wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Well Completion

Total questions: 31

Worksheet time: 16mins

Name
Class
Date
1.

"Well completion" is the process of preparing a well for ___.

a)

production

b)

drilling

c)

exploration

d)

inspection

2.

_______are the samll holes made in the casing.

a)

demonstration

b)

cement

c)

open hole

d)

perforation

3.

Casing helps keep the well ___.

a)

unstable

b)

clean

c)

stable

d)

shallow

4.

The success of their major product _________ the firm's position in the market.

a)

consolidated

b)

sold

c)

bought

d)

failed

5.

Tubing is used to carry oil or gas from the well to the ___.

a)

surface

b)

bottom

c)

reservoir

d)

pipeline

6.

Perforations in the casing allow oil or gas to ___ the well.

a)

enter

b)

exit

c)

block

d)

seal

7.

The purpose of well completion is to ensure safe and ___ production.

a)

efficient

b)

slow

c)

expensive

d)

hazardous

8.

___ helps to increase the flow of oil or gas from the reservoir.

a)

Fracturing

b)

Drilling

c)

Pumping

d)

Sealing

9.

The steel pipes placed in the well are called ___.

a)

casing

b)

tubing

c)

drill pipe

d)

liner

10.

Cementing helps to keep the casing ___ in place.

a)

stable

b)

loose

c)

fragile

d)

unsteady

11.

Equipment used to control the flow of oil or gas is called ___.

a)

tools

b)

tubing

c)

drills

d)

pumps

12.

Perforations are small ___ in the casing.

a)

dents

b)

holes

c)

pipes

d)

drills

13.

A ___ is sometimes added to block fluid movement.

a)

packer

b)

cement

c)

drill

d)

reservoir

14.

Well completion includes all steps to make the well ready for ___.

a)

workers

b)

weather

c)

production

d)

cleaning

15.

Steel casing stops the well from ___.

a)

collapsing

b)

stopping

c)

leaking

d)

overheating

16.

Cement ___ is used to keep casing in place.

a)

liquid

b)

powder

c)

paste

d)

gel

17.

___ is done to prepare the well for safe production.

a)

Completion

b)

workover

c)

Blowout

d)

complement

18.

Well completion is important to prevent ___ of oil or gas.

a)

loss

b)

contamination

c)

overproduction

d)

burning

19.

In the past, workers ___ long hours without advanced equipment.

a)

used to work

b)

use to work

c)

used work

d)

are used to work

20.

Modern oil rigs ___ require as much manual labor as they used to.

a)

didn't use to

b)

don't use to

c)

don't used to

d)

doesn't use to

21.

Did engineers ___ complex software for well logging in the past?

a)

used to use

b)

used to using

c)

use to use

d)

using to use

22.

There are ___ safety checks to complete before starting drilling operations.

a)

a lot of

b)

much

c)

few

d)

enough

23.

Workers ___ handle hazardous materials without protective gear in the past.

a)

used to

b)

are used to

c)

use to

d)

will use to

24.

Good teachers should ask questions that _______ students to think.

a)

force

b)

stimulate

c)

push

d)

like

25.

How ___ experience do new engineers need to work on offshore rigs?

a)

much

b)

many

c)

few

d)

little

26.

Before modern technology, workers ___ perform all calculations by hand.

a)

used to

b)

have to

c)

need to

d)

ought to

27.

Nowadays, ___ tools are available to make drilling safer.

a)

A lot

b)

no

c)

a lot of

d)

A lot of

28.

___ companies used to invest in safety training, but now it's standard.

a)

Few

b)

Many

c)

All

d)

Some

29.

First, a ----------- is placed in the well to protect it from collapse and prevent fluids from leaking.

a)

cement

b)

casing pipe

c)

perforation

d)

drillstring

30.

It's very ________ that you live near the office.

a)

fast

b)

close

c)

far away

d)

convenient

31.

There are two types of well completion:_________and __________

a)

open hole-cased hole

b)

christamas tree- BOP

c)

cement- casing

d)

gravel-sand screen