wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Hot Water - PPT 8 - Install hot water systems and components

Total questions: 34

Worksheet time: 17mins

Name
Class
Date
1.

Which British Standard covers the installation of hot water pipework?

a)

BS EN 1057

b)

British Standard 8558

c)

BS EN 1234

d)

British Standard 9001

2.

Which British Standard covers plumbing materials, like copper tubes and plastic pipework?

a)

BS EN 1057

b)

British Standard 8558

c)

BS EN 1234

d)

British Standard 9001

3.

What materials are usually used for hot water systems to prevent contamination?

a)

PVC pipes

b)

Copper tubes and polybutylene pipes

c)

Steel pipes

d)

Aluminum tubes

4.

What is the maximum temperature hot water should reach in these systems?

a)

100°C

b)

95°C

c)

90°C

d)

85°C

5.

The pipework should withstand how many times the normal operating pressure?

a)

One time

b)

One and a half times

c)

Two times

d)

Three times

6.

What is a key consideration when installing hot and cold water pipework side by side?

a)

Ensuring the hot water pipework is above the cold water pipework

b)

Ensuring the cold water installation is not adversely affected by the hot water pipework

c)

Ensuring both pipeworks are of the same material

d)

Ensuring the hot water pipework is insulated

7.

What should be done before pressure testing open-vented cylinders?

a)

Increase the pressure gradually

b)

Ensure the cylinder is full of water

c)

Ensure the maximum pressure the cylinder can withstand is not exceeded

d)

Ensure the cylinder is empty

8.

What action should be taken if necessary before testing commences?

a)

Increase the water temperature

b)

Disconnect the cylinder and cap the pipework

c)

Fill the cylinder with water

d)

Insulate the pipework

9.

What should you visually check for before conducting soundness testing in plumbing?

a)

The color of the pipes

b)

The temperature of the water

c)

For open ends, soldered joints, tight compression joints, and clips in place

d)

The length of the pipes

10.

What types of pipes require different soundness tests according to the document?

a)

Metal and glass pipes

b)

Rigid pipe (copper) and plastic pipe

c)

Flexible and rigid pipes

d)

Steel and aluminum pipes

11.

What is the first step in the testing and decommissioning process?

a)

Set up equipment

b)

Test period

c)

Visual inspection

d)

Final check

12.

What is the first step in the hydrostatic pressure testing of metal piping systems?

a)

Apply the test pressure

b)

Slowly fill the system with water

c)

Arrange for the system to be vented

d)

Check for leaks

13.

How long should the test pressure be applied using a hydraulic test bucket? [Metal Pipework]

a)

5 minutes

b)

10 minutes

c)

15 minutes

d)

20 minutes

14.

What should be done if there is a pressure loss during the test?

a)

Stop the test immediately

b)

Increase the pressure

c)

Maintain the system at the test pressure until leaks are identified

d)

Decrease the pressure

15.

What should be done after filling the system with water during the hydrostatic pressure test?

a)

Apply the selected test pressure.

b)

Check visually for leaks.

c)

Reduce the pressure by bleeding water.

d)

Seal all air vents and outlet valves.

16.

How long should the test pressure be applied using the hydraulic test bucket? [Plastic pipework]

a)

15 minutes

b)

45 minutes

c)

30 minutes

d)

60 minutes

17.

What indicates a leak in the system during the visual check?

a)

Increase in pressure

b)

Pressure drop

c)

Constant pressure

d)

Temperature rise

18.

Why should hot water systems be flushed as soon as possible after installation?

a)

To increase water pressure

b)

To remove potential contaminants

c)

To improve water taste

d)

To reduce water temperature

19.

What should be done to ensure the water runs completely clear and free of discoloration?

a)

Use a water filter

b)

Fill the system and run water at every outlet

c)

Add cleaning chemicals

d)

Increase water temperature

20.

How long should disinfectant be added to the system during the flushing and disinfecting process?

a)

30 minutes

b)

2 hours

c)

1 hour

d)

15 minutes

21.

Which disinfectant is used to flush the system?

a)

Sodium chloride

b)

Sodium hypochlorite solution or Chlorine

c)

Hydrogen peroxide

d)

Ammonia

22.

Why should thermostats and high-limit thermostats be checked?

a)

To ensure they are not damaged.

b)

To ensure they are operating correctly.

c)

To ensure they are turned off.

d)

To ensure they are replaced regularly.

23.

What should be checked against the specification and manufacturer’s instructions?

a)

The color of the water.

b)

The flow rates, pressures, and water temperatures.

c)

The size of the pipes.

d)

The type of heat source.

24.

What tool is used to measure flow rate?

a)

Pressure gauge

b)

Weir cup

c)

Thermometer

d)

Hydrometer

25.

How should pressure be checked ?

a)

Using a thermometer

b)

Using a pressure gauge

c)

By visual inspection

d)

By listening for sounds

26.

What should be handed over to the customer once the plumbing system has been proved?

a)

User manual, installation guide, and warranty

b)

Manufacturer’s instructions, benchmark certificate, and warranty

c)

Installation guide, benchmark certificate, and user manual

d)

Warranty, user manual, and installation guide

27.

What is the first step in decommissioning a hot water system?

a)

Heat source safely isolated

b)

Customer informed

c)

Fuses removed

d)

System drained to safe location

28.

Which of the following actions ensures safety during the decommissioning of a hot water system?

a)

Leaving open ends uncapped

b)

Placing a warning notice on the heat source

c)

Keeping fuses intact

d)

Leaving dead legs

29.

If the float operated valve is stuck in the off position, what is the recommended solution?

a)

Check and replace immersion heater

b)

Check the boiler for correct operation

c)

Check and clean or replace the float operated valve as necessary

d)

Increase the temperature setting to 60°C

30.

What should be done if the water is flowing cold due to immersion heater failure?

a)

Drain down the cylinder and refill the system

b)

Check and replace immersion heater

c)

Check and open isolation valve/stop valve

d)

Increase the temperature setting to 60°C

31.

What is a recommended solution if the water is only lukewarm due to a thermostat issue?

a)

Check and open isolation valve/stop valve

b)

Drain down the cylinder and refill the system

c)

Increase the temperature setting to 60°C and check the correct operation

d)

Check and replace immersion heater

32.

What is a probable cause of poor flow rate in plumbing systems?

a)

Cold water feed/storage cistern too low

b)

Cold feed pipe and/or hot water draw-off blocked with scale

c)

Failure of the immersion heater thermostat

d)

Incorrect pipe installation

33.

What is the recommended solution for poor pressure due to a low cold water feed/storage cistern?

a)

Descale the hot water draw-off

b)

Raise the cistern to increase the distance to hot water outlets

c)

Replace the immersion heater

d)

Install a new thermostat

34.

What should be checked and tested if very hot water is discharging into the cold water feed/storage cistern from the open vent?

a)

Cold feed connection

b)

Hot water draw-off

c)

Thermostat and energy cut-out

d)

Water pressure