L2 Principles of Construction CL Part 1

Total questions: 26

Worksheet time: 20mins

Name
Class
Date
1.

Which document is used to give details that cover the construction, features, materials & finishes of a job?

a)

Work programme

b)

Purchase order

c)

Policy document

d)

Specification

2.

Which are 2 types of communication?

a)

Verbal & written

b)

Telephones & email

c)

Meetings & memos

d)

Plans & Faxes

3.

How do you measure a perimeter?

a)

2 x length + 2 x width

b)

Length + width

c)

Length x width

d)

3.142 x 2

4.

Which documents tells you how much you owe for materials?

a)

Work programme

b)

Purchase order

c)

Invoice

d)

Job specification

5.

What is an estimate?

a)

An approximate price

b)

A fixed price

c)

A bid

d)

A quotation

6.

On a drawing, you see the letters BWK. What does it mean?

a)

Architects signature

b)

Building work in keeping

c)

Brickwork

d)

Brick work in keeping

7.

When you see the acronym HVAC on a drawing what does it mean?

a)

Heavy Vehicle Access Crane

b)

Heating, Ventilation & Air Conditioning

c)

Hot Vents & Air Conditioning

d)

Hard Ventilation & Access Corridor

8.

When does the communication start in a message?

a)

When it has been received

b)

When it has been understood

c)

When it has been forwarded

d)

When it has been saved

9.

What is the least important expectation of an employer?

a)

Appearance

b)

Reliability

c)

Trust

d)

Honesty

10.

Which piece of information is not required when taking a message?

a)

Date

b)

Name of person calling

c)

The weather conditions on the site

d)

Name of the person the message is for.

11.

What does a block plan show?

a)

Identifies the proposed site in relation to the surrounding area

b)

Shows how many floors the building has

c)

Shows where the services are going

d)

Identifies all the components

12.

Which job role does not belong in the Building Industry?

a)

Electrician

b)

Foreman

c)

Roofer

d)

Site chef

13.

How many sheets of MDF would you need to cover an area 5m long and 6.25m wide, (sheets measure 1.2m x 2.4m). Nearest full sheet.

a)

9

b)

10

c)

11

d)

12

14.

The length of a room is 9m wide and is 13m long. What is the total perimeter?

a)

22m

b)

44m

c)

88m

d)

176m

15.

Where are the site drawings kept?

a)

Site office

b)

Canteen

c)

Works van

d)

Welfare office

16.

Which one of these is not a protected characteristic?

a)

Race

b)

Age

c)

Colour

d)

Disability

17.

Who is the Craft foreman responsible to?

a)

The Joiner

b)

General Foreman

c)

The Client

d)

The First aider

18.

How many sides does a meter cube have?

a)

3

b)

4

c)

6

d)

8

19.

What sign has a Green background and white lettering?

a)

Mandatory

b)

Information

c)

Warning

d)

Prohibition

20.

How is volume measured?

a)

L x W x H

b)

L x W

c)

D x L x P

d)

P x C

21.

What does the abbreviation DPM mean?

a)

Don’t push me

b)

Damp proof membrane

c)

Dust preventative method

d)

Danger mark position

22.

In what capacity is concrete ordered by?

a)

Cubic yard

b)

Cubic feet

c)

Cubic metre

d)

Cubic mile

23.

A contract document that would state the quality of workmanship and the type of materials required is known as,

a)

An invoice

b)

A specification

c)

Architects instruction

d)

A drawing

24.

What direction is indicated on a site plan or a block plan?

a)

East

b)

North

c)

West

d)

South

25.

What is the most common form of communication used by site carpenters?

a)

Text message

b)

Spoken word

c)

Written memo

d)

Hand gestures

26.

Who is it that employs an Architect?

a)

Contracts manager

b)

Operative

c)

The Client

d)

Local authority