Wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Nuclear Lifecycle 8

Total questions: 10

Worksheet time: 6mins

Name
Class
Date
1.

Which of these are reasons to decommission a nuclear facility?

a)

Political decision

b)

Economical reasons

c)

Following an accident

d)

Public perception

2.

What is the most common decommissioning option in the USA?

a)

Immediate dismantling (decon)

b)

Deferred dismantling (safstor)

c)

Entombment

d)

None

3.

What is the main advantage of deferred dismantling?

a)

To allow radioactivity to decay

b)

To save money

c)

To use workers from the facility

d)

To ensure there are no changes to legislation

4.

How many reactors have been entombed?

a)

3

b)

4

c)

5

d)

6

5.

How is decommissioning funded? (select all that apply)

a)

Prepayment into a a dedicated account

b)

Sinking fund on electricity rates to consumers

c)

Insurance

d)

By the government

6.

Which was the first power station in the UK to be decommissioned?

a)

Berkeley

b)

Sizewell

c)

Dungeness

d)

Heysham

7.

Why are Magnox and AGR reactors expensive to decommission?

a)

They are old

b)

They use graphite

c)

They are very large

d)

They are gas cooled

8.

Why is graphite difficult to decommission?

a)

It takes up a lot of space

b)

It contains C-14 as an irradiation product

c)

It can't be recycled

d)

It burns too easily

9.

What is the main barrier for recycling materials from decommissioned nuclear facilities?

a)

Public acceptance

b)

Cost

c)

Restrictions on release limits

d)

Lack of facilities

10.

Where is the UK's metal recycling facility?

a)

Drigg in Cumbria

b)

Hinckley Point in Somerset

c)

Lillyhall in Cumbria

d)

Westinghouse in Lancashire