What is forecasting?
Process of predicting ability of event
Process of predicting a good work
Process of predicting forecast
What is the Influence of product cycle life?
Introduction-Growth-Cycle up-Decline
Introduction-Growing-Matureity-Decline
Introduction-Growth-Maturity-Decline
Introduction-Developing-Amature-Deadth
The classification of medium range time horizon?
up to 3 months of sales and production planning, budgeting
3 years of sales and production planning, budgeting
3 months range to 3 years
up to 1 year, less than 3 months
Jury of executive opinion _.
Combines managerial experience with statistical models.
Combined at district and national levels
What consumers say, and what they are doing oftenly different
Require extensive historical data
Type of forecast?
1. Economics factor.
2. Technology requirement.
3. Demand for market
1. Economics forecast.
2. Technological forecast.
3. Demand forecast.
1. Economics future.
2. Advanced Technology.
3. Customer demand.
1. Economics advantages.
2. Technology demand.
3. Demand forecast.
What is capacity?
The throughput, or the forecast number of units a facility, receive, store, or produce for future.
The throughput, or the capacity of units a facility can sell, buy, store, or produce in a period of time.
The throughput, or the number of units a facility, receive, store, or produce in a period of time.
The throughput, or the number of units a facility can hold, receive, store, or produce in a period of time.
What is the different demand exceed capacity (DEC) and capacity exceed demand (CED).
(DEC) - Produce products with complementary demand patterns.
(CED) - Stimulate market / Product changes.
(DEC) - Curtail / reduce demand by raising prices, scheduling longer lead time / waiting time.
(CED) - Stimulate market / Product changes.
(DEC) - Curtail / reduce demand by raising prices, scheduling longer lead time / waiting time.
(CED) - Produce products with complementary demand patterns
(DEC) - Curtail / reduce demand by raising prices, scheduling longer lead time / waiting time.
(CED) - Relates with current situation.
Which one is not true for capacity considerations.
Design and build new capacity.
Find the optimum
operating level
Forecast demand accurately.
Understand the technology and capacity increments
What determine capacity planning?
Fixed cost.
Demand will be exceed.
Fixed demand changes.
Demand will be exceed.
Efficiency formula.
Effective capacity / Efficiency
Actual output / Effective Capacity.
Actual output / Design Capacity.
Actual capacity / Effective Capacity.