What are the two types of decommissioning in plumbing systems?

a)

Permanent and Temporary

b)

Regular and Irregular

c)

Fixed and Variable

d)

Short-term and Long-term

2.

When is a plumbing system permanently decommissioned?

a)

When it is temporarily out of use

b)

When it is no longer to be used

c)

When it needs regular maintenance

d)

When it is being upgraded

3.

What is a common reason for temporary decommissioning of a plumbing system?

a)

System is outdated

b)

System is being permanently removed

c)

System requires maintenance or repair

d)

System is being replaced with a new one

4.

What should be considered before the decommissioning of a gas-fired central heating system for a boiler replacement?

a)

The cost of the new boiler

b)

The isolation of services affecting other systems

c)

The color of the boiler

d)

The brand of the boiler

5.

What is required for an operative to work on a gas fitting?

a)

A plumbing license

b)

Gas Safe registration

c)

An electrical certificate

d)

A safety helmet

6.

What must be ensured when a gas pipe is disconnected?

a)

It is left open

b)

It is left gas tight

c)

It is left with a warning sign

d)

It is left with a temporary seal

7.

What needs to be isolated when decommissioning a system to enable draining?

a)

Hot feed

b)

Cold feed

c)

Return pipe

d)

Overflow pipe

8.

In an open-vented system, from where is the cold feed pipe isolated?

a)

From the boiler

b)

From the radiator

c)

From the F&E cistern or the stop tap feeding the F&E cistern

d)

From the main water supply

9.

What is the purpose of a filling loop in a sealed system?

a)

To permanently connect the system to the mains cold water

b)

To disconnect the system from the mains cold water

c)

To connect the system to the mains cold water only during filling

d)

To increase the pressure in the system continuously

10.

What procedure is recommended to follow when isolating electrical supplies?

a)

Safe Isolation procedure

b)

Emergency Shutdown procedure

c)

Lockout-Tagout procedure

d)

Electrical Safety procedure

11.

Why should a vent on a radiator be opened at a high level?

a)

To prevent an air lock

b)

To increase water pressure

c)

To reduce noise

d)

To improve heating efficiency

12.

Why is it important to replace Thermostatic radiator valve heads with manual caps?

a)

To improve heating efficiency.

b)

To prevent unwanted damage if temperatures drop and the valves open.

c)

To enhance the aesthetic appearance.

d)

To increase water flow.

13.

What should be used when disconnecting any metallic pipework for alteration or repair?

a)

Insulation tape

b)

Temporary continuity bonds

c)

Rubber gloves

d)

Plastic clamps