Quality Control Fundamentals in Infrastructure Projects

Total questions: 10

Worksheet time: 2mins

Name
Class
Date
1.

What is the primary focus of Quality Control (QC) in construction projects?

a)

Planning project budgets

b)

Identifying defects in the final product

c)

Preventing defects through planning

d)

Designing construction layouts

2.

Which phase involves final inspections and preparation of punch lists?

a)

Design Phase

b)

Construction Phase

c)

Pre-Construction

d)

Post-Construction

3.

Why is materials testing critical in QC?

a)

It can replace the need for inspections

b)

It prevents contractors from cheating

c)

It provides definite evidence of material quality

d)

It helps make construction faster

4.

What document from DPWH sets the national standards for QC?

a)

ISO Handbook

b)

DPWH Blue Book

c)

ASTM Manual

d)

Quality Control Logbook

5.

Who is primarily responsible for supervising materials testing?

a)

Project Inspector

b)

Survey Team

c)

Materials Engineer

d)

Field Technician

6.

Poor joint construction in concrete leads to:

a)

Better compaction

b)

Water ingress and cracking

c)

Cost savings

d)

Higher strength

7.

What is a best practice during the material management phase?

a)

Skip laboratory verification

b)

Test only upon final delivery

c)

Pre-qualify materials and suppliers

d)

Use non-standard methods

8.

What should be included in QC summary reports?

a)

Budget details

b)

Daily timesheets

c)

Test results and certifications

d)

Contractor’s personal notes

9.

Which role collects field samples and performs on-site tests like the slump test?

a)

Laboratory Aide

b)

Resident Engineer

c)

Project Engineer

d)

Field Technician

10.

Which team ensures all works are aligned per design and elevation during construction?

a)

Field Technicians

b)

Materials Engineers

c)

Survey Team

d)

Project Inspectors