wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

AC 1.3 & 1.4 Plenary Quiz

Total questions: 10

Worksheet time: 10mins

Name
Class
Date
1.

Only the HSE can issue a Prohibition Notice.

a)

True

b)

False

2.

Whose responsibility is it to ensure PPE is worn correctly on site?

a)

Buyer

b)

Quantity Surveyor

c)

Supervisor

d)

Architect

3.

What is the main role of the HSE on a construction site?

a)

Supply materials

b)

Enforce health & safety law

c)

Approve scaffold designs

d)

Manage site finances

4.

The Site Manager is legally responsible for designing safe systems of work?

a)

True

b)

False

5.

Which notice stops work immediately due to serious risk?

a)

Improvement Notice

b)

Warning Notice

c)

Prohibition Notice

d)

Observation Note

6.

Who is responsible for making sure workers are briefed before starting work?

a)

Architect

b)

Buyer

c)

Supervisor

d)

Client

7.

The architect is responsible for eliminating risks during the design stage.

a)

True

b)

False

8.

Under CDM Regulations, designers must eliminate or reduce risks in their design where reasonably practicable.

a)

True

b)

False

9.

Which of these powers does the HSE NOT have?

a)

Issue a fine on the spot

b)

Stop unsafe work

c)

Prosecute in court

d)

Approve scaffold designs

10.

Local Authorities can enforce health and safety on smaller or low-risk sites.

a)

True

b)

False