Wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Design-to-Operate process in SAP S/4 HANA Quiz

Total questions: 27

Worksheet time: 12mins

Name
Class
Date
1.

What are the primary goals of demand planning?

a)

To forecast future product demand and inform production activities.

b)

To manage inventory levels and reduce costs.

c)

To streamline supply chain processes.

d)

To run MRP and initiate procurement process

2.

Outline the basic steps involved in demand planning.

a)

Data collection, forecasting, and planning.

b)

Production scheduling and inventory management.

c)

Sales forecasting and order processing.

d)

Compare plan and actual data and perform demand planning.

3.

How is planning data transferred from SAP IBP to SAP S/4HANA?

a)

Through manual entry.

b)

Using automated data integration tools.

c)

By exporting and importing files.

4.

What are 'planned independent requirements' and their role in this transfer?

a)

They represent a forecast for stock and transferred from SAP IBP to S/4HANA.

b)

They are used for inventory management.

c)

Requirements planned in S/4 HANA during design phase of the product.

d)

Represents requirements transferred from S/4 HANA to SAP IBP to perform Demand Planning.

5.

Which SAP S/4HANA functionalities are relevant for the "Deploy" phase, concerning the movement and storage of goods?

a)

Warehouse Management (WM)

b)

Quality Management (QM)

c)

Sales Order Management

d)

Plant Maintenance (PM)

6.

How does SAP Fiori contribute to the Design to Operate process? (There are two correct answers)

a)

By providing advanced data modeling capabilities

b)

By offering role-based access to relevant information and tasks

c)

By enabling a consistent user experience across different devices

d)

By automating complex analytical processes

7.

Which of the following process/application is part of SAP IBP landscape. (There are three correct answers)

a)

Demand driven replenishment

b)

Demand forecasting & planning.

c)

Material Requirement Planning

d)

Sales & Operations Planning

8.

Which of the following are basic logistics objects for supply chain planning? (There are two correct answers)

a)

Distribution Centers

b)

Functional location

c)

Plants

d)

Production Order

9.

Which of the following data in MRP data is relevant for handling independent requirements?

a)

planning strategy

b)

procurement type

c)

lot-size procedure

d)

production version

10.

Which of the following fields is not part of MRP data in Material Master data?

a)

Basic Unit of Measure

b)

lot-size procedure

c)

procurement type

d)

advanced planning

11.

In which of the following applications work center is used? (There are two correct answers)

a)

Routings

b)

Bill of Materials

c)

Inspection plans

d)

Statistical Key Figure

12.

Product cost planning provides detailed information on the following

a)
  • Comparison of production cost in large versus small lot sizes

b)

To reduce variances after the production process.

c)

To analyse sales and administrative costs.

d)

To understand and analyse cost center balances as part of period-end activity.

13.

Product cost planning assists with optimisation of the production process.

a)

True

b)

False

14.

Which of the following is the correct order of Material Cost Estimate?

a)

complete master data (BOM and routing) -> calculation of COGM -> Mark standard price in the product master - > Release standard price in the product master

b)

complete master data (BOM and routing) -> Mark standard price in the product master - > Release standard price in the product master -> calculation of COGM

c)

calculation of COGM -> complete master data (BOM and routing) -> Mark standard price in the product master - > Release standard price in the product master

d)

complete master data (BOM and routing) -> calculation of COGM -> Release standard price in the product master - > Mark standard price in the product master

15.

Which indicator in material master controls what price is used to evaluate the material inventory.

a)

Moving Average Price

b)

Valuation Class

c)

Standard price

d)

Price control

16.

Material Cost Estimate has been executed for a material which has inventory balance and the new price has been released. Which of the following statements is correct?

a)

Inventory is updated and posted to finance.

b)

Inventory quantity is updated and posted to finance

c)

Inventory quantity is not updated and no posting to finance

d)

Future price of material is updated and no update is done to inventory and finance.

17.

MRP assists with identifying the right source of supply for procurement.

a)

True

b)

False

18.

Following items are created in the system as a result of MRP run. (There are two correct answers)

a)

Production Order

b)

Purchase requisition

c)

Purchase order

d)

Planned Order

19.

Planned Order created by MRP run can be converted into Purchase requisition

a)

True

b)

False

20.

Which of the following planning methods can be selected using MRP type in Material Master? (There are two correct answers)

a)

Consumption-based planning

b)

Deterministic planning

c)

Discrete planning

d)

Optimistic planning

21.

Following are the steps of MRP. (There are three correct answers)

a)

Planning relevant MRP type

b)

Net requirements calculation

c)

Assessment of procurement alternatives

d)

Quantity Calculation

22.

Identify the right sequence of production process

a)

Order Creation -> Order Release -> Goods Issue -> Confirmations -> Goods Receipt -> Settlement of Variances

b)

Order Creation -> Order Release -> Goods Receipt -> Confirmations -> Goods Issue -> Settlement of Variances

c)

Order Creation -> Order Release -> Goods Receipt-> Confirmations -> Settlement of Variances -> Goods Issue

23.

Following accounts are updated during goods issue posting. (There are two correct answers)

a)

Stock account

b)

Consumption account

c)

Variance account

d)

GRIR account

24.

Controlling document is posted at the time of Goods Issue in production process

a)

True

b)

False

25.

Controlling Document is generated at the time of goods issue during production process

a)

True

b)

False

26.

Which of the following activities are part of periodic cost allocation? (There are three correct answers)

a)

Template allocation

b)

Revaluation at actual price

c)

Overhead costs

d)

Confirmations

e)

Settlements

27.

Which of the following accounts are updated during settlement process? (There are three correct answers)

a)

Stock A/c

b)

Work in process account

c)

Price difference/variance account

d)

Overhead account

e)

Activity account