Understanding Design Constraints

Total questions: 15

Worksheet time: 8mins

Name
Class
Date
1.

Which of the following is NOT listed as an influence or constraint on design in the document?

a)

Resources

b)

Local environment

c)

Local planning and building control requirements

d)

Weather conditions

2.

According to the document, what must learners understand about design?

a)

Influences and constraints

b)

Artistic styles

c)

Historical contexts

d)

Technological innovations

3.

What is the purpose of understanding the needs of a client in the context of the document?

a)

To design a low-rise building

b)

To design a high-rise building

c)

To design a bridge

d)

To design a park

4.

What is the purpose of understanding local planning and building control requirements?

a)

To ensure compliance with regulations

b)

To enhance aesthetic appeal

c)

To improve energy efficiency

d)

To increase construction speed

5.

What is the cost per square meter according to the example?

a)

£6000/m²

b)

£8000/m²

c)

£7000/m²

d)

£9000/m²

6.

What is the primary focus of the example given?

a)

Design aesthetics

b)

Cost efficiency

c)

Floor area analysis

d)

Material quality

7.

If a retail unit costs £2,000,000 and the cost per square meter is £4000, what is the floor area?

a)

500 m²

b)

600 m²

c)

700 m²

d)

800 m²

8.

A retail unit has a floor area of 400 m² and a cost per square meter of £3500. What is the total cost?

a)

£1,400,000

b)

£1,500,000

c)

£1,600,000

d)

£1,700,000

9.

If a retail unit has a cost of £4,000,000 and a floor area of 800 m², what is the cost per square meter?

a)

£5000/m²

b)

£4500/m²

c)

£5500/m²

d)

£6000/m²

10.

What is the role of structural engineers in initial costs?

a)

To approve the final design

b)

To agree on fees for investigations and surveying

c)

To manage unexpected costs

d)

To determine life cycle costs

11.

What must be included in a budget to handle unexpected expenses?

a)

Initial costs

b)

Life cycle costs

c)

Contingencies

d)

Design fees

12.

What is the main focus of initial costs in a project?

a)

Long-term maintenance

b)

Concept design and scoping

c)

Unexpected expenses

d)

Final construction

13.

Which costs are associated with ensuring project stability?

a)

Initial costs

b)

Life cycle costs

c)

Contingencies

d)

Marketing costs

14.

What should specifications align with according to the document?

a)

Customer preferences

b)

Budget

c)

Market trends

d)

Employee needs

15.

Why might certain areas like a bank's entrance receive more funding?

a)

To improve employee satisfaction

b)

To enhance security

c)

To attract customers

d)

To reduce costs