CBAP1

Total questions: 177

Worksheet time: 9hrs 51mins

Name
Class
Date
1.
4. You are the business analyst for your organization. Management has asked that you create a model of the requirements so the stakeholders can better understand the requirements and the project as a whole. Which of the following statements best describes a model?
a)
Models are slices of the project solution.
b)
Models simplify the requirements for common stakeholders.
c)
Models are statistics for the return on investment, time saved, and other mathematics.
d)
Models abstract and simplify reality.
e)
Text for option 5 (optional)
2.
5. What plan will describe the stakeholder groups, communication needs, and the level of formality that is appropriate for the requirements?
a)
Requirements management plan
b)
Project management plan
c)
Scope management plan
d)
Business analysis communication plan
3.
10. You are the business analyst for your organization and working with Tim to identify the assumptions within the business solution. Which one of the following is an assumption?
a)
The vendor believes the hardware should arrive by December 1
b)
The software must be compatible with Windows Vista
c)
The software must cost less than $99 per license
d)
The hardware must cost less than $450 per unit.
4.
12. Nancy has asked you to trace a particular requirement for her. What does 'to trace a requirement' mean?
a)
Tracing a requirement means to look at a requirement and the others to which it is related. It links risk, cost, quality, and scope elements to stakeholder and solution requirements to other artifacts created by the team and to solution components.
b)
Tracing a requirement means to look at a requirement and the others to which it is related. It links business requirements to stakeholder and solution requirements to other artifacts created by the team and to solution components.
c)
Tracing a requirement means to look at a requirement and the others to which it is related. It links business requirements to components in the project's work breakdown structure.
d)
Tracing a requirement means to track a requirements from its first identification all the way to its completion to see what issues, risks, costs, quality, and defects have surrounded the requirement
5.
16. What part of defining the business needs process will evaluate the ends that the organization is seeking to achieve?
a)
Business goals and objectives
b)
Alternative identification
c)
Solution assessment
d)
Requirements
6.
27. You are the business analyst for your organization. Management wants you to prioritize the identified requirements by the requirements that have the highest likelihood of success. Why would management want you to prioritize the requirements with this factor even though some of the requirements may be difficult to implement?
a)
They want a fast return on investment.
b)
They want to show early success in the implementation to the project stakeholders.
c)
They don't understand the requirements.
d)
They want to avoid penalties or fines due to a pending law.
7.
29. You have identified a task in your task list that cannot be completed until the inspector for the project signs off on the initial deliverables. The inspector's signoff on the initial deliverables is called what?
a)
Assumption
b)
Dependency
c)
Milestone
d)
Constraint
8.
30. Sally is the business analyst for her organization. Sally and her business analysis team is currently using a business analysis approach to determine what the competition of her organization is offering prospective clients. She is trying to identify solutions to increase revenue by remaining competitive with the competition. What business analysis approach is Sally and her business analysis team using?
a)
Business rules analysis
b)
Functional decomposition
c)
Focus groups
d)
Benchmarking
9.
32. You are the business analyst for your organization and are to conduct stakeholder analysis. Which of the following statements best describes the conduct stakeholder analysis task?
a)
This task identifies organizations and lines of business that may be affected by a proposed initiative or who share a common business need.
b)
This task identifies stakeholders who may be affected by a proposed initiative or who share a common business need.
c)
This task identifies the organizations that are likely affected by a problem that a project must solve.
d)
This task identifies the people who may be affected by a proposed initiative or who share a common business need.
10.
33 After the implementation of a new financial solution the business analyst (BA) observes that the performance of a solution does not meet the anticipated benefits detailed in the original business case. What is a technique the BA can use to understand the reason for that? A Data flow diagram B Fishbone diagram C Business capability analysis D interface analysis 40 You are the business analyst for your organization and you are preparing the business case for a proposed solution. You need to include the management horizon in your business case. What is the management horizon?
a)
It is the expected deliverables that will be beneficial for the organization.
b)
It is the point in time when the solution will be completed.
c)
It is the duration of each phase of the project until the solution earns a profit.
d)
It is the point in time for the solution to break even on cost and begin earning a profit.
11.
