wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Troubleshooting and Maintenance

Total questions: 10

Worksheet time: 5mins

Name
Class
Date
1.

What should be the first step in troubleshooting an automated system that has stopped working?

a)

Replace all components

b)

Gather information about the problem

c)

Reset the system

d)

Check the power supply

2.

What type of maintenance is performed at scheduled intervals regardless of equipment condition?

a)

Predictive maintenance

b)

Preventive maintenance

c)

Corrective maintenance

d)

Reactive maintenance

3.

Which of the following is a good practice when documenting maintenance activities?

a)

Include only successful repairs

b)

Document only major repairs

c)

Include date, problem description, and resolution

d)

Keep documentation confidential from operators

4.

What tool would be most useful for measuring insulation resistance in electrical systems?

a)

Multimeter

b)

Oscilloscope

c)

Megohmmeter

d)

Clamp meter

5.

What does MTBF stand for in maintenance terminology?

a)

Maximum Time Between Failures

b)

Mean Time Before Failure

c)

Minimum Time Between Fixes

d)

Maintenance Time Before Failure

6.

Which method helps identify potential equipment failures by monitoring changes in equipment condition?

a)

Corrective maintenance

b)

Predictive maintenance

c)

Reactive maintenance

d)

Scheduled maintenance

7.

What is the proper sequence for safely working on electrical equipment?

a)

Test, Lock, Tag, Try

b)

Lock, Tag, Try, Test

c)

Tag, Lock, Test, Try

d)

Try, Test, Lock, Tag

8.

When troubleshooting a pneumatic system with inadequate pressure, which component should you check first?

a)

A) Actuators

b)

B) Valves

c)

C) Compressors

d)

D) Filters

9.

What issue is indicated when a motor draws excessive current and runs hot?

a)

Under-voltage

b)

Mechanical overload

c)

Insufficient lubrication

d)

All of the above

10.

What is the purpose of a "fishbone diagram" in troubleshooting?

a)

To diagram electrical connections

b)

To identify the root cause of a problem

c)

To schedule maintenance activities

d)

To allocate resources