MDJ33102 - QUIZ

Total questions: 10

Worksheet time: 5mins

Name
Class
Date
1.

What is forecasting?

a)
Process of predicting a future event
b)

Process of predicting ability of event

c)

Process of predicting a good work

d)

Process of predicting forecast

2.

What is the Influence of product cycle life?

a)

Introduction-Growth-Cycle up-Decline

b)

Introduction-Growing-Matureity-Decline

c)

Introduction-Growth-Maturity-Decline

d)

Introduction-Developing-Amature-Deadth

3.

The classification of medium range time horizon?

a)

up to 3 months of sales and production planning, budgeting

b)

3 years of sales and production planning, budgeting

c)

3 months range to 3 years

d)

up to 1 year, less than 3 months

4.

Jury of executive opinion _.

a)

Combines managerial experience with statistical models.

b)

Combined at district and national levels

c)

What consumers say, and what they are doing oftenly different

d)

Require extensive historical data

5.

Type of forecast?

a)
  1. 1. Economics factor.

  2. 2. Technology requirement.

  3. 3. Demand for market

b)
  1. 1. Economics forecast.

  2. 2. Technological forecast.

  3. 3. Demand forecast.

c)
  1. 1. Economics future.

  2. 2. Advanced Technology.

  3. 3. Customer demand.

d)
  1. 1. Economics advantages.

  2. 2. Technology demand.

  3. 3. Demand forecast.

6.

What is capacity?

a)

The throughput, or the forecast number of units a facility, receive, store, or produce for future.

b)

The throughput, or the capacity of units a facility can sell, buy, store, or produce in a period of time.

c)

The throughput, or the number of units a facility, receive, store, or produce in a period of time.

d)

The throughput, or the number of units a facility can hold, receive, store, or produce in a period of time.

7.

What is the different demand exceed capacity (DEC) and capacity exceed demand (CED).

a)

(DEC) - Produce products with complementary demand patterns.

(CED) - Stimulate market / Product changes.

b)

(DEC) - Curtail / reduce demand by raising prices, scheduling longer lead time / waiting time.

(CED) - Stimulate market / Product changes.

c)

(DEC) - Curtail / reduce demand by raising prices, scheduling longer lead time / waiting time.

(CED) - Produce products with complementary demand patterns

d)

(DEC) - Curtail / reduce demand by raising prices, scheduling longer lead time / waiting time.

(CED) - Relates with current situation.

8.

Which one is not true for capacity considerations.

a)

Design and build new capacity.

b)
  1. Find the optimum
    operating level

c)

Forecast demand accurately.

d)
  1. Understand the technology and capacity increments

9.

What determine capacity planning?

a)

Fixed cost.

b)

Demand will be exceed.

c)

Fixed demand changes.

d)

Demand will be exceed.

10.

Efficiency formula.

a)

Effective capacity / Efficiency

b)

Actual output / Effective Capacity.

c)

Actual output / Design Capacity.

d)

Actual capacity / Effective Capacity.