42. Donna is leading a brainstorming session for her organization. She has asked the participants in this group to come up with at least ten ideas for possible solutions to an identified problem. What is the problem with setting the goal as ten ideas for possible solutions in this session?
a)
The goal should be to come up with as many solutions as possible, not just ten ideas.
b)
The goal should be to generate ten ideas within a set time period.
c)
The goal should be to come up with the best solution for the problem, not ten ideas.
d)
The goal should be to include everyone's input to the solutions.
12.
43. You are the business analyst for your organization and working with the stakeholders to prioritize the requirements. The stakeholders are concerned about the financial impact of the requirements should some of them fail during the implementation. You would like to rank the risk tolerance of the stakeholders based on their comments about the solution and the requirements. The following are the three categories of risk tolerance associated with the stakeholders except for which one?
a)
Mitigation
b)
Risk-aversion
c)
Risk-seeking
d)
Neutrality
13.
44. What business analysis process ensures that requirements specifications and models meet the necessary standard of quality to allow them to be used effectively to guide further work?
a)
Identify constraints and assumptions
b)
Validate requirements
c)
Verify requirements
d)
Specify and model requirements
14.
47. You are the business analyst for your organization and are working with Virginia on the allocation of requirements for a new solution. You have assigned Virginia the task of breaking down the solution scope into smaller components for allocation. What technique have you asked Virginia to complete in this scenario?
a)
Decision analysis
b)
Business rules analysis
c)
Process modeling
d)
Functional decomposition
15.
51. You are hosting a collection of stakeholders from across the organization to identify the ideas and attitudes about your company's help desk. You want the stakeholders to honestly share their opinions about the help desk service so you can identify problems, solutions, and take actions to improve the service. What type of requirements elicitation activity is this?
a)
Stakeholder analysis
b)
Focus groups
c)
Workshop
d)
Root cause analysis
16.
53. You and Tom are writing the solution scope for a new project in your organization. You need to create a method to define what solution will and will not provide for the organization. What technique can you and Tom use to establish appropriate boundaries for the solution?
a)
Interviews with the key stakeholders
b)
User stories
c)
Functional decomposition
d)
Scope modeling
17.
54. Your organization is trying to determine which one of two opportunities they will pursue. The Project A is worth $235,987 and Project B is worth $567,000 but carries significant risk. The organization elects to purse Project B and not Project A. What is the opportunity cost in this scenario?
a)
$331013
b)
There is not enough information to know as the risk for Project B has not been quantified.
c)
$235,987
d)
$567,000
18.
62. You are working with several business analysts to determine the solution approach for an identified problem. All of the following techniques are acceptable for identifying the solution approach except for which one?
a)
Benchmarking
b)
Decision analysis
c)
Risk analysis
d)
Brainstorming
19.
64. You are the business analyst for your organization. You are currently working with Steve on the organize requirements process. You and Steve have elected to use the user stories approach for this process. What is the user stories approach for requirements organization?
a)
Stakeholders' experiences equate to the stakeholder requirements.
b)
Stakeholders are interviewed and their experiences are recorded to help identify the requirements.
c)
Stakeholders' objectives are described to identify the requirements that the solution will need to support.
d)
Stakeholders are interviewed and their stories are recorded as part of the requirements.
20.
101. During the requirement life cycle management, what should a business analyst (BA) do to extend the value of requirements beyond the current initiative?
a)
Assess
b)
Maintain
c)
Trace
d)
Prioritize
21.
104. Mark is the business analyst for his organization. He is working with the solution development team and he believes that the team does not want to implement a certain portion of the requirements. The team is expressing the difficulty of the requirements and how it will be extremely challenging to complete. When Mark asks about a similar project that the team completed, they insist that this is a different type of requirements though Mark believes that it is not. What is the solution development team appearing to do to the requirements?
a)
Change the prioritization of the requirements based on the past project.
b)
Change the prioritization of the requirements based on overstated complexity of the project work.
c)
Get the requirements removed from the project scope.
d)
Have the business analyst report the difficulty of the project work to the project customer.
22.
109. Martha is observing Gary complete several activities as part of her requirements elicitation process. Martha is simply observing the steps Gary takes to complete his work and she is taking notes. In this instance Martha does not ask Gary any questions. What type of observation technique is Martha completing?
a)
Shadowing
b)
Active
c)
Passive
d)
Usage consideration
23.
