CBT Ch 23 Part 2 Plumbing Sys - CHAPTER TEST

Total questions: 35

Worksheet time: 18mins

Name
Class
Date
1.

What is the main difference between a sprinkler system and a standpipe system in building firefighting?

a)

Sprinkler systems are manual while standpipe systems are automatic

b)

Sprinkler systems are automatic while standpipe systems have reserve water supply

c)

Standpipe systems only use fire hoses while sprinkler systems only use sprinkler heads

d)

Sprinkler systems are connected to fire hydrants while standpipe systems use rooftop tanks

2.

How are sprinkler heads in an automatic sprinkler system activated?

a)

By a manual switch at the fire station

b)

Through electronic sensors detecting smoke

c)

When a temperature-sensitive plug melts

d)

By pressure changes in the water system

3.

What happens when the water level gets too low in a standpipe system's rooftop tank?

a)

The system automatically shuts down

b)

Emergency water from fire hydrants is activated

c)

Auxiliary pumps take over the water supply

d)

A float switch activates the main pump to refill the tank

4.

In the event of an electrical system failure, how does the standpipe system continue to function?

a)

It switches to a backup generator automatically

b)

Water is pumped from fire trucks through outside inlets

c)

The rooftop tank gravity feed continues operation

d)

The system becomes non-operational until power returns

5.

Which of the following is true about the standpipe system's design?

a)

It can only be used with sprinkler heads

b)

It must be connected to the building's potable water system

c)

The fire hoses are positioned to protect all areas of the building

d)

It requires constant electrical power to function

6.

What are the primary factors considered when designing process fluid systems?

a)

Chemical composition, liquid quantity, temperature, and pressure

b)

Color, density, viscosity, and toxicity

c)

Storage capacity, pipe diameter, and flow rate only

d)

Only the chemical composition and temperature

7.

Which statement best describes how process fluids are handled in industrial settings?

a)

All process fluids are combined in a single piping system

b)

Process fluids are mixed with regular wastewater

c)

Each process fluid is kept in separate systems based on their properties

d)

Process fluids are always stored in open containers

8.

How is toxic waste that cannot be treated in wastewater treatment plants managed?

a)

It is always released into the environment

b)

It is mixed with regular waste

c)

It is only treated through burning

d)

It can be contained, stored, burned, or treated on site

9.

Why are process fluid systems separated from other systems?

a)

To reduce installation costs

b)

To protect workers and the environment

c)

To increase fluid pressure

d)

To simplify maintenance procedures

10.

Which characteristic of process fluids requires special consideration in system design?

a)

The color of the fluid

b)

The odor of the fluid

c)

Some fluids can corrode metal

d)

The sound the fluid makes when flowing

11.

What is a primary reason for color coding medical gas piping systems in hospitals?

a)

To make the pipes more aesthetically pleasing

b)

To prevent cross connections and ease system tracing

c)

To indicate the temperature of the gases

d)

To show which department installed the pipes

12.

Who is typically responsible for designing plumbing systems in commercial and industrial buildings?

a)

Plumbers

b)

Architects

c)

Engineers

d)

Building managers

13.

Who determines the placement and selection of fixtures such as sinks and toilets in commercial buildings?

a)

Engineers

b)

Plumbers

c)

Building managers

d)

Architects

14.

What special requirement must be met for medical gas piping systems after assembly?

a)

The pipes must be painted

b)

The pipes must be pressure tested

c)

The inside must be sterilized

d)

The outside must be insulated

15.

Which materials are most commonly used in residential and light commercial piping?

a)

Steel and iron

b)

Copper and plastic

c)

Bronze and brass

d)

Aluminum and steel

16.

Which type of copper pipe is required for underground water supply piping and exposed water supply piping in finished structures?

a)

Type L

b)

Type K

c)

Type M

d)

Type DWV

17.

