wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

General Knowledge Uisce Éireann Quiz

Total questions: 26

Worksheet time: 16mins

Name
Class
Date
1.

What is Uisce Éireann a subsidiary of?

a)

Ervia

b)

Irish Water

c)

Bord Gáis Éireann

d)

Local Authorities

2.

When did Uisce Éireann take over responsibility for public water and wastewater services from the Local Authorities?


a)

1st January 2016

b)

January 2015

c)

1st January 2013

d)

1st January 2014

3.

Who is the economic regulator for Uisce Éireann?

a)

The Irish Government

b)

Ervia

c)

he Environmental Protection Agency (EPA)

d)
  • The Commission for Regulation of Utilities (CRU)

4.

What should be avoided when logging a contact?

a)

Capturing all necessary information

b)

Using shorthand or acronyms

c)

Using respectful language

d)

Being clear and concise

5.

Why is it important to log a customer contact?

a)

To provide a full and complete communication history of our interactions with the customer

b)

To track performance

c)

To manage inventory

d)

To monitor social media activity

6.

What is the impact of not logging or incorrectly logging a contact?

a)

It can reduce the workload of agents

b)

It can improve customer satisfaction

c)

It has no impact

d)

It can result in additional outbound calls to customers to gather missing information

7.

What does NDTFR stand for?

a)

Non-Domestic Tariff Harmonization Regulation

b)

National Domestic Tariff Framework Review

c)

Non-Domestic Tariff Harmonization Review

d)

Non-Domestic Tariff Framework Review

8.

What is one of the benefits of the new tariff framework?

a)

More complex charging structure

b)

Increased bill volatility

c)

Enhanced transparency regarding customer charges

d)

Higher costs for all customers

9.

What does AQ stand for?

a)

Annual Quality

b)

Annual Quorum

c)

Annual Quantity

d)

Annual Quota

10.

How often is the AQ calculated?

a)

Biannually

b)

Annually

c)

Quarterly

d)

Monthly

11.

What is the standing charge for Tariff Band 1 for usage prior to 1st October 2024?

a)

€83.76

b)

€43.76

c)

€33.76

d)

€56.76

12.

When will the new set of national water and wastewater business charges come into effect?

a)

1st October 2023

b)

1st October 2024

c)

1st October 2025

d)

1st October 2026

13.

What is the volumetric rate for Tariff Band 1 for usage from 1st October 2024 to 30th September 2025?

a)

€1.87/m³

b)

€2.19/m³

c)

€2.00/m³

d)

€2.50/m³

14.

Are water supply and wastewater collection services currently subject to VAT?

a)

Yes, for all services

b)

Yes, always

c)

No, except for Tankered Waste, Sludge, and Leachate

d)

No, never

15.

What must be done if a customer wants to back date further than the current accounts service agreement date?

a)

Request a Tenancy Agreement/Bill of Sale/Proof of Purchase

b)

Complete the MIMO without any documentation

c)

Inform the customer that backdating is not allowed

16.

How many calendar days in advance can MIMOs be completed?

a)

5 days

b)

10 days

c)

15 days

d)

30 days

17.

When can 'The Occupier' be used while performing a MIMO?

a)

When all attempts to establish the new customer have failed

b)

When the new customer is on the phone

c)

When the customer is moving out

18.

According to the CRU definition, what constitutes a complaint?

a)

A customer making a payment

b)

A customer providing negative feedback

c)

A customer expressing dissatisfaction with an expectation for a response

d)

A customer asking for information

19.

What should agents do if a customer is not happy with the response to a complaint?

a)

Advise customer that UÉ cannot help

b)

Escalate the complaint to the Customer Service Manager

c)

Close the complaint immediately

d)

Transfer the call to manager

20.

What is the timeframe for contacting a customer with a resolution or plan for a complaint?

a)

Within 5 days

b)

Within 7 days

c)

Within 3 days

d)

Within 1 day

21.

What is a 'Green' complaint?

a)

A high-profile complaint

b)

A standard complaint requiring follow-up

c)

A note of dissatisfaction with no further follow-up required

d)

A serious complaint with health and safety impact

22.

What is the role of the Environmental Protection Agency (EPA) in relation to Irish Water?

a)

To handle all customer complaints

b)

To manage billing queries

c)

To protect and improve the environment

d)

To regulate customer service

23.

What is the timeframe for resolving complaints as per the code of practice?

a)

Within 2 months

b)

Within 1 month

c)

Within 4 months

d)

Within 3 months

24.

Which reading pattern most commonly indicates a potential leak?

a)
  • E → A

b)
  • A → E

c)
  • E → E

d)
  • A → A with a sudden spike in

25.

Which scenario describes a shared supply?

a)

A business with two meters

b)

One meter supplying multiple units (e.g., shop and an apartment)

c)

A property with sprinkler systems

d)

Two neighbours sharing a bill intentionally

26.

What is the highlighted part on the image called.

4 lines