wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

garys 05

Total questions: 26

Worksheet time: 13mins

Name
Class
Date
1.

which of the following types of drawing shows a plan view of the building site and surrounding arera

a)
Floor plan
b)
Blueprint
c)
Site plan
d)
Elevation drawing
2.

which of the following scales should should be used to draw a block plan

a)
1:500
b)
1:1000
c)

1:1250

d)
1:50
3.

what piece of equipment should be used to interpret dimensions and measurements on an original working drawing

a)
Caliper
b)
Compass
c)
Protractor
d)
Scale ruler
4.

if an inaccuracy is found on a working drawing what action should be taken?

a)
Ignore the inaccuracy and proceed with the project.
b)

report to the supervisor

c)
Make a note of the inaccuracy but do not correct it.
d)
Only inform the client about the inaccuracy.
5.

what is a site datum used for?

a)
A site datum is used to provide a reference point for elevation and level measurements.
b)
A site datum is used to measure temperature variations.
c)
A site datum is a type of construction material.
d)
A site datum is used for landscaping purposes.
6.

what does the abreviation RWP on a working drtawing stand for?

a)
Reinforced Wood Panel
b)

rain water pipe

c)
Rigid Wall Partition
d)

Reinforced Waste Pipe

7.

what must be completed before new construction work commences

a)

laying concrete foundations

b)

erect steel frames

c)
Hire workers before securing funding.
d)

removal of vegetation

8.

why is it important to clear the site before setting out

a)

to allow drains to be laid

b)

to prepare for offices

c)

to remove any obstacles

d)

to clear the way for deliverys

9.

what is the MOST important reason for locating an existing drainage system before site work begins

a)

to make sure plans can be updated

b)

to make sure the working area is safe

c)

to prevent interuptions to the service

d)

to establish the site datum

10.

what document should be used to locate existing services

a)

detailed drawing

b)

programme of work

c)

risk assesment

d)

local authority records

11.

which document should detail the safe sequence for isolating existing services

a)

programme of work

b)

risk assessment

c)

detailed drawing

d)

method statement

12.

what welfare facilities are required on a construction site with 5 workers present

a)

security office and drying room

b)

toilets and first aid box

c)

first aid box and tool store

d)

drying room and toilets

13.

which tool is needed when setting out a right angled quoin

a)

builders square

b)

line and pins

c)

brick trowel

d)

bolster

14.

what tool is best to transfer levels across the site

a)

wheelbarrow

b)

laser level

c)

string line

d)

hard hat

15.

how can an optical level be checked for accuracy

a)

vertically check it against a door

b)

compare it against a straight edge

c)

rotate it 180 degrees

d)

manufacturers calibration

16.

which one of the following is used top calculate the perimeter of a building

a)

l x w x 2

b)

l2 x w2

c)

2l x 2w

d)

2l + 2w

17.

which ratio can be used when setting out a right angled corner

a)

2.4.6

b)

3.5.9

c)

3.4.5

d)

1.2.3

18.

during the setting out process where should a datum height be transferred to

a)

corners of the building

b)

ceiling joists

c)

middle of the floor

d)

window head

19.

what action should be used before using an optical square for the firs time

a)

ensure the staff fully extends

b)

chevck the lens caps are secure

c)

ensure the carry case is intact

d)

read the manufacturers instructions

20.

why is it important to use temporary profiles when setting out

a)

to enable site to be cleared

b)

to check dimensions accuratley

c)

to give support to foundations

d)

cos temporary ones are well good

21.

why should profiles be set back from the proposed building

a)

to avoid damage whilst excavating

b)

so you dont trip over them

c)

for access to lay drains

d)

so the string can be pulled tighter

22.

what is the main reason that profiles should be protected from damage

a)

to prevent the trench collapsing

b)

because wood is expensive

c)

to avoid inaccuracies

d)

because nobody will repair them

23.

which of the following should be used to transfer information from a datum to the concrete foundation

a)

ranging line

b)

tape measure

c)

builders square

d)

timber profile

24.

which tool is essential for ensuring accurate vertical alignment during construction?

a)

spirit level

b)

tape measure

c)

compass

d)

protractor

25.

what is the main reason for conducting a risk assessment before starting construction work?

a)

to estimate the project cost

b)

to identify potential hazards and implement safety measures

c)

to determine the number of workers needed

d)

to finalize the construction timeline

26.

how do you transfer the string line down onto the concrete foundation to mark ready for brickwork

a)

stick your head over the line and guess

b)

drop a quid from the string to the floor and mark where it lands

c)

get Dinaras to do it cos he's a legend

d)

use a spirit level and plumb down marking 2 points and joining up to create your line