What is the primary advantage of all copper pipe types having the same outside diameter for a given size?

a)

It makes the pipe more durable

b)

It reduces installation time

c)

It eliminates the need for different fittings for each size

d)

It improves water flow efficiency

18.

When would soft temper copper tubing typically be used in plumbing installations?

a)

For all indoor water supply lines

b)

For main drainage systems

c)

For connecting ice makers to water supply

d)

For all exposed piping installations

19.

Which type of copper pipe is appropriate for DWV piping that will be exposed in the completed structure?

a)

Type K

b)

Type DWV

c)

Type L

d)

Type M

20.

What is a key characteristic of DWV fittings?

a)

They are only available in plastic materials

b)

They have protruding edges for better grip

c)

They have smooth intersections to promote unobstructed waste flow

d)

They are only available in sizes up to 2 inches

21.

During which stage of plumbing installation are sinks, lavatories, toilets, and faucets typically installed?

a)

First-rough stage

b)

Pre-foundation stage

c)

Second-rough stage

d)

Finish stage

22.

What is the primary reason tubs and shower bases are installed during the second-rough stage?

a)

To test the water pressure

b)

To allow wall covering materials to be fitted around them

c)

To ensure proper drainage

d)

To meet code requirements

23.

When installing plastic water supply pipe, what is the correct method to determine the total pipe length needed?

a)

Measure only the face-to-face distance

b)

Subtract the fitting allowance from face-to-face measurement

c)

Add one fitting allowance to the face-to-face measurement

d)

Add fitting allowances for both ends to the face-to-face measurement

24.

Which type of plastic pipe is required for hot water plumbing installations?

a)

PVC

b)

CPVC

c)

Standard vinyl

d)

Basic polyethylene

25.

What is the final step when joining plastic pipe and fittings?

a)

Apply cement only to the pipe end

b)

Let the cement dry for 30 minutes

c)

Insert the pipe and rotate one-quarter turn

d)

Clean with water after assembly

26.

What is the first step in preparing copper pipe for soldering after cutting?

a)

Apply flux to the pipe

b)

Clean with a tube brush

c)

Ream the inside of the pipe

d)

Push pipe into fitting socket

27.

When heating the joint during soldering, which part should be heated first?

a)

The fitting

b)

The pipe

c)

The solder

d)

The flux

28.

What indicates that the joint is ready for soldering?

a)

The pipe turns red

b)

The flux starts bubbling

c)

The fitting changes color

d)

The solder starts smoking

29.

How should a newly soldered joint be cleaned?

a)

Let it air dry

b)

Use compressed air

c)

Wipe with a dry cloth

d)

Wipe with a damp cloth

30.

When installing copper tubing with compression fittings, what is the correct sequence?

a)

Cut tube, add ring, tighten nut, ream end

b)

Ream end, cut tube, add ring, tighten nut

c)

Cut tube, ream end, fit nut and ring, tighten

d)

Add ring, cut tube, ream end, tighten nut

31.

What is the primary purpose of using pipe supports in plumbing installations?

a)

To make the pipes look more organized

b)

To prevent joint cracking due to pipe movement

c)

To increase water pressure in the system

d)

To reduce the cost of installation

32.

Which inspection must be completed before pipes and fittings are covered during the second-rough phase?

a)

Final occupancy inspection

b)

Interior trim inspection

c)

Pressure and leak testing

d)

Fixture installation check

33.

What method is NOT commonly used to check for leaks in plumbing systems?

a)

Using compressed air and pressure gauges

b)

Applying soapy water solution to joints

c)

Using electrical conductivity testing

d)

Using smoke or smelly gas

34.

During which stage of plumbing installation are fixtures like faucets and showerheads typically installed?

a)

First-rough stage

b)

Second-rough stage

c)

Pre-inspection stage

d)

Finish stage

35.

Which of the following is NOT a typical item checked during plumbing inspections?

a)

Proper pipe slope in DWV piping

b)

Installation of cleanouts

c)

Paint color of exposed pipes

d)

Proper pipe support installation