L04_Steel & Timber Framing System

Total questions: 20

Worksheet time: 12mins

Name
Class
Date
1.

Which of the following is a characteristic of lightweight construction?

a)

Higher embodied energy

b)

Less durable than heavyweight construction

c)

Requires more machinery

d)

More durable than heavyweight construction

2.

Which one is NOT a characteristic of heavyweight construction?

a)

Good thermal mass

b)

High maintenance

c)

Require heavy lifting equipment on site

d)

Excellent durability

3.

Which material is typically used in lightweight construction?

a)

Reinforced concrete

b)

Brick

c)

Timber and steel

d)

Concrete masonry

4.

Which of the following is a characteristic of steel framing systems?

a)

Low strength-to-weight ratio

b)

Requires heavier machinery for construction

c)

Faster construction with prefabricated components

d)

Poor resistance to weather and pests

5.

What is the primary advantage of steel framing systems?

a)

High thermal mass

b)

Durability and fire resistance

c)

High strength-to-weight ratio

d)

Lower embodied energy

6.

Which of the following is a disadvantage of steel framing systems?

a)

High cost

b)

Low sound insulation

c)

Requires extensive on-site welding

d)

Poor environmental impact

7.

Which type of steel framing uses a vertical column and horizontal beam framework to support loads?

a)

Wall bearing steel framing

b)

Skeleton framing

c)

Long-span framing

d)

Modular framing

8.

What is a key feature of long-span steel framing systems?

a)

Short spans

b)

Provide flexible floor spaces, column free internal spaces.

c)

Limited to residential construction

d)

Non-load-bearing walls

9.

Which of the following is an advantage of timber framing systems?

a)

High environmental impact

b)

Heavy machinery required for installation

c)

Environmentally friendly and cost-effective

d)

Poor aesthetic appeal

10.

What type of timber fabrication system is the oldest system of prefabrication?

a)

Modular Panel System

b)

Pre-cut System

c)

Large Size Panel System

d)

Volume Element System

11.

Which of the following is a benefit of using prefabricated timber in IBS?

a)

Increased on-site labor

b)

Faster and more efficient construction

c)

Higher maintenance

d)

Reduced strength-to-weight ratio

12.

The two (2) disadvantages of a steel framing system are low sound insulation and fire resistance.

a)

TRUE

b)

FALSE

13.

What type of timber fabrication system involves the assembly of large panels at the factory, which are then transported to the site?

a)

Pre-cut System

b)

Modular Panel System

c)

Large Size Panel System

d)

Volume Element System

14.

Which framing system is typically used to create column-free spaces in industrial buildings or auditoriums?

a)

Skeleton framing

b)

Wall bearing steel framing

c)

Long-span framing

d)

Timber framing

15.

What type of timber framing system involves the system permits of home buyer to see exactly what his house will looks like before it is built?

a)

Pre-cut System

b)

Modular Panel System

c)

Large Size Panel System

d)

Volume Element System

16.

Which of the following is a characteristic of heavyweight construction?

a)

Lower maintenance and environmental impact

b)

High embodied energy and environmental impact

c)

Ideal for warmer climates

d)

Requires fewer on-site adjustments

17.

Which type of steel framing system is anchored with bearing and end plates to masonry walls?

a)

Skeleton framing

b)

Wall bearing steel framing

c)

Long-span framing

d)

Modular framing

18.

What is the primary aesthetic advantage of timber framing systems?

a)

High strength

b)

Organic and natural aesthetic

c)

High environmental impact

d)

Resistance to pests

19.

In which construction system are components like roof trusses and panels pre-fabricated before being assembled on-site?

a)

Steel framing

b)

Timber framing

c)

Concrete framing

d)

Masonry construction

20.

Which timber framing system is most suitable for construction in the factory without the use of cranes?

a)

Pre-cut System

b)

Modular Panel System

c)

Large Size Panel System

d)

Volume Element System