WorksheetsSurvey Stakes and Property Lines
Total questions: 5
Worksheet time: 3mins
Name
Class
Date
1.
What is shown in Figure 3 of the document?
a)
A weather map
b)
A property and building lines diagram
c)
A list of construction materials
d)
A blueprint of a building.
2.
Witness stakes are used in conjunction with which other type of stake?
a)
Corner stakes
b)
Offset stakes
c)
Boundary stakes
d)
Survey stakes
3.
What is the primary purpose of constructing and placing batter boards in building layouts?
a)
To support the roof
b)
To hold the building's position
c)
To decorate the site
d)
To provide lighting.
4.
The _______ is a horizontal piece that connects the stakes in a batter board.
a)
Diagonal brace
b)
Cross arm
c)
Stake
d)
String
5.
In the process of positioning dry lines, what is typically used to hold the lines in place?
a)
Nails
b)
Stakes
c)
Batter boards
d)
Concrete blocks
100 %
