wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Knowledge test V3

Total questions: 40

Worksheet time: 3600secs

Name
Class
Date
1.

Which of the following circuits provides the ability to switch on the network and restore supplies more efficiently in the event of a fault

a)

A parallel circuit without an open point

b)

A ring circuit with an open point

c)

A radial circuit with an open point

d)

A radial circuit without an open point

2.

The Electricity Safety, Quality and Continuity Regulations 2002 place duties on persons to report certain instances. Which ONE of the following is NOT reportable under ESQCR?

a)

Major interruption to the electricity supply

b)

Domestic fatalities attributed to electrical equipment

c)

Serious injuries, fires and explosions

d)

Volume of CO2 emitted by the organisation's vehicles and equipment

3.

The formula for calculating the resistance of a circuit can be expressed as:

a)

R = V²/I

b)

R = P/I²

c)

R = V/R

d)

R = P/I

4.

Which of the following is used to describe the typical purpose of an automatic voltage control relay on the operation of transformer's?

a)

Monitor the transformer's tap changer and send an automated signal to network control

b)

Control the transformer's input and output via a tap changer to keep it within it's statutory limits

c)

Monitor the transformer's temperature and control its voltage output to prevent damage to the transformer

d)

Monitor the transformer's output voltage and control its tap changer to keep the voltage within its statutory limits

5.

Which of the following describes the effect of harmonics on power transformer's?

a)

The voltage regulation improves the system losses and reduces the over-stressing of insulation materials by reducing the effect of heat

b)

The voltage distortion increases transformer efficiency by raising the voltage and lowering the current produced by the windings

c)

The voltage distortion decreases transformer efficiency by raising the voltage and lowering the current produced by the windings

d)

The voltage distortion increases the losses causing the over-stressing of insulation materials through the generation of additional heat

6.

Which of the following is NOT in the Electricity at Work Regulations?

a)

All systems shall at all times be of such construction as to prevent, so far as reasonably practicable, danger

b)

Based on cost and time, certain activities shall be carried out in such a manner as not to give rise, so far as reasonably practicable, to danger

c)

As may be necessary to prevent danger, all systems shall be maintained so as to prevent, so far as reasonably practicable, such danger

d)

Any equipment provided under these Regulations for the purpose of protecting persons at work on or near electrical equipment shall be suitable for the use for which it is provided, be maintained in a condition suitable for that use, and properly used.

7.

A delta - star connected transformer has its:

a)

Primary winding star-connected and its secondary winding delta-connected

b)

Primary and secondary winding inter-connected

c)

Primary and secondary winding both in delta-star

d)

Secondary winding start-connected and its primary winding delta-connected

8.

Which of the following identifies the typical voltage tolerances for UK low voltage (up to 1000v) and high voltage (up to 132kV) power networks?

a)

LV +6% and -10%, High Voltage ± 6% of nominal voltage

b)

LV +10% and -6%, High Voltage ± 6% of nominal voltage

c)

LV ± 5% High Voltage - 10% of nominal voltage

d)

LV ± 6 High Voltage ± 10% of nominal voltage

9.

Ofgem's RIIO (Revenue = Incentives + Innovation + Outputs) price controls are designed to encourage?

a)

Price competition between transmission and distribution companies which improve costs and reduce the cost of supply

b)

Price competition between transmission and distribution companies which reduce the cost of supply regardless of the cost

c)

Network companies to deliver a sustainable energy sector in a way that brings consumers value for money

d)

Network companies to reduce the amount of system faults and penalise Company's which fail to meet the standards

10.

Electricity is typically generated in large commercial power stations at:

a)

400V

b)

230V

c)

25kV

d)

132kV

11.

A power network circuit with a low power factor will generally use:

a)

Lower currents to transfer a given quantity of real power than a circuit with a high power factor

b)

Higher currents to transfer a given quantity of real power than a circuit with a high power factor

c)

Higher voltage to transfer a given quantity of real power than a circuit with a high power factor

d)

Lower resistance to transfer a given quantity of real power than a circuit with a high power factor

12.

Voltage transformer's (VT) can be used for circuit control, safety protection and measurement, but which of the following describes the principle of its operation

a)

Step up the voltage of the system to a value which is acceptable to the higher rating of meters and relays

b)

Convert the alternating waveform of the system to a direct waveform to supply meters and relays

c)

Step down the voltage of the system to a value which is acceptable to the lower rating of meters and relays

d)

Accept the voltage of the system and connect it directly to the higher rater meters and relays

13.

The electricity supply to a domestic consumer is usually protected at the incoming service position by a:

a)

Meter

b)

Double pole switch

c)

100A MCB

d)

100A HBC fuse

14.

