WorksheetsEngosoft Training & Consulting Quiz
Total questions: 14
Worksheet time: 5mins
What is the primary role of the Owner in a project?
To supervise the construction
To fund the project
To provide materials
To design the project
What does the Consultant do during the pre-design phase?
Implement the project
Conduct site supervision
Create the initial layout
Review the budget
Which of the following is a task of the Contractor?
Review the project specifications
Prepare the initial layout
Design the project
Execute the project on-site
What is included in the coordination between different specialties?
Only structural engineering
Architecture, Interior Design, Structure, Electromechanical
Only electromechanical systems
Only architecture
Which software is mentioned for drawing sketches?
Photoshop
SketchUp
AutoCAD
Revit
What does the acronym BOQ stand for?
Bill of Quantities
Budget of Quality
Basis of Quotations
Balance of Quantities
What is the role of the Facility Manager?
To design the project
To manage the construction site
To oversee facility operations
To provide financial support
Which task is performed after the tender is issued?
Initial layout creation
Approved shop drawing
Design specifications
Site supervision
What does the term 'As-built' refer to?
Material specifications
Budget estimates
Initial design plans
Final construction documentation
Which command is used to create a circle in AutoCAD?
MI
D
L
C
What is the main responsibility of the Consultant after the project is tendered?
To execute the project
To approve shop drawings
To manage subcontractors
To create the initial layout
Which of the following is NOT a task of the Contractor?
Implementing the project
Designing the project
Conducting routine tests
Preparing shop drawings
What does the term 'Submittals' refer to?
Budget reports
Initial project designs
Documents submitted for approval
Final construction plans
Which command is used to save a drawing in AutoCAD?
Del
CTRL+S
CTRL+Z
MI