wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

306 hot water systems 1 Quiz

Total questions: 20

Worksheet time: 15mins

Name
Class
Date
1.

Between what temperatures does the bacteria Legionella multiply?

a)

15–35°C

b)

20–25°C

c)

20–45°C

d)

25–35°C

2.

Identify the item shown here.

a)

Cylinder thermostat

b)

Boiler thermostat

c)

Immersion heater thermostat

d)

Room thermostat

3.

At what temperature should the hot water in a hot water cylinder be stored at?

a)

40°C

b)

50°C

c)

60°C

d)

70°C

4.

According to the Water Supply (Water Fittings) Regulations, at less than what temperature should the hot water in a domestic property not be distributed?

a)

55°C

b)

65°C

c)

45°C

d)

35°C

5.

The HSE state in their guidance about 'the control of Legionella bacteria in water systems' that the return temperature on a secondary return system should not be less than…

a)

70°C

b)

60°C

c)

50°C

d)

40°C

6.

What is the approximate temperature range for instantaneous water heaters?

a)

15–35°C

b)

20–45°C

c)

35–55°C

d)

45–65°C

7.

Identify the item shown here.

a)

Flow reducing valve

b)

Pressure regulating valve

c)

Thermostatic mixer valve

d)

Thermostatic regulating valve

8.

In a newbuild domestic property, where must the item in Question 7 be installed?

a)

Prior to every hot water outlet

b)

Prior to the hot water cylinder

c)

Prior to a bath

d)

Prior to a shower

9.

How is the temperature of the hot water produced by a combination boiler varied?

a)

Altering the pressure of the water

b)

Higher or lower gas rates

c)

Controlled via a mixer valve

d)

Changing the flow rate of the water

10.

Which Approved Document covers hot water installation temperatures?

a)

Part L

b)

Part H

c)

Part G

d)

Part P

11.

Which British Standard states the capacity of the hot water cylinder based on the number of persons occupying the property?

a)

BSEN12056

b)

BSEN806

c)

BS1010

d)

BS8000

12.

Which of the following is not a design criteria for the D1 and D2 pipework?

a)

The tundish must be installed within 600mm of the cylinder

b)

The D2 pipework can be made from copper and PVCu

c)

The D2 pipework must fall continuously over its entire length

d)

The D1 must not be smaller than the outlet of the temperature pressure relief valve

13.

The design rule for 22mm D2 pipework is that it should not offer a hydraulic resistance greater than what distance?

a)

1.0m

b)

5.0m

c)

9.0m

d)

11.0m

14.

By how much does water expand when it is heated between 4°C and 99°C?

a)

4%

b)

5%

c)

6%

d)

7%

15.

According to BSEN806 Part 4, a newly installed hot water pipework system should be flushed through with which of the following?

a)

Drinking water

b)

Hot water

c)

Chlorinated water

d)

Cold water

16.

What happens in the commissioning process immediately after the disinfection has taken place?

a)

Handed over to the customer

b)

Secondary fill takes place

c)

Temperature and pressure readings are taken, along with flow rates

d)

The Benchmark certificate and commissioning records are completed

17.

What units does a weir cup measure in?

a)

Bar

b)

Millimetres

c)

Litres per minute

d)

Degree centigrade

18.

Which one of the following will not cause poor flow rates in a system?

a)

Poor design

b)

Blockage

c)

Fullway gate valve

d)

Stop valve

19.

When carrying out maintenance on an appliance, which document should be followed?

a)

Approved Document Part G

b)

BSEN806

c)

Manufacturer's instructions

d)

BS8000

20.

Which one of the following would not be part of a PPM schedule?

a)

Adjusting water levels

b)

Burst pipes

c)

Cleaning filters

d)

Checking the operation of valves