Worksheets

S26 Service

Total questions: 15

Worksheet time: 8mins

Name
Class
Date
1.

What is the purpose of identifying and implementing allowances for services to be installed?

a)

To ensure proper budgeting and planning

b)

To increase construction costs

c)

To delay project timelines

d)

To reduce the quality of materials

2.

What is the impact of time-dependent effects in construction?

a)

Creep

b)

Expansion

c)

Color change

d)

Material hardening

3.

What is necessary to tap into relevant services?

a)

Permission from the relevant authority

b)

A map of the area

c)

A list of service providers

d)

A financial report

4.

What is a consideration regarding the placement of services?

a)

Whether they are underground or overhead

b)

The color of the service

c)

The brand of the service

d)

The age of the service

5.

What is the purpose of contacting 'Dial before you Dig'?

a)

To get a building permit

b)

To locate and get all services full set of location drawings

c)

To schedule a construction inspection

d)

To order construction materials

6.

What should be checked on the land title before installing building services?

a)

The presence of a septic tank

b)

Whether an easement has been constructed

c)

The depth of the connection point

d)

The type of soil

7.

Who should be consulted for the connection point of building services?

a)

The construction manager

b)

The local authority

c)

The building owner

d)

The architect

8.

What must be done to the existing sewer pie inlet before construction begins?

a)

It must be painted

b)

It must be capped

c)

It must be relocated

d)

It must be expanded

9.

What is one of the first steps in establishing a sewer connection for a building site?

a)

Install the pipes immediately

b)

Locate the connection point and reference its depth

c)

Contact the local government

d)

Begin construction of the building

10.

In older suburbs, how is the NBN supply likely to be provided?

a)

Overhead

b)

Underground

c)

Wireless

d)

Satellite

11.

What is the primary purpose of mechanical services (HVAC) in buildings?

a)

To provide lighting

b)

To ensure structural integrity

c)

To provide comfortable and safe heating, ventilation, and air-conditioning

d)

To enhance aesthetic appeal

12.

What is the primary purpose of surface drainage systems?

a)

To remove excess water from land quickly and in a controlled manner.

b)

To increase water levels in natural watercourses.

c)

To prevent water from entering artificial drainage systems.

d)

To enhance the aesthetic value of landscapes.

13.

Which of the following is NOT an objective of the drainage system as mentioned in the document?

a)

Conserve water and energy.

b)

Safeguard the environment.

c)

Increase the amount of stormwater.

d)

Safeguard public and private infrastructure.

14.

Would we have a sewer as an open drain in Australia?

a)

Yes, always

b)

No, never

c)

Sometimes, depending on the area

d)

Only in rural areas

15.

What does building technology refer to in the context of construction?

a)

Tools, techniques, methods, and processes

b)

Only tools and equipment

c)

Just the design aspect

d)

Financial management