

33.

Distance between the center of one member (typically studs) to the center of the next member. Commonly abbreviated as OC.

a)

Piers

b)

Joist Hanger

c)

On Center

d)

Precast

34.

Structural columns used to support other structural members, typically girders or beams.

a)

Piers

b)

Joist Hanger

c)

On Center

d)

Precast

35.

Concrete structural elements that have been cast at a casting yard and raised into position using a crane.

a)

Piers

b)

Joist Hanger

c)

On Center

d)

Precast