Font size
WorksheetsUnit 9 Christmas Quiz
Total questions: 16
Worksheet time: 10mins
Architects draw pictures?
True
False
Construction site managers need a degree to manage a site?
True
False
Health and Safety is who's responsibility?
Your own
The health and safety officer
The site manager
Your colleagues
The HSE
What does the HSE stand for?
Health & Safety Executives
Health and Safety Executive
Highly Stimulating Education
Health Safety Executive
For the M2 assignment criteria how many techniques do you need to have discussed?
Four
Two of each
Three
Five
For the P2 criteria you need to: Explain the techniques applied by a [Blank] to manage the project.
(a)
An Estimator was part of the P1 criteria?
True
False
You can use a mobile phone while driving on site plant?
If its for communication
In an emergency
When the vehicle is parked
Yes
When the vehicle is parked and the engine is off
BIM stands for..?
Building Information Management
Building Information Modeling
Building Innovation Management
Building Initiation Management
The bottom of Maslow's Hierarchy Of Needs is..?
Self-actualization needs
Social and belonging needs
Physiological needs
Esteem needs
Safety needs
What are the elements that make up the Project Management Triangle.
Materials, People and Plant
Money, Time and People
Material, Time and Money
Quality, Cost & Speed
Quality, Cost and Time
What does JIT stand for?
Just In Time Delivery
Just In Transit
Just Interim Triangles
Just In Time
Tust Din Time Jelivery
The Zombie apocalypse risk management plan was CON PLAN [BLANK]
(a)
In PESTLE analysis the T stands for?
Technology
Time Bound
Technological
Time
Techniques
SWOT analysis stands for..?
(a)
What is the name of my Dog?
(a)
