1.

What is a prototype in software development?

a)

A testing phase for software

b)

A detailed project plan

c)

A mock-up of a software solution in a primitive form

d)

A final product ready for delivery

2.

Which type of prototyping involves an iterative approach?

a)

Evolutionary prototyping

b)

Throwaway prototyping

c)

Rapid application development

d)

Waterfall method

3.

What is the main focus of evolutionary prototyping?

a)

User interface design

b)

Data structures

c)

Documentation

d)

Final product delivery

4.

What happens to the prototype in throwaway prototyping?

a)

It is discarded after use

b)

It becomes part of the final product

c)

It is refined into the final product

d)

It is used for long-term development

5.

What does RAD stand for in software development?

a)

Rapid Application Development

b)

Regular Application Design

c)

Rapid Analysis Development

d)

Revised Application Development

6.

What is a key characteristic of the Waterfall Method?

a)

Focus on rapid prototyping

b)

Gathering all requirements at the beginning

c)

User involvement in every stage

d)

Iterative feedback loops

7.

Which method emphasizes user involvement during development?

a)

Rapid Application Development

b)

Throwaway Prototyping

c)

Waterfall Method

d)

Evolutionary Prototyping

8.

What is a benefit of using CAD/CAM applications?

a)

Longer production times

b)

Increased manual labor

c)

Design and manufacturing integration

d)

Higher costs of production

9.

Which of the following is NOT a type of prototyping mentioned?

a)

Incremental Prototyping

b)

Throwaway Prototyping

c)

Evolutionary Prototyping

d)

Rapid Prototyping

10.

What is the primary goal of rapid prototyping?

a)

To create a final product quickly

b)

To gather user feedback as soon as possible

c)

To develop complex data structures

d)

To eliminate the need for user involvement

11.

What is a drawback of the Waterfall Method?

a)

High flexibility in requirements

b)

Too much user involvement

c)

Lack of user feedback

d)

Rapid development cycles

12.

Which of the following is a method used in RAD?

a)

Prototyping Analysis

b)

Incremental Design

c)

Waterfall Analysis

d)

Joint Application Development

13.

What is the first step in the Waterfall Method?

a)

Maintenance

b)

Requirements gathering

c)

Implementation

d)

Design

14.

What is a common application of CAD/CAM?

a)

Software development

b)

Web development

c)

Database management

d)

Physical product design and manufacturing

15.

What is the main focus of the RAD approach?

a)

User feedback and rapid development

b)

Detailed documentation

c)

Long-term project management

d)

Extensive planning

16.

Which prototyping method is discarded after use?

a)

Incremental Prototyping

b)

Evolutionary Prototyping

c)

Waterfall Prototyping

d)

Throwaway Prototyping

17.

What is a key feature of evolutionary prototyping?

a)

Focus on data structures

b)

Initial prototype is improved based on feedback

c)

Final product is delivered immediately

d)

No user involvement

18.

What is the purpose of client feedback in rapid prototyping?

a)

To finalize the product

b)

To eliminate the need for further development

c)

To specify final requirements

d)

To gather initial requirements

19.

Which of the following is a disadvantage of the Waterfall Method?

a)

Rapid development

b)

Flexibility in requirements

c)

High user involvement

d)

Difficulty in accommodating changes

20.

What is the main advantage of using CAD/CAM?

a)

Higher production costs

b)

Longer design times

c)

Integration of design and manufacturing

d)

Increased manual labor