113. Which of the following is a characteristic of predictive planning approach?
a)
Activities are divided into iterations
b)
Requirements are gathered through team interaction and feedback
c)
Tasks are performed recurrently
d)
Information is captured in standardized templates
24.
117. In order to assess proposed solutions, business analysts will need three inputs. Which one of the following is not an input to the task of assessing proposed solutions?
a)
Solution options
b)
Requirements
c)
Risk assessments
d)
Assumptions and constraints
25.
118. You are the business analyst for a large project that will create new software for the entire organization. This new software will affect all of the administrative assistants in the organization schedule meetings, reserve facilities, and share calendars. There are approximately 2,400 administrative assistants in your organization and not all of these people can attend requirements gathering workshops. What approach can you use to manage and gather requirements from these 2,400 administrative assistants?
a)
You can meet with a small group of administrative assistants and assume their requirements are reflective of the remaining group of administrative assistants.
b)
You will need to meet with all of the administrative assistants as part requirements elicitation.
c)
You can meet with a small group of administrative assistants that will serve as representatives for the remaining administrative assistants.
d)
You can meet with the administrative assistants' managers.
26.
129. Zoe is the business analyst for her organization. She is currently prioritizing the requirements based on the implementation difficulty of the requirements to help with the solution planning. Which of the following best describes the approach Zoe is taking with requirements prioritization?
a)
The requirements are categorized by type of work, and then ranked within each category of ease of implementation to difficulty of implementation.
b)
The requirements are ranked most difficult to easiest to implement.
c)
The requirements are ranked from easiest to hardest to implement.
d)
The requirements are categorized by the likelihood of management approving the requirements.
27.
132. Robert is the business analyst for his organization and he's working with several stakeholders to identify the business need for an opportunity. Robert needs to identify the stakeholder that will be responsible for authorizing the actions needed in order to meet the identified business need. Which stakeholder does Robert need to identify?
a)
Sponsor
b)
Customer
c)
Implementation Subject Matter Expert
d)
Regulator
28.
152. You are the business analyst for a new project. Part of this project is for the project team to manually install new workstations through the company's campus. Based on your research you have determined that the project team can install 25 new workstations per hour. Since there is a fixed amount of time that these workstations need to be installed you are considering adding additional labor for the implementation. You are also considering to adjust the prioritization of the project requirements based on the amount of workstations the project team can install per hour. What does the 25 workstations per hour represent in this scenario?
a)
Timeboxing
b)
Planning
c)
Parametric estimate
d)
Report project
29.
Explanation: A parametric estimate is an estimate that uses a mathematical formula or model to calculate the time, cost, or resources required for a project or activity based on historical data and known variables. In this scenario, the 25 workstations per hour represents a parametric estimate of the productivity of the project team, which can be used to determine the total duration and cost of the installation. A parametric estimate is usually more accurate and reliable than other estimation techniques, such as expert judgment or analogy, as it is based on objective and quantifiable data. 158. Which conduct stakeholder analysis technique is useful for identifying shared characteristics of a stakeholder group?
a)
Surveys
b)
Scope modeling
c)
Brainstorming
d)
Interviews
30.
181. Which of the following models defines the name of the data, data aliases, and description of system data?
a)
Class model
b)
Entity relationship
c)
Data dictionary
d)
CRUD matrix
31.
184. What requirements elicitation technique examines the available information, documentation, records, and history of a solution, organization, or cause to identify relevant information to the current business analysis duties?
a)
Benchmarking
b)
Dataflow diagrams
c)
Document analysis
d)
Requirements elicitation
32.
Đán án C 187. You are the business analyst for your organization and need a method to requirements elicitation from nearly 12,000 stakeholders. You want a method to quickly capture this group's feelings and thoughts to identify what the majority of this group needs and wants in a new solution your organization may create. What requirements elicitation technique can be used in this scenario?
a)
Interviews
b)
Trend analysis
c)
Focus groups
d)
Surveys
33.
191. Mark is the business analyst for his organization. Mark and his business analysis team have used the whiteboard to record the documentation as the result of requirements elicitation. What must be done with this information if Mark uses a whiteboard?
a)
The scribe must include the white board information as part of the minutes.
b)
The business analyst must transfer the information to another medium before the whiteboard is erased.
c)
The business analyst must document the white board information and get all participants' approval of the recording.
d)
The regulator must approve the writings on the whiteboard.
34.
