1.

Which piece of UK legislation places responsibilities on workers when using personal information?

a)

The Data Protection Act

b)

Privacy Amendment (Private Sector) Act

c)

Personal Information Protection and Electronic Documents Act

d)

The Privacy Act

2.

If at work you lose some sensitive customer information, who should you inform?

a)

Police

b)

Supervisor

c)

Data protection officer

d)

Human resources

3.

What does the acronym CAD stand for?

a)

Centrally accessed database

b)

Computer-aided design

c)

Computer-aided data

d)

Coded access data

4.

What type of maintenance is carried out on a regular basis, an example being servicing a boiler?

a)

Corrective maintenance

b)

Preventive maintenance

c)

Planned maintenance

d)

Reactive maintenance

5.

Which document summarises the performance and other technical characteristics of each construction product, material or component?

a)

Product data sheet

b)

Manufacturer’s specification

c)

Bill of quantities

d)

COSHH data sheet

6.

Which document provides the technical characteristics of a construction product?

a)

Product data sheet

b)

Manufacturer’s specification

c)

Bill of quantities

d)

Material data sheet

7.

What does an EPC certificate provide detail on?

a)

Construction methods

b)

Building occupancy

c)

Energy performance

d)

Building sustainability

8.

What system is an intelligent 3D model-based process that provides insight and tools to efficiently plan, design, construct and manage buildings and infrastructure projects?

a)

Building information modelling

b)

Asset information modelling

c)

Common data environment

d)

Employers’ information requirements

9.

What is the first stage of data used in building information modelling?

a)

Planning

b)

Design

c)

Building

d)

Post-completion

10.

What is the name of the single source used to collect and manage information, documentation, the graphical model and non-graphical data gathered by the whole project team?

a)

Customer information modelling

b)

Asset information modelling

c)

Common data environment

d)

Building information requirements

11.

Which report is completed following a close examination of the structure of a building and a visual examination of the services?

a)

Commissioning schedule

b)

Condition report

c)

Test schedule

d)

Completion report

12.

Work can be signed off as meeting the requirements of the building regulations by an individual or company under which circumstances?

a)

They are a member of the Competent Person’s Scheme

b)

They are set up as a limited company

c)

They hold a Level 3 NVQ in their occupation

d)

They have completed the work using BIM

13.

What type of chart is used to show the timeline and status for each task in a construction project?

a)

Scatter

b)

Pie C

c)

Bar C

d)

Gantt

14.

What type of data should be used with portable drives to maintain security?

a)

Encrypted

b)

Structured

c)

Open

d)

Dark

15.

In computing, what is the specific class of computer software that provides the low-level control for a device's hardware?

a)

Updates

b)

Firmware

c)

Trojan

d)

Malware

16.

What is the name given to data stored online?

a)

Cloud storage

b)

Physical storage

c)

Tertiary storage

d)

Primary storage

17.

What name is given to the fraudulent practice of sending emails purporting to be from reputable companies in order to induce individuals to reveal personal information?

a)

Ransomware

b)

Phishing

c)

Spyware

d)

Password cracking

18.

What phrase is used to describe viruses, worms, Trojan horse attack applets and attack scripts?

a)

Spam

b)

Phishing

c)

Malware

d)

Virus

19.

What type of drawing is shown below?

4 lines
20.

What type of drawing is used to show the physical connections and physical layout of an electrical system or circuit?

a)

Mechanical systems drawing

b)

Circuit diagram

c)

Wiring diagram

d)

Schematic drawing