wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Construction and Project Management Quiz

Total questions: 20

Worksheet time: 10mins

Name
Class
Date
1.

Which type of project would a private domestic client commission?

a)

Office block.

b)

House extension.

c)

Shopping mall.

d)

Leisure centre.

2.

Which factor would a commercial client consider before choosing a contractor for a project?

a)

Construction company has a modern image.

b)

The managers and supervisors are well paid.

c)

All skilled workers have brand new equipment.

d)

A reputation for successful contract completion.

3.

What is the purpose of Approved Document ‘A’ in the Building Regulations?

a)

To ensure the appearance of the building is acceptable.

b)

To confirm the structural integrity and safety of buildings.

c)

To safeguard efficient broadband installation.

d)

To guarantee the client brief is fully satisfied.

4.

Which project description applies when a factory unit is constructed?

a)

Recreational.

b)

Residential.

c)

Industrial.

d)

Leisure.

5.

What type of community development project can be described as infrastructure?

a)

Social housing.

b)

Local transport.

c)

Healthcare provision.

d)

Educational establishments.

6.

The term ‘utilities’ applies to which part of the built environment?

a)

Retail park.

b)

Sports stadium.

c)

Gas service distribution.

d)

Online shopping warehouse.

7.

What is another term for the modular construction method?

a)

Volumetric.

b)

Immersive.

c)

Panelised.

d)

Mechanical.

8.

Why would a construction company use market intelligence?

a)

Checking the value of their stocks and shares.

b)

Confirming a building meets Building Regulations.

c)

Making an accurate valuation of stored materials.

d)

Forecasting future skilled labour availability.

9.

What does the term ‘integration’ mean when applied to a supply chain?

a)

Partners in the supply chain closely collaborate when planning a project.

b)

Partners in the supply chain use their equipment resources separately.

c)

Partners in the supply chain make sure they maximise individual profit.

d)

Partners in the supply chain monitor each other to maintain skill levels.

10.

Which term describes how ordering, storing, and using materials on site is controlled?

a)

Organisational structure.

b)

Integrated systems.

c)

Inventory management.

d)

Change management.

11.

For which type of procurement route is a specific company team provided to develop the project concept?

a)

Fast track.

b)

Contractor led.

c)

Lump sum price.

d)

Two-stage tender.

12.

Which construction professional would plan and oversee the building of a bridge and its connected roadways?

a)

Contracts manager.

b)

Structural engineer.

c)

Civil engineer.

d)

Facilities manager.

13.

What are the roles and responsibilities of a building services engineer?

a)

Designs and installs electrical, heating and ventilation systems.

b)

Creates the concept and design of the project to match the client brief.

c)

Sustains safety and efficiency within the built environment.

d)

Manages the contracts made as part of the delivery of a project.

14.

What do the letters CPD stand for in relation to construction professions?

a)

Continuing Personal Development.

b)

Constant Personal Development.

c)

Continuing Professional Development.

d)

Constant Professional Development.

15.

Who would deliver a toolbox talk about company rules of behaviour on site?

a)

Architectural technician.

b)

Training officer.

c)

Client representative.

d)

Careers adviser.

16.

Which BIM term refers to the central source of digital information used throughout the lifecycle of a building?

a)

Employer information requirements.

b)

Asset information model.

c)

Document management system.

d)

Common data environment.

17.

In a BIM system, what specific purpose is the Digital Plan of Work used for?

a)

Standardising methods for creating, naming, and communicating information.

b)

Providing information about what is required, when it is required and who provides it.

c)

Setting out information required by the employer during the construction phase.

d)

Providing role descriptions for those responsible for managing information.

18.

In the acronym PESTLE, what does the letter ‘T’ stand for?

a)

Technical.

b)

Technographic.

c)

Technological.

d)

Technophobic.

19.

What does the term ‘currency’ mean when used in relation to construction skills?

a)

Keeping up to date.

b)

Maintaining a good wage.

c)

Understanding electricity.

d)

Working as well as a colleague.

20.

Which term is used in the tendering process?

a)

Metadata.

b)

Curtailment.

c)

Client need.

d)

Prime cost.