WorksheetsPlanning Quiz
Total questions: 10
Worksheet time: 5mins
What is the first stage of a typical construction project?
Tendering
Construction
Design
Maintenance
Who creates the working drawings based on the client’s requirements?
Quantity Surveyor
Architect
Clerk of Works
Estimator
What does an estimator do during the tendering process?
Supervises construction work
Inspects the quality of the work
Calculates the project's total cost
Creates the building design
In a fixed-price contract, who covers increased costs after the contract is signed?
Client
Contractor
Estimator
Subcontractor
What document lists all the parts needed to build a product?
Specification
Take-off sheet
Drawing
Bill of Materials
Which role is responsible for inspecting and checking work on-site?
Clerk of Works
Contracts Manager
Estimator
Project Manager
Which of these is part of the electrical project stages?
Planning
Design
Evaluation
Inspection
During tendering, what do electrical contractors submit to win the contract?
Designs
Specifications
Tenders
Drawings
Which type of structure is common in smaller firms?
Horizontal
Vertical
Circular
Matrix
What does the Quantity Surveyor monitor?
Safety regulations
Project deadlines
Material quality
Labor costs