POWER SYSTEM

Total questions: 13

Worksheet time: 7mins

Name
Class
Date
1.

How many and what types of substations are included in the Shah Alam Line's 132kV Bulk Supply System?

a)

2 BSS, 1 SSU, 18 TPSS, 7 RS, 2 LVSS

b)

3 BSS, 2 SSU, 16 TPSS, 5 RS, 3 LVSS

c)

2 BSS, 1 SSU, 20 TPSS, 6 RS, 2 LVSS

d)

1 BSS, 1 SSU, 18 TPSS, 7 RS, 2 LVSS

2.

Under which condition will the No-Volt Automatic Changeover (NVAC) Scheme be initiated?

a)

When total power loss occurs at BSS or SSU

b)

During any minor voltage fluctuation in the 33kV system

c)

Under single failure condition of BSS equipment or outgoing feeder to 33kV network at BSS

d)

When power supply increases above 110% of nominal voltage

3.

Which of the following statements about the NVAC Scheme is true?

a)

NVAC will be triggered during total power loss at the BSS

b)

NVAC will automatically restore power through permanent genset

c)

NVAC operates through manually controlled switches only

d)

NVAC will not initiate if power drops below 50% for less than 3 seconds

4.

What is the main function of the Load Break Switch?

a)

To increase power supply

b)


To monitor voltage levels

c)

To provide emergency power

d)

To connect or isolate two power rail sections

5.

What happens when a BLS plunger is activated?

a)

It sends a wireless signal to the station operator for manual shutdown

b)

It energizes the 110V DC trip circuit to open the BLS door

c)

It cuts off the 110V DC trip circuit and triggers the BLRP to trip the DC Feeder Breaker

d)

It automatically resets the BLS and re-energizes the power rail

6.

Which of the following signals are sent from the BLS to SCADA?

a)

BLS Temperature Alarm and BLS Maintenance Status

b)

BLS Tripping Signal and BLS Door Open

c)

BLS Reset Confirmation and BLS Voltage Status

d)

BLS Activation Timer and BLS Location Update

7.

What are the requirements that must be fulfilled in order to close a CIS?

a)

Bustie closed

b)

F1 and F2 closed

c)

F1 and F3 closed

d)

F2 and F4 closed

8.

How many types of Traction Power Substations (TPSS) are there in the Shah Alam Line?

a)

5

b)

9

c)

2

d)

8

9.

Where is the Line Test Device (LTD) located?

a)

HSCB Rectifier Trolley Breaker

b)

HSCB Trolley Positive Breaker

c)

HSCB Trolley Negative Breaker

d)

CIS Trolley

10.

How many types of HSCB (High-Speed Circuit Breaker) are there, and where are they located?

a)

1 type – UR60 only, located at all HSCB breaker

b)

2 types – UR40 at all feeder and inverter breaker, UR60 at rectifier breaker and bustie

c)

2 types – UR40 at Rectifier breaker and bustie and UR60 at all feeder and inverter breaker

d)

3 types – UR20, UR40, and UR60 at all feeder

11.

What is the resistance value (in ohms) of the Neutral Earthing Resistor (NER)?

a)

26 ohms

b)

30 ohms

c)

27 ohms

d)

24 ohms

12.

What is the minimum voltage for earthing switch to LED "permit to operate" appear?

a)

110VDC

b)

85VDC

c)

50VDC

d)

0VDC

13.

Who is Line Coordinator For East PM/CM?

a)

En Hanif

b)

Pn Asiah

c)

En Akmal

d)

En Hazziq