wayground logo

Free Printable Worksheets

NEW

Font size

S
M
L
XL
Worksheets

CE 40 (RA 544 and RA 9184)

Total questions: 40

Worksheet time: 20mins

Name
Class
Date
1.

What is the official title of Republic Act No. 544?

a)

Engineering Code

b)

Civil Engineering Law

c)

Infrastructure Law

d)

Professional Practice Act

2.

Who appoints the members of the Board of Civil Engineering?

a)

The PRC Chairperson

b)

The Chief Justice

c)

The Senate

d)

The President of the Philippines

3.

How many members compose the Board of Civil Engineering?

a)

Two

b)

Three

c)

Four

d)

Five

4.

What qualification is required to be a member of the Board of Civil Engineering?

a)

At least 10 years of teaching experience

b)

A registered civil engineer with 10 years of practice

c)

Government-employed engineer

d)

Licensed architect with engineering background

5.

What is the examination fee required under RA 544?

a)

₱50

b)

₱75

c)

₱100

d)

₱150

6.

What is one requirement before a person can take the civil engineering board exam?

a)

Must be a licensed architect

b)

Must have passed a civil service exam

c)

Must be a graduate of a recognized civil engineering program

d)

Must have five years of experience

7.

What does the official seal of a civil engineer signify?

a)

Professional accountability

b)

Employment status

c)

Academic achievement

d)

Government license

8.

Which of the following is exempt from registration under RA 544?

a)

Engineering graduates

b)

Military personnel

c)

Licensed architects

d)

City engineers

9.

What is the minimum waiting period for reissuing a revoked certificate?

a)

6 months

b)

1 year

c)

2 years

d)

Immediately upon request

10.

Who is responsible for administering the civil engineering licensure exam?

a)

Civil Service Commission

b)

Department of Public Works and Highways

c)

Professional Regulation Commission

d)

Technical Education and Skills Development Authority

11.

Which of the following is a possible penalty for violating the provisions of RA 544?

a)

Fine and/or imprisonment

b)

License renewal suspension

c)

Community service

d)

Public reprimand

12.

Which of the following cannot be registered as a civil engineering entity?

a)

A sole proprietor

b)

A partnership

c)

A corporation

d)

A government agency

13.

Who maintains the official roster of civil engineers?

a)

Board of Civil Engineering

b)

DPWH

c)

City Mayor

d)

PRC Commissioner

14.

Under the reciprocity rule, a foreign applicant must prove that:

a)

They have passed a local exam

b)

They speak Filipino

c)

Filipino engineers can practice in their country

d)

They have a Philippine residency

15.

What happens if a part of RA 544 is declared unconstitutional?

a)

The rest remains valid

b)

The whole law is repealed

c)

The law is revised

d)

The PRC decides

16.

What is the main purpose of the examination requirement?

a)

To reduce the number of engineers

b)

To maintain professional standards

c)

To meet international laws

d)

To issue diplomas

17.

What structures require the seal of a civil engineer?

a)

Houses only

b)

Public-use buildings

c)

Commercial kiosks

d)

Tents

18.

Which professionals may assist in engineering work without registration?

a)

Construction managers

b)

Retired engineers

c)

Foreign consultants

d)

Students and draftsmen

19.

When can a civil engineer's certificate of registration be revoked?

a)

When failing an exam twice

b)

When changing professions

c)

When found guilty of unethical or dishonest conduct

d)

When reaching retirement age

20.

What does the term 'transitory provision' cover?

a)

Exam venue changes

b)

Construction laws

c)

Fee adjustments

d)

Transition of old license holders

21.

What is the primary objective of RA 9184?

a)

Streamline civil service exams

b)

Ensure transparency and competitiveness in government procurement

c)

Support private sector monopoly

d)

Promote international travel

22.

What body oversees public procurement policies in the Philippines?

a)

COA

b)

DILG

c)

CHED

d)

GPPB

23.

What procurement method is generally required under RA 9184?

a)

Negotiated Procurement

b)

Competitive Bidding

c)

Direct Purchase

d)

Exclusive Bidding

24.

What does PhilGEPS stand for?

a)

Philippine Goods Evaluation Procurement System

b)

Philippine Generalized Economic Procurement Services

c)

Philippine Government Entity Procurement System

d)

Philippine Government Electronic Procurement System

25.

What document outlines the approved budget for procurement?

a)

Notice to Proceed

b)

Bid Security

c)

Approved Budget for the Contract (ABC)

d)

Annual Investment Plan

26.

Who chairs the Bids and Awards Committee (BAC)?

a)

A designated official by the HoPE

b)

LGU Mayor

c)

Barangay Chairman

d)

Regional Director

27.

How many members can the BAC have?

a)

Three

b)

Four

c)

At least five but not more than seven

d)

Exactly six

28.

What is the function of the Bids and Awards Committee (BAC)?

a)

File procurement reports

b)

Supervise construction sites

c)

Conduct procurement activities and recommend contract awards

d)

Handle internal audits

29.

Which document must NOT reference specific brand names?

a)

Notice of Award

b)

Bidding Documents

c)

Post-Qualification Report

d)

Bill of Quantities

30.

What security must bidders provide to guarantee their commitment?

a)

Bid Security

b)

Performance Bond

c)

Completion Bond

d)

Eligibility Proof

31.

What is the purpose of the Pre-Procurement Conference?

a)

To finalize bidder rankings

b)

To file protests

c)

To sign the contracts

d)

To assess the readiness of the procurement activity

32.

How are bidders disqualified during eligibility check?

a)

If they are not local residents

b)

If their documents are incomplete or inaccurate

c)

If they request clarification

d)

If they arrive early

33.

When is a bidding process declared a failure?

a)

All bids are non-compliant or no eligible bids are received

b)

No winner emerges

c)

Budget exceeds ₱1M

d)

Award is postponed

34.

What is Repeat Order in procurement?

a)

Ordering from a different bidder

b)

Re-ordering items from the previous winning bidder under set conditions

c)

Canceling a purchase

d)

Ordering all items again

35.

Which alternative method is used during emergencies?

a)

Direct Contracting

b)

Shopping

c)

Limited Bidding

d)

Negotiated Procurement

36.

What penalty applies to collusion in bidding?

a)

Reprimand

b)

Suspension

c)

Imprisonment of 6 to 15 years

d)

Community service

37.

What percent of the unperformed portion is charged as liquidated damages per day for delays?

a)

0.05%

b)

0.1%

c)

1%

d)

2%

38.

Who has final decision over protests if within their approval authority?

a)

Head of Procuring Entity (HoPE)

b)

Supreme Court

c)

Regional Trial Court

d)

BAC Chairperson

39.

What is the purpose of warranty security in procurement contracts?

a)

To delay payment to suppliers

b)

To reduce taxes on materials

c)

To guarantee repair or replacement of defective goods

d)

To cover administrative costs

40.

What is the main reason for a post-qualification process?

a)

To award immediately

b)

To verify bidder's compliance and capacity

c)

To request payment

d)

To announce results publicly