200. You are the business analyst for your organization. You want to use a requirements elicitation technique to produce a broad set of options for an identified problem. You want the stakeholders to help you identify options, factors that affect the solution, any possible delays in the solution implementation, and ideas for creating a solution. Which of the following requirements elicitation activities would best satisfy these requirements?
a)
Benchmarking
b)
Brainstorming
c)
Data flow diagrams
d)
Business rules analysis
35.
201. Which of the following models demonstrates the attributes, operations, and relationship to entities within the solution?
a)
Entity Relationship
b)
Data dictionary
c)
Class model
d)
CRUD matrix
36.
205. You are completing the prepare for elicitation process for an identified problem in your organization. The prepare for elicitation process requires three inputs for this process. Which one of the following is not an input that will help you prepare for the elicitation activities?
a)
Stakeholder list
b)
Stakeholder concerns
c)
Business need
d)
Solution scope
37.
269. Which of the following compares two or more systems, states, services, products, or things to determine the best viable choice?
a)
Benchmarking
b)
Risk Identification
c)
Risk analysis
d)
Cost-benefit analysis
38.
275. Which of the following captures all of the activities within a business, the inputs and outputs of each activity, and the required resources to complete each activity?
a)
Business scenario
b)
Business process model
c)
Business architecture
d)
Business case
39.
282. Which of the following involves defining the various threats, determining the extent of vulnerabilities, and devising countermeasures against a possible attack?
a)
Qualitative risk analysis
b)
Risk analysis
c)
Risk assessment
d)
Quantitative risk analysis
40.
283. Which of the following requirement attributes lacks any ambiguous characteristics?
a)
Understandable
b)
User Requirements Document (URD)
c)
Unambiguous
d)
Urgency
41.
284. Which of the following charts is described in the statement below? "It shows the causes of a certain event. A common use of this diagram is to identify potential factors causing an overall effect. It helps identify causal factors and contributing causes."
a)
Ishikawa
b)
Flowchart
c)
Process configuration chart
d)
Control chart
42.
285. Which of the following processes measures the maturity level of the security program?
a)
Risk analysis
b)
Risk mitigation
c)
Risk assessment
d)
GAP analysis
43.
286. A company that specialized in manufacturing vending machines for books has been in business for 10 years. As the e-book and online retailing grow, the company perceived that a change is required to respond to the new emerging market forces. However, the change should focus on reusability as much as possible to reduce expenses. After analyzing the current state with the business subject matter experts, the business analyst (BA) proposed investing in a new business line of vending machines that sell pay per use mobile device phone fast charging stations. Due to the urgency of this change, the BA was asked to finalize requirements elicitation in the shortest possible time. Customers who want to utilize the pay per use mobile device fast charging stations may choose one of two features: fully charged (F1) or partially charged (F2). If partially charged is selected, the customer needs to specify their charging needs. What is the relationship between Fl and F2?
a)
Validate
b)
Derive
c)
Depends
d)
Satisfy
44.
287. A business analyst (BA) is facilitating a meeting between process owners to capture the business rules for a workflow solution. One of the attendees expresses a strong opinion that the solution will not deliver the expected value. How will the BA ensure the process owner remains engaged and will support the change?
a)
Update the requirements
b)
Record the feedback and continue
c)
Review the future state
d)
Change the governance approach
45.
288. A project's change in scope is assessed and a newly assigned business analyst (BA) is unsure how to communicate the findings and final decision to the wider stakeholder group. In which of the following can the BA find this information?
a)
Stakeholder Communications Plan
b)
Business case
c)
Business policies
d)
Governance approach
46.
289. A local manufacturer that serves about 1000 retail stores is experiencing a slow yet steady decrease of its customer base over the last couple of years. Attributing the situation to increased competition, management has hired a team of sales representatives to attract new clients and promote the manufacturer's products. However, after four months there is still no progress. Management has engaged a business analyst (BA) to investigate this issue. What should the BA do first?
a)
Perform market research to identify on which competitive advantages the sales team should focus
b)
Create a training program to close potential skill gaps for the sales team
c)
Review historic sales and related data to understand what is happening to the customer base
d)
Identify appropriate training providers and send out a request for proposal
47.