The maximum amount of current that will flow in the case of a short circuit at a point in the system is known as:

a)

Fault level

b)

Current level

c)

Voltage level

d)

Maximum Resistance level

15.

Identify the correct order of the 5-step risk assessment:

a)
  1. 1. Identify the hazards

  2. 2. Evaluate the risks effect and likelihood

  3. 3. Assess the risk and take action

  4. 4. Record

  5. 5. Review and monitor

b)

1. Evaluate the risks effect and likelihood

2. Identify the hazards

3. Assess the risk and take action

4. Record

5. Review and monitor

c)

1. Identify the hazards

2. Assess the risk and take action

3. Evaluate the risks effect and likelihood

4. Review and monitor

5. Record

d)

1. Identify the hazards

2. Evaluate the risks effect and likelihood

3. Review and monitor

4. Assess the risk and take action

5. Record

16.

Complete the sentence:

A typical capabilities of a high voltage SF6 circuit breaker can make and break load ..........

a)

but only make fault current

b)

but not make or break fault current

c)

and make and break fault current

d)

but only break fault current

17.

What is meant by the term achieving 'Safety from the System'?

a)

That all equipment shall be made dead prior to any work activities permitted on the electrical network

b)

The condition which safeguards equipment from the dangers of work being conducted on the electrical network

c)

The condition which safeguards persons working on or near to equipment from the dangers which are inherent in a system

d)

The condition which safeguards persons, tools, equipment and plant when working on or near the electrical system

18.

three phase transformer' may only be connected in parallel when?

a)

They are identical in all respects

b)

They have exactly the same losses

c)

The permission of the transformer manufacturer is obtained

d)

They have the same secondary voltages

19.

In a balanced three-phase system with star-connected load and 415V line voltage, the phase voltage is:

a)

415V

b)

240V

c)

0V

d)

719V

20.

Which of the following statements is NOT one of Ofgem's primary goals?

a)

Use price controls to limit what transmission and distribution charge

b)

Prescribe robust safety and working methods for the transmission and distribution of power

c)

Set targets for reliability, customer service and environmental performance

d)

Encourage companies to innovate to cut costs for consumers and operate efficiently

21.

A relay that operates by the principle that the higher the current value the lesser the time it will take for the relay to operate is known as following which protocol?

a)

Immediate Delay Measured Sequence (IDMS) protocol

b)

Inverse Decision Time Measure (IDTM) protocol

c)

Individual Delayed Time Sequence (IDTS) protocol

d)

Inverse Definite Minimum Time (IDMT) protocol

22.

The Electricity at Work Regulations 1989 state that "Generally, you should do everything reasonably practicable to protect people from harm". What does reasonably practicable mean in this instance?

a)

Reasonably Practicable means gauging the level of harm which may be inflicted against set costs needed to control the level of risk

b)

Reasonably Practicable means costing the level of risk against the time and inconvenience of providing protection in all conditions

c)

Reasonably Practicable means implementing all necessary control measures at all times regardless of the level of risk, time and inconvenience

d)

Reasonably Practicable means balancing the level of risk against the measures needed to control the real risk in terms of money, time or trouble

23.

Which one of the following identifies the primary purpose of a Risk Management Strategy?

a)

Cost efficient approach to identifying, assessing and managing the company's financial risk

b)

Clear and coherent legally binding methods of reducing a company's exposure to risk

c)

Structured and coherent approach to identifying, assessing and managing risk

d)

Auditable process which protects a company from liability in the event of an incident

24.

What effect will increasing the number of secondary turns on a transformer winding connected to an AC supply have on the voltage?

a)

Decrease the output voltage

b)

Decrease the input voltage

c)

Increase the input voltage

d)

Increase the output voltage

25.

The formula for calculating the voltage in a circuit can be expressed as:

a)

V = P²/R

b)

V = P/R

c)

V = P/I

d)

V = R x I²

26.

Power factor correction is applied to an AC circuit in order to create the conditions where the:

a)

Current leads the voltage

b)

Voltage leads the current

c)

Voltage and current are out of phase

d)

Voltage and current are in phase

27.

In a balanced three-phase system with delta-connected load and 10A line current, the phase current is:

a)

10A

b)

17.3A

c)

5.77A

d)

30A

28.

Which of the following identifies the typical maximum permitted earth fault loop impedance values for UK distribution low voltage networks?

a)

PME - (TNCS) 2.0Ω Cable sheath/Separate (TN-S) - 1.0Ω

b)

PME - (TNCS) 2.0Ω Cable sheath/Separate (TN-S) - 10Ω

c)

PME - (TNCS) 0.8Ω Cable sheath/Separate (TN-S) - 0.35Ω

d)

PME - (TNCS) 0.35Ω Cable sheath/Separate (TN-S) - 0.8Ω

29.

