NEW
Font size
WorksheetsA2: SAR-21
Total questions: 18
Worksheet time: 9mins
“STSO” means
Singapore Telecommunication Service order
Singapore Technical Standard Order
Singapore Transport Service Organization
A SAR-21 organisation that releases certain parts need the following information
Name & location of manufacturer, STSO if applicable, serial & batch number
Name & location of manufacturer, STSO if applicable, CAAS reference approval number, serial & batch number
Name of manufacturer, STSO if applicable, serial & batch number
SAR-21 organisation will issue a ___________ for component/equipment released to service
CAAS(AW)95
CAAS(AW)96
CAAS(AW)22
A holder of a Design Organisation Approval(DOA) may
develop design data
issue statements of compliance to airworthiness design standards
Both (A) and (B) as well as approve minor design changes
In SAR-21, “STC” stands for
Singapore Training Centre
Supplemental Type Certificate
Special Travel Concession
A holder of Singapore Technical Standard Order (STSO) Certificate of Approval may approve _________.
major design changes
minor design changes
both major and minor design changes
Compliance with _____ is required for organization engaged in activities involving design and production of aircraft components.
SAR-21
SAR-145
SAR-147
What information can be found in the SAR-21 Company Exposition Document?
detailed operating procedures of activities of the company
document developed by customer to control activities in company
description of how activities of the company is conducted including detailed procedures.
Exposition Document is used to _________.
state detailed description of work to be carried out
organize and describe the details of how the organization actually functions
describe all design approvals
The certificate used for import/export purposes, domestic purposes and serves as an official certificate for items from the manufacturer/maintenance organisation to user is the ________.
CAAS(AW)68
CAAS(AW)95
CAAS(AW)96
Parts coming from a manufacturer will have an _________.
authorised released certificate
approval document
approval certificate
Modification or repair outside the scope of manufacturer’s publication shall be approved by a representation of _________.
CEO or by an appropriately approved design organization signatory
CEO or Chief Inspector of approved organization
the manufacturer in consultation with the CEO
Which of the following statements is FALSE?
The Authority does not grant Type Certificate.
The Authority grants Type Certificate under certain conditions.
The Authority grants a letter of acceptance of Type Certificate.
In SAR-21, “Article” means _________.
material, process, part or appliance
aircraft, engine or propeller
instrument, mechanism, equipment, apparatus or accessory used in operating an aircraft.
Minor changes made after the grant of the STSO Certificate of Approval should be notified to the Authority within _________ of making the minor change and preferably before shipment of the articles.
1 month
3 months
6 months
Minor changes made after the grant of the supplemental type certificate (STC) should be notified to the Authority within ________ of making the minor change by the STC holder.
1 month
3 months
6 months
Which of the following certificate holders cannot apply for the equivalent FAA approval through Bilateral Aviation Safety Agreement (BASA) with the Authority of USA?
A Supplemental Type Certificate holder
A holder of Singapore Technical Standard Order Certificate of approval for an article
A holder of Design Organisation Approval
For production of articles without a Production Organisation Approval (POA), the applicant may apply for a letter of agreement for limited production. The limit is for producing less than _______ units of the article.
2
3
5
