1.

What is the primary function of a Risk Management Plan?

a)

To identify, assess, and manage project risks

b)

To eliminate all project risks

c)

To track contractor work progress

d)

To monitor financial transactions

2.

What is a key disadvantage of relying solely on Quality Control (QC) in construction?

a)

It prevents all defects from occurring

b)

It eliminates the need for inspections

c)

It focuses on detecting and fixing defects rather than preventing them

d)

It makes Quality Assurance (QA) unnecessary

3.

The safety and health plan is a document that includes information to allow for the safe planning and execution of the construction phase. Over how many stages is the plan developed?

a)

1

b)

2

c)

3

4.

Quality Assurance is

a)

an approach to managing poor workplace attitudes

b)

a project management strategy to assure project success

c)

implementing processes to prevent defects occurring

5.

What is the primary purpose of a Safety File in construction projects?

a)

To document financial transactions related to safety investments

b)

To record all accidents and incidents that occurred on site

c)

To provide a step-by-step guide for securing a construction permit

d)

To record health and safety information for the future operation, maintenance, and demolition of a structure

6.

RAMS stands for Risk Assessment and

a)

Regulatory and Management Standards

b)

Roadwork and Material Safety

c)

Resource Allocation and Maintenance Strategy

d)

Risk Assessment and Method Statement

7.

In a Traditional procurement mechanism, the Contractor has ownership over the design process

a)

True

b)

False

8.

Select all "true" statements as they relate to D&B style contract compared to a Traditional Contract

a)

Improved Collaboration between designers and contractors

b)

Single -point of contact for all the works and a single contract with the Client on a D&B

c)

Contractors prefer Traditional Contracts over D&Bs

d)

The Contractor can use their expertise to contribute to design decisions and improve health and safety / cost

e)

The Client holds more Design Risk in a D&B than a Traditional contract