Project scheduling, Feasibility Scope, Software Metrics

Total questions: 30

Worksheet time: 15mins

Name
Class
Date
1.

1. Which of the following is not a factor useful in decision making process

a)

a) Non availability of ready-made solutions

b)

b) Cost of ready-made solutions

c)

c) Past success or failure in software acquisition

d)

d) Perceived risk

2.

2. Scheduling in project management includes listing of-

a)

a) activities

b)

b) deliverables

c)

c) milestones within a project

d)

d) all of mentioned

3.

3. Which of the following is not a Type of schedules in project management-

a)

a) Master project schedule

b)

b) Milestone schedule

c)

c) complete project schedule

d)

d) A detailed project schedule

4.

4. Milestone schedule is also called as-

a)

a) summary schedule

b)

b) A detailed project schedule

c)

c) complete project schedule

d)

d) Master project schedule

5.

5. The most common form of project schedule is a

a)

a) Pie chart

b)

b) Gantt chart.

c)

c) bar chart

d)

d) none

6.

6. Task Set for Project Planning includes following-

a)

a) Establish project scope

b)

b) Determine feasibility

c)

c) Define required resources

d)

d) all of mentioned

7.

7. Which of the following is not describe by Software scope–

a)

a) functions and features

b)

b) maintainability and adaptability

c)

c) Contents

d)

d) data

8.

8. Techniques used to define scope are-

a)

a) narrative description of software scope

b)

b) set of use cases

c)

c) Both a & b

d)

d) none of mentioned

9.

9. Dimensions of Software feasibility are

a)

a) Technology

b)

b) Finance

c)

d) Time

d)

d) all of mentioned

10.

10. Major categories of software engineering resources includes

a)

a) People

b)

b) Development environment

c)

c) Reusable software components

d)

d) all of mentioned

11.

11. In software development resources, Planners must identify which of the following parameters for hardware and software and verify that these resources will be available

a)

a) the time window required

b)

b) the space window required

c)

c) both a & b

d)

d) none of above

12.

12. Approaches used to Generate an estimate of the software’s size are

a)

a) Problem-based estimation

b)

b) Process-based estimation

c)

c) Project-based estimation

d)

d) both a & b

13.

13. Which one is not a category of software metrics ?

a)

a) Product metrics

b)

b) Process metrics

c)

c) Project metrics

d)

d) People metrics

14.

14. LOC is a

a)

a) metric

b)

b) code

c)

c) Line Of Code

d)

d) both (a) & (c)

15.

15. Which of the following is not a direct measure of SE process?

a)

a) Efficiency

b)

b) Cost

c)

c) Effort Applied

d)

d) All of the mentioned

16.

16. Which of the following is an indirect measure of product?

a)

a) Quality

b)

b) Complexity

c)

c) Reliability

d)

d) All of the Mentioned

17.

17. In size oriented metrics, metrics are developed based on the

a)

a) number of Functions

b)

b) number of user inputs

c)

c) number of lines of code

d)

d) amount of memory usage

18.

18. In Halstead theory, effort is measured in

a)

a) Person-months

b)

b) Hours

c)

c) Elementary mental discriminations

d)

d) None of the above

19.

19. Which is not a size metric?

a)

a) LOC

b)

b) Function count

c)

c) Program length

d)

d) Cyclomatic complexity

20.

20. Which one is not a measure of software science theory?

a)

a) Vocabulary

b)

b) Volume

c)

c) Logic

d)

d) Level

21.

21. Defects removal efficiency (DRE)depends on:

a)

a) E – errors found before software delivery

b)

b) D – defects found after delivery to user

c)

c) Both E and D

d)

d) Varies with project

22.

22. According to the COCOMO model, a project can be categorized into

a)

a) 3 types

b)

b) 5 types

c)

c) 6 types

d)

d) No such categorization

23.

23. In Intermediate COCOMO model, Effort Adjustment Factor (EAF) is derived from the effort multipliers by

a)

a) Adding them

b)

b)Multiplying them

c)

c) Taking their weighted average

d)

d) Considering their maximum

24.

24. Project metrics are estimated during which phase?

a)

a)Feasibility study

b)

b) Planning

c)

c) Design

d)

d) Development

25.

25. According to Halsetad's metrics, program length is given by the

a)

a) Sum of total number of operators and operands

b)

b) Sum of number of unique operators and operands

c)

c) Total number of operators

d)

d. Total number of operands

26.

26. Complete COCOMO considers a software as a

a)

a) Homogeneous system

b)

b)Heterogeneous system

c)

c)can not say

d)

d)None

27.

27. Consider you are developing a web application, which would make use of a lot of web services provided by Facebook, Google, Flickr. Would it be wise to make estimates for this project using COCOMO?

a)

a) Yes, of course

b)

b) Not at all

c)

c) Not sure

d)

d)none

28.

28. Main types of schedules used in project management are-

a)

a) Master project schedule

b)

b) Milestone schedule

c)

c) A detailed project schedule

d)

d) All of mentioned

29.

29. Which schedule tracks major milestones and key deliverables, but not every task required to complete the project.

a)

a) Master project schedule

b)

b) Summary schedule

c)

c) A detailed project schedule

d)

d) All of mentioned

30.

30. Milestone schedule is also called as –

a)

a) Summary schedule

b)

b) A detailed project schedule

c)

c) Main project schedule

d)

d) None of mentioned