WorksheetsMaintenance of Roads and Bridges, Project Quality Assurance DPWH
Total questions: 10
Worksheet time: 5mins
Under Road and Bridge Defects, What is the description for Code 12?
Cracks
Ravelling
Clogged Drains
Open Manhole
Response time for Code 12 - Cracks?
7 days
10 days
3 days
15 days
Defined as the standard of something as measured against other things of a similar kind.
Standard
Sampling
Quality
Assurance
Inspections, sampling and testing undertaken by the Contractor.
Quality Assurance
Quality Control
Quality Manipulation
Quality Certification
The final arbiter in the resolution of disputes between DPWH and the Contractor.
Bureau of Quality and Safety
Bureau of Construction
Bureau of Fire Protection
Bureau of Research and Standards
The method used to address a problem or nonconformance to get the root cause, for it to be eliminated, thus, preventing the problem / nonconformance from recurring.
Root Cause Design
Root Cause Dialysis
Root Cause Analysis
Root Cause Experiment
The following are the situations where the Root Cause Analysis is required, except:
Deficiencies of 10% or more of the required thickness, width, length and volume of an item of work
Minor Defects amounting to 75% of the pay item involve
Serious Defects affecting 25% of the pay item involve
Very Serious defects affecting 10% of the pay item involve
The following are some of the tests required for Subbase Course Materials, under Item 200, 201 - Aggregate Subbase & Base Course, except:
Grading Test
Slump Test
Compaction Test
Field Density Test
5500 bags of Cement are supplied to the project. As Engineer's Representative, how many Quality Test will you make?
2
3
4
1
20 tons of Reinforcing Steel are supplied to the project. As Engineer's Representative, how many Quality Test will you make?
1
2
3
4