290. A new project has to implement a cyber security release in China, Italy, Germany, the United States, and Canada. The project is a $5 million initiative and must 'go live' in production in all countries on the same day and time to be effective. Which of the approaches mentioned is suitable for this project based on the size and complexity?
a)
An agile and iterative approach
b)
A waterfall and dynamic approach
c)
A kanban and predictive approach
d)
A proven and tailored analysis approach
48.
292. A business analyst (BA) is assessing the completeness and coherence of the requirements. The BA has considered a variety of viewpoints and has a collection of views. What has the BA constructed?
a)
Requirements architecture
b)
Requirements traceability matrix
c)
Business knowledge model
d)
Solution design
49.
293. A business analyst (BA) plans to hold a workshop next week to elicit requirements for a project. In an informal conversation, another employee mentioned that one of the attendees is likely to be unhappy about the project's impact on their work. Which of the following techniques will the BA use to avoid disrupting the workshop?
a)
Elicitation Activity Plan
b)
Collaborative Games
c)
Stakeholder List
d)
Risk Analysis and Management
50.
294. A business analyst (BA) at a regional bank has recently been assigned to assist on a project to expand into new markets. The chief executive officer (CEO) envisions the bank as a national brand and has asked the chief financial officer (CFO) to monitor project progress closely. The project manager (PM) has asked the BAs on the team to recommend an appropriate business analysis approach. Based on the nature of the project and the industry, which approach should they recommend?
a)
An unstructured approach utilizing informal team interaction, model-driven documentation standards, and iterative requirements development
b)
An agile approach with frequent team interaction, adaptive documentation standards, and iterative requirements development
c)
A moderate approach utilizing the bank's existing waterfall project lifecycle and documentation deliverables not requiring formal approval
d)
A formal approach with planned team interaction, agreed upon documentation deliverables requiring formal approval, and front-loaded requirements development
51.
295. While reviewing a subset of requirements with stakeholders, a business analyst (BA) finds a requirement that does not deliver benefit to any of the stakeholders. After much discussion, the stakeholders decide that the requirement does not align with the solution scope. What recommendation will the BA make?
a)
Update the solution design
b)
Re-evaluate the future state
c)
Change the solution scope
d)
Eliminate the requirement
52.
296. An innovative pizza restaurant announces a new pizza topping each week. Once advertised, the new topping on the regular dough constitutes the sole pizza type offered during the week. No other pizza toppings are offered. Which of the following processes is a strong candidate to be addressed while planning for requirements reuse?
a)
Dough preparation
b)
Toppings preparation
c)
Topping recipes
d)
Ad images
53.
298. A business analyst (BA) in a large financial institution, responsible for the management of requirements, has completed all the activities related to tracing requirements and is now pursuing to maintain them. The BA has identified a large number of requirements which have long term reuse and is now looking for guidance to manage these requirements. Which of the following will indicate how requirements will be managed for reuse?
a)
Legal Regulatory Information
b)
Architectural Repositories
c)
Information Management Approach
d)
Business Rules Analysis
54.
299. A business analyst (BA) is in the process of allocating requirements to various releases of a solution. On what should the BA base requirements to maximize the value of the solution?
a)
Priority set by stakeholders
b)
Available resources
c)
Timing of the release and its impact on business
d)
Components in scope for that release
55.
303. A large company has thousands of geographically dispersed employees and dozens of IT systems. Multiple business analysts (BAs) work in parallel on various requirements with different stakeholders. When considered in isolation, the requirements look meaningful and valuable to those who approved them. However, when it comes to implementation, some of the requirements appear to be contradicting each other. A lead BA recognizes that adding some traceability information would help uncover such conflicts early in the process. To what should the BA trace the requirements?
a)
Stakeholder tasks
b)
Business needs
c)
Organizational functions
d)
Solution components
56.
304. A multi-domain project has stakeholders with different technical backgrounds. The presentation prepared by the business analyst (BA) for domain 1 was also used for domain 2 but the presentation was not clear and caused concerns for stakeholders in domain 2. What can the BA do to alleviate the concerns of the stakeholders in domain 2?
a)
Create a survey applicable for the stakeholders in domain 2.
b)
Produce an estimation applicable for the stakeholders in domain 2.
c)
Present a model applicable for the stakeholders in domain 2.
d)
Develop a backlog applicable for the stakeholders in domain 2.
57.
