Wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

NSPS

Total questions: 9

Worksheet time: 5mins

Name
Class
Date
1.

What is NSPS ?

a)

New Special Protection Scheme

b)

Northern Special Protection Scheme

c)

Northern Load Shedding Scheme

d)

Ayer Tawar- Junjung Scheme

2.

How many CP for NSPS 2024

a)

4

b)

3

c)

2

d)

1

3.

What is CP1 of NSPS

a)

n-2 ATWR-BTRK and JMJG-BTRK 500kV

b)

n-2 ATWR-JNJG 500kV L1 and L2

c)

n-2 BGJH-PAPN 275KV L1 and L2

d)

n-2 BMRH-JJNG 275kV L1 and L2

4.

What is Violation Circuit During N-2 ATWR-JJNG 500kV during low Northern Generation

a)

BGJH-PAPN 275kV L1 and L2

b)

BMRH-JJNG 275kV L1 and L2

c)

BDOR-KSTR 275kV L1 and L2

d)

PLPS-KSTR 275kV L1 and Line 2

5.

How many Staggered Load Shedding Scheme available in NSPS

a)

1 Area

b)

2 Area

c)

3 Area

d)

4 Area

6.

What is Design Control Actions in NSPS , During Violation of 275kV BGJH-PAPN 275kV L1 or L2 or 275kV BMRH-JJNG 275kV L1 or L2. After 4sec are ....

a)

Initiate HVDC Ramp Up/Back

b)

Initiate DHIS Function

c)

Initiate Start Up PLPS

d)

Initiate Start Up SKPS

7.

Why GSO need Northern SPS?

a)

Low Northern Generation

b)

Low Southern Generation

c)

Low Eastern Generation

d)

Low Central Generation

8.

What are PMU in small Area (Kota Star) load Shedding Area?

a)

PMU Kota Star

b)

PMU KSSM

c)

PMU OLPT

d)

PMU JJNG

9.

What is Power Plant available in Northern Region in the System.

a)

New Prai Power Plant

b)

Janamanjung Power Plant

c)

Tanjung Bin Power Plant

d)

Kuala Langat Power Plant