wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

TLevel U1 Working in Engineering

Total questions: 20

Worksheet time: 10mins

Name
Class
Date
1.

In engineering, the design process begins when ...

a)

Information about an existing product is gathered by an engineer

b)

An engineering design team comes up with ideas for a new product

c)

A design engineer recognises the need for a solution to a problem

d)

Engineering software is used to create a problem not a solution

2.

Quality control is principally concerned with ensuring:

a)

Process quality

b)

Staff quality

c)

Product quality

d)

Cost control

3.

If an engineering design process is iterative, it allows engineers to ...

a)

Become proficient at different engineering software applications

b)

Find the most optimal solution to a design problem

c)

Incorporate both maths and science concepts into a design problem

d)

Take the long way round to finding a solution

4.

What is meant by a pattern in a manufacturing process?

a)

A replica device used to create a mould

b)

A type of mould made out of resin

c)

A design to be cut out of sheet metal

d)

A type of engineering drawing

5.

___________ ensure their machines are working at full capacity, are stocked with the necessary materials and are well maintained.

a)

Maintenance managers

b)

Machine operators

c)

Robots

d)

Operations managers

6.

What is the process in which molten material is poured into a mould that takes the form of the finished part?

a)

Forming

b)

Shaping

c)

Casting

d)

Moulding

7.

What is the process by which an item is given an improved appearance, wear-resistance, hardness, friction control or tarnish resistance?

a)

Surface friction control

b)

Polishing

c)

Finishing

d)

Forming

8.

The process by which copper is pulled to make wire is:

a)

Finishing

b)

Casting

c)

Forming

d)

Shaping

9.

Universal design, which ensures products and places are usable by everyone, regardless of age, ability and circumstance is also known as:

a)

Exclusive design

b)

Iterative design

c)

Inclusive design

d)

Linear design

10.

_________maintenance is documented and scheduled.

a)

Routine

b)

Planned

c)

Corrective

d)

Operation

11.

Electricians should use what type of tools to protect against electrocution?

a)

Insured tools

b)

Hand tools

c)

Insulated tools

d)

Power tools

12.

Condition monitoring is the basis for _________maintenance?

a)

Preventive

b)

Shutdown

c)

Breakdown

d)

Predictive

13.

Equipment downtime is decreased and the number of major repairs are reduced due to __________ maintenance?

a)

Value driven

b)

Predictive

c)

Preventive

d)

Reliability

14.

Why is maintenance of a machine necessary?

a)

Doing so reduces the production rate

b)

Doing so increases the servicing costs

c)

Doing so increases efficiency and service life

d)

Doing so helps in replacement of the machine

15.

_________ maintenance addresses problems as they arise.

a)

Reactive

b)

Total productive

c)

Predictive

d)

Breakdown

16.

With an increase in the cost of preventive maintenance, the breakdown maintenance cost will_________?

a)

Decrease

b)

Increase at a faster rate

c)

Not change

d)

Increase

17.

The measurement of human physical properties is called what?

a)

Anthropology

b)

Anthropometry

c)

Depth perception

d)

Anthrology

18.

Band saws and belt sanders are types of:

a)

Hand tool

b)

Power tool

c)

Electrical tool

d)

Measuring gauge

19.

_______ production produces standardised goods in large quantities.

a)

One-off

b)

Batch

c)

Linear

d)

Mass

20.

What is meant by the term continuous production?

a)

A strategy that involves the ongoing processing of high demand materials

b)

A method where identical goods go through production stages together

c)

A process which involves making a single unique customised product

d)

A flow production method used to manufacture materials without interruption