WorksheetsSoftware Development Quiz
Total questions: 10
Worksheet time: 5mins
Which phase of the Software Development Life Cycle (SDLC) takes the maximum time and cost in the long run?
Requirement Analysis
Coding
Testing
Maintenance
The primary purpose of Software Design is to:
Reduce hardware cost
Transform requirements into architecture
Debug the code
Perform maintenance
In the Waterfall Model, which phase comes immediately after Requirements Analysis?
Maintenance
Design
Testing
Coding
Which one is NOT a Software Development Life Cycle (SDLC) model?
Waterfall Model
Spiral Model
V-Model
Firewall Model
Which of the following is an example of CASE tool?
Compiler
Debugger
Rational Rose
Linker
Scope creep in software engineering refers to:
Reduction in project scope
Uncontrolled changes or growth in project scope
Formal documentation of requirements
Removing unnecessary requirements
Which metric is used to measure software complexity?
Cyclomatic Complexity
Gantt Chart
Decision Table
Use Case Diagram
The main advantage of the Spiral Model is:
No risk analysis
Focus on documentation
Risk management and iterative development
Low cost for small projects
An ERP system is mainly used for:
Scientific computing
Enterprise resource planning across departments
Mobile application development
Website hosting
Which one is not a functional requirement?
User authentication
File upload capability
System performance
Report generation
