Wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

BIM Unit 1

Total questions: 8

Worksheet time: 4mins

Name
Class
Date
1.

What is one of the learning outcomes after completing this unit?

a)

Discuss the problems in the construction industry

b)

Explain the process of BIM throughout building lifecycle

c)

Discuss the different of BIM maturity level

d)

Explain the overview of BIM

2.

According to the text, what percentage of Malaysian GDP does the construction industry contribute?

a)

2%

b)

8%

c)

4%

d)

6%

3.

How can BIM adoption benefit contractors according to the text?

a)

Reduce collaboration with other levels

b)

Decrease accuracy of the building model

c)

Improve the image of their organizations

d)

Increase errors and conflicts

4.

Based on the MacLeamy curve, when is the cost of design changes minimum?

a)

After the completion of construction

b)

Final stage of construction

c)

Middle stage of construction

d)

Early stage of construction

5.

What is the definition of BIM according to the BIM Handbook?

a)

Modelling technology and associated set of processes to produce digital information

b)

Essentially value creating collaboration through the entire life-cycle of an asset

c)

An electronic replica of a project containing geometry and data

d)

A digital representation of physical and functional characteristics of a facility

6.

According to the National BIM Standards (USA), what is BIM?

a)

Essentially value creating collaboration through the entire life-cycle of an asset

b)

An electronic replica of a project containing geometry and data

c)

A digital representation of physical and functional characteristics of a facility

d)

Modelling technology and associated set of processes to produce digital information

7.

What is the definition of BIM according to the BIM Task Group (UK)?

a)

A digital representation of physical and functional characteristics of a facility

b)

An electronic replica of a project containing geometry and data

c)

Essentially value creating collaboration through the entire life-cycle of an asset

d)

Modelling technology and associated set of processes to produce digital information

8.

As per CIDB's BIM steering committee, what is BIM?

a)

Modelling technology and associated set of processes to produce digital information

b)

Essentially value creating collaboration through the entire life-cycle of an asset

c)

An electronic replica of a project containing geometry and data

d)

A digital representation of physical and functional characteristics of a facility