Power factor correction in an AC power circuit can be achieved by:

a)

Removing capacitors or inductors that act to cancel the inductive or capacitive effects

b)

Adding capacitors or inductors that act to raise the inductive or capacitive effects

c)

Adding capacitors or inductors that act to cancel the inductive or capacitive effects

d)

Raising circuit voltage to cancel the inductive or capacitive effects

30.

Which one of the diagrams identifies the correct connection of an ammeter, a voltmeter and a wattmeter in a single phase circuit?

a)

a

b)

b

c)

c

d)

d

31.

Which of the harmonics typically causes neutral current to increase most significantly?

a)

The fifth harmonic

b)

The third harmonic

c)

The seventh harmonic

d)

All of the above contribute equally

32.

In a balanced three phase system the neutral current is equal to:

a)

Line current

b)

Phase current

c)

3 x phase current

d)

Zero

33.

A no-earth provided supply is also called a:

a)

TT system

b)

TN-S system

c)

TN-C-S system

d)

Standby system

34.

Which of the following describes the typical method of operation for a Buchholz relay within a power transformer?

a)

A Buchholz relay detects voltage changes within a transformer's windings to prevent internal faults

b)

A Buchholz relay detects changes in a transformer's oil flow or gas pressure to detect internal faults

c)

A Buchholz relay monitors changes in oil temperature to control the operation of a circuit breaker

d)

A Buchholz relay monitors the current flow in a transformer's windings to control output voltage

35.

Which piece of network equipment does the following describe - It reduces earth fault currents and limits the amount of fault current returning to the neutral point of a power transformer?

a)

A switch fuse

b)

A voltage transformer

c)

A protective multiple earth

d)

A neutral earthing resistor

36.

Select the correct answer to complete the statement:

The term transient fault describes a fault which typically affects the network .......

a)

intermittently for short periods of time

b)

immediately and permanently

c)

when the network is isolated and earthed

d)

by being detected at different locations on the network

37.

A permit-to-work system is a formal written system used to control certain types of work that are potentially hazardous.

A "permit-to-work" document specifies the:

a)

Work to be done and the time to be taken to complete the work safely, based on a risk assessment

b)

Work to be done and the precautions to be taken to complete the work, based on the time and cost of delivery

c)

Work to be done and the precautions to be considered to complete the work effectively in the set timescale

d)

Work to be done and the precautions to be taken to complete the work safely, based on a risk assessment

38.

In relation to commercial projects, the Construction Design and Management (CDM) Regulations 2015, require that under certain circumstances construction work is notifiable in writing to the HSE.

Which one of the following statement's identifies those circumstances, where planned construction work will last longer than?

a)

20 working days and involves more than 10 workers at any one time; or where the work exceeds 200 individual worker days

b)

50 working days and involves more than 30 workers at any one time; or where the work exceeds 100 individual worker days

c)

30 working days and involves more than 20 workers at any one time; or where the work exceeds 500 individual worker days

d)

40 working days and involves more than 15 workers at any one time; or where the work exceeds 300 individual worker days

39.

The Electricity Safety, Quality and Continuity Regulations 2002 (ESQCR) places duties to report certain incidents that may involve the safety of those not employed by the duty holder.

Which of the following identifies two of these incidents?

a)

Any single interruption of supply of 5 megawatts or more at the time of the interruption for a period of one hour or longer

Any single interruption to 5000 or more consumer's installations for a period of one hour or longer

b)

Any single interruption of supply of 1 megawatt or more at the time of the interruption for a period of five hours or longer

Any single interruption to 1000 or more consumer's installations for a period of five hours or longer

c)

Any multiple interruption of supply of 20 megawatts or more for more than two 5 minute periods

Any single interruption of supply to 10,000 or more consumer's installations for a period of two hours or longer

d)

Any single interruption of supply of 20 megawatts or more at the time of the interruption for a period of one hour or longer

Any single interruption to 10,000 or more consumer's installations for a period of one hour or longer

40.

The Construction Design and Management Regulations 2015 (CDM) places certain duties on "Commercial Clients" for whom a construction project is being carried out as part of their business. Which ONE of the following is NOT one of those duties?

a)

Manage the project to ensure sufficient time and resources are allocated

b)

Ensure relevant information is prepared and provided to other duty holders

c)

Ensure the principal designer and principal contractor carry out their duties

d)

Manage the time and working arrangements of all contractors on site