CC105 - Quiz No. 4

Total questions: 30

Worksheet time: 15mins

Name
Class
Date
1.

Which one of the following models is not suitable for accommodating any change?

a)

Waterfall

b)

Spiral

2.

SDLC stands for

a)

Software Development Life Cycle

b)

System Delivery Life cycle

c)

Software Design Life Cycle

d)

System Design Life Cycle

3.

Selection of a model is based on

a)

Requirements

b)

Development team & users

c)

Project type and associated risk

d)

All of the mentioned

4.

A model that is the demo implementation of the system

a)

prototype

b)

waterfall

c)

incremental

d)

agile

5.
Implementing the solution is the stage where:
a)
coding in a programming language takes place.
b)
testing of the solution takes place.
c)
determining the requirements takes place.
d)
modification of the solution takes place.
6.
What happens in the design phase?
a)
The code is produced
b)
Making changes when the sotware has been created
c)
Planning the solution, look and feel of the software interface
d)
Ensuring the requirements are understood
7.

Which SDM is this?

a)

Spiral

b)

Waterfall

c)

Incremental

d)

V-shaped

8.

Which SDM is this?

a)

Spiral

b)

Waterfall

c)

Incremental

d)

V-shaped

9.
Which of these is not a similarity between the v-shaped model and the waterfall model?
a)
It is easy to understand
b)
Have requirements
c)
Little flexibility
d)
Testing is applied throughout
10.

What is a sprint?

a)

A working model of software with some limited functionality.

b)

This person is the tester of the product

c)

Similiair to the product owner

d)

Fixed length (in time) iterations

11.

The software development approach that is characterised by distinct stages is the:

a)

waterfall approach.

b)

rapid application development approach.

c)

prototyping approach.

d)

end user approach.

12.

In spiral model, a software is produced early in the software life cycle.

a)

TRUE

b)

FALSE

13.

In spiral model, a software is produced early in the software life cycle.

a)

TRUE

b)

FALSE

14.

In iterative model, costly system architecture or design issues may arise because not all requirements are gathered up front for the entire lifecycle

a)

TRUE

b)

FALSE

15.

Identify the following model.

a)

V-Model

b)

Waterfall

c)

Iterative

d)

Incremental

16.

What is at the heart of scrum?

a)

Testing

b)

Planning

c)

Daily Scrum

d)

Sprint

17.

Which one is NOT a phase of the systems development life cycle?

a)

System Design

b)

Analysis

c)

Decision Analysis

d)

Testing

18.

The work associated with software engineering can be categorized into three generic phases,regardless of application area, project size, or complexity namely the__________ phase which focuses on what, the_________ phase which focuses on how and the_________ phase which focuses on change.

i. support

ii. development

iii. definition

a)

1, 2, 3

b)

2, 1, 3

c)

3, 2, 1

d)

3, 1, 2

19.

First step in SDLC is

a)

Analysis

b)

Design

c)

Testing

d)

Maintenance

20.

Prototyping aims at

a)

End User understanding and approval

b)

Program Logic

c)

Planning

d)

None of these

21.

Spiral model development

a)

Ends with software delivery

b)

Includes risk evaluation during each iteration

c)

Is more chaotic than incremental model

d)

None of these

22.

What model enables the team to spot flaws in the project's requirement specs, code, and architecture early on?

a)

Waterfall

b)

V-model

c)

Prototyping

d)

Spiral

23.

What approach focuses on prototyping to improve the development team's grasp of the customer's wants/needs?

a)

Waterfall

b)

V-model

c)

Prototyping

d)

Spiral

24.

What model is being created to overcome the waterfall model's flaws? It begins with planning and concludes with deployment, with cyclic interactions in between?

a)

Iterative and Incremental Model

b)

V-model

c)

Prototyping

d)

Spiral

25.

What model is most concerned with risk assessment? As a result, any team that wants to employ this model needs to have people who are knowledgeable and skilled in this field?

a)

Waterfall

b)

V-model

c)

Prototyping

d)

Spiral

26.

What model is built on iterative and incremental development, where requirements and solutions emerge from cross-functional collaboration?

a)

Waterfall

b)

V-model

c)

Prototyping

d)

Agile Model

27.

True or false: One of the Advantages of waterfall model is it is easy to explain to the user.

a)

true

b)

false

28.

True or false: One of the advantages of V-Shaped model is it is each phase has a specific deliverable.

a)

true

b)

false

29.

True or false: The Agile model can be use to any type of project even with a little communication and coordination with the customer.

a)

true

b)

false

30.

True or false: The prototyping model works well for where the requirements are easily understood.

a)

true

b)

false