Voice of the Customer Quiz

Total questions: 38

Worksheet time: 39mins

Name
Class
Date
1.

Voice of the customer can be obtained from which of these?

a)

market research

b)

Historical warranty and quality information

c)

Team experience

d)

all the above

2.

________________________ is a systematic approach to identifying standards for comparison

a)

Bench marking

b)

product design

c)

process design

d)

None

3.

This type of data considers frequency of repair or replacement of components within designated periods of time and the results of long-term reliability/durability tests.

a)

Product reliability studies

b)

bench marking

c)

customer inputs

d)

flow chart

4.

The translation of the Voice of the Customer into measurable design of objectives is known as -------------

a)

Design goals

b)

voice of customer

c)

process chart

d)

PVT

5.

The anticipated manufacturing process should be described using a -------------------------------- developed from the preliminary bill of material and product/process assumptions.

a)

Process flow chart

b)

Bill of material

c)

Design goals

d)

Product assumption

6.

DFMEA stands for ____________________________

a)

Design Failure Mode and Effects Analysis

b)

Design Failure Means and Effects Allocation

c)

Deign fault make effect Analysis

7.

The process of verifying that the product design meets the customer requirements are known as --------------------------

a)

Design verification

b)

Design validation

c)

Process verification

d)

all the above

8.

The mechanism of monitoring progress, report to management, and obtain customer approval as required is -----------------

a)

Design reviews

b)

Design goal

c)

Process flow chart

d)

None

9.

The --------------------------------- are a description of the dimensional measurements and material and functional tests that will occur during prototype build.

a)

Prototype Build-Control plan

b)

Production plan

c)

Control plan

d)

All the above

10.

(a)   is a framework of procedures and techniques used to develop products in industry

11.

APQP has ------- number of phases

(a)  

12.

Third phase in APQP is --------

4 lines
13.

The ________________ is the pictorial representation of actual process

4 lines
14.

Standard symbols showcase the different activities connecting by means of ------------ on a process flow chart

(a)  

15.

An activity that makes physical change or added value to the product like packing, labelling known as ----------------------

4 lines
16.

An activity that makes no physical change or added value to the product is known as ----------------------

4 lines
17.

Example for non value added activity are -------------

a)

Accounting

b)

servicing

c)

Inspection

18.

The ________________ is the pictorial representation of actual process

4 lines
19.

The ______________ QC tool will help you to separate vital few from trival many

a)

Pareto chart

b)

Histogram

c)

scatter diagram

d)

pareto chart

20.

The -------------QC tool will analyse the data based on 80/20 principle.

a)

Pareto chart

b)

Histogram

c)

scatter diagram

d)

pareto chart

21.

A _______________is a type of bar chart frequency of occurrence of continuous data

a)

Histogram

b)

PARETO CHART

c)

Histogram

d)

scatter diagram

22.

SPC stands for -------

a)

Statistical Process control

b)

statistical part control

c)

Statistical Process control

d)

statistical Production control

23.

SCP stands for --------

a)

Single chip package

b)

single chip package

c)

sample production part

24.

SCM stands for -------

4 lines
25.

Plant layout is depend on _______, ________________ and _______

a)

size of plant

b)

Nature of process

c)

Management caliber

26.

What is abbreviation of PPAP

a)

Production part Approval Process

b)

Part process approval process

c)

Process production Approval Process

d)

Production part approval

27.

What is abbreviation for PSW

a)

Part Submission Warrant

b)

Part Submission Warrant

c)

Part Special Warranty

d)

Product submission warrant

28.

When PPAP is required

a)

All of them

b)

New Part or product

c)

Engineering Change

d)

Process Change

29.

Fish bone diagram is also known as?

a)

Both

b)

Cause and effect chart

c)

Ishikawa diagram

d)

histogram

30.

Which among the following depicts positive and negative relation between driving factor and performance factor?

a)

Scatter diagram

b)

control chart

c)

Histogram

31.

To anticipate failures and prevent them from happening is the objective of FMEA.

4 lines
32.

What is RPN?

a)

Risk Priority Number

b)

Risk Preventive number

c)

Risk prevention number

d)

Risk protective Number

33.

Which of the following is not a benefit of FMEA?

a)

Maximize late changes and associated cost

b)

Increase in customer satisfaction

c)

Prioritize product/process deficiencies

34.

RPN = _________x _________x______________

a)

severity x occurrence x detection

b)

measurement x occurrence x detection

c)

measurement x occurencex part process

d)

measurement x warrant x detection

35.

A particular product has been given the following rankings for calculating RPN while preparing FMEA chart, S=10, O=2, D=2. What is the value of RPN?

a)

40

b)

20

c)

30

d)

10

36.

if the severity score is 6, the occurrence score is 4, and detection is 4, then the RPN would be -------------

a)

96

b)

64

c)

64

d)

82

37.

When performing a Process or Design FMEA, the ---------------is a calculation to sort the risks from highest to lowest.

a)

RPN

b)

RPN

c)

PNP

d)

SCN

38.

A statistical measure of the inherent process variability of a given characteristic is known as ___________