Excavation work in substructure works must ensure...........
A. Aesthetics
B.Safety and Accuracy
C. Decorations
D. Quick Completion
2.Concrete in footings is cured for ........days
A. 3days
B. 7 days
C.28days
D. 1 day
3.Strip foundation is most suitable for.......
A. Bridges
B. Heavy machinery
C.Multi storey buildings
D. Load bearing walls
Which test is used to determine soil bearing capacity
A. Plate load test
B. PH test
C. Slump test
D. Compression test
5.State one reason for using raft foundation
What is the function of reinforcement in concrete?
List one risk of not curing concrete properly.
8 Soil testing is optional before constructing a substructure.
True
False
Excavation should be done according to structural plan.
False
True
Pile foundation is suitable for weak or unsuitable Soils.
True
False