305. The objective of a solution implemented was to increase the number of customer calls resolved per hour. When using basic statistical sampling concepts, what does the business analyst (BA) need to consider?
a)
Metrics and Key Performance Indicators (KPIs)
b)
Frequency and Timing
c)
Financial Analysis
d)
Benchmarking and Market Analysis
58.
307. The performance of the business analysis team has been reviewed by management to determine areas for improvement. The manager would like to help the business analysts (BAs) develop their skills and address the corrective actions. What is a technique that may help achieve this goal?
a)
Lessons learned
b)
Team restructure
c)
Weekly meetings
d)
Team building
59.
308. A business analyst (BA) worked with two stakeholders to finalize the access rights related requirements for an internal software application. According to the first stakeholder “Comments, once entered in the application, should be stored for 365 days and should not allow the users to delete”. According to the second stakeholder, “The users with super administrator privileges should be able to add/delete/modify every page/section in the entire application.” Which characteristic does this pair of requirements fail to meet?
a)
Concise
b)
Consistent
c)
Complete
d)
Complex
60.
309. A card printing solution is comprised of 4 stages: Loading, Printing, Packaging and Sorting. Loading and sorting of cards is done manually through operators, while printing and packaging are automated. The loading stage requires the operator to load 100 cards after an alarm is raised. Sorting requires an operator to distribute each package based on the printed address into the appropriate delivery box. Which stage should be assessed as the most likely to increase process inefficiencies?
a)
Loading
b)
Packaging
c)
Sorting
d)
Printing
61.
310. A large health care provider has recently purchased and installed a solution that automates some of the activities that coordinate patient recovery activities. A business analyst (BA) is in the process of evaluating this solution and analyzing the performance measures against the value it brings. At this juncture, the BA has uncovered some threats in the solution which could hamper its performance and erode the value it brings. Which technique will enable the BA to record and handle these on an ongoing basis?
a)
Risk Analysis and Management
b)
Root Cause Analysis
c)
Solution Performance Analysis
d)
Solution Scope
62.
314. In a software implementation project, the designated business analyst (BA) has conducted all the elicitation activities and now needs to confirm the elicitation results. What is used by the BA Professional to guide which sources of information and which results are to be compared?
a)
Information management approach
b)
Business analysis plan
c)
Elicitation activity plan
d)
Business analysis approach
63.
315. A big construction company has grown into a group of 17 companies spread across the country. The rationale behind forming the group was to become more competitive in bidding for federal and regional government contracts. Another reason was to increase consolidated profitability by lowering the cost of materials and using combined assets more efficiently. Disjointed technological capabilities of the individual companies impede gathering the data needed to make decisions on both handling materials and allocating the resources. What improvement opportunity does this represent?
a)
Create a business model canvas to outline business needs
b)
Deploy a new system across the companies
c)
Enhance access to the relevant information
d)
Develop a repository of information from each company
64.
A is a Technique, B is an Objective, C is an Opportunity, D is a Task Increase Efficiencies: automate or simplify the work people perform by reengineering or sharing processes, changing responsibilities, or outsourcing. Automation may also increase consistency of behaviour, reducing the likelihood of different stakeholders performing the same function in distinctly different fashions. Improve Access to Information: provide greater amounts of information to staff who interface directly or indirectly with customers, thereby reducing the need for specialists. Identify Additional Capabilities: highlight capabilities that have the potential to provide future value and can be supported by the solution. These capabilities may not necessarily be of immediate value to the organization (for example, a software application with features the organization anticipates using in the future) 316. A software company has won a contract to implement its product for a client. As part of the implementation work, a business analyst (BA) is asked to compile information about the other client applications that will integrate with the new system and provide the information graphically. To establish the boundaries of the new system, the business leaders need to know the interfacing client applications and the type of information that will be exchanged between the existing and new systems. Which type of diagram should the BA use?
a)
Process
b)
Sequence
c)
Activity
d)
Context
65.
317. Contracts are currently managed by more than 20 contract owners across the organization, each happily managing in their own way. A business analyst (BA) is tasked to elicit requirements for centrally managing software maintenance and license contracts. Which of the following does the BA need to carry out first?
a)
Identify business requirements
b)
Identify future state conditions
c)
Recommend an off the shelf product
d)
Complete an enterprise readiness assessment
66.
318. An online stock trading system is under implementation. Which of the following events can be considered as a trigger for re-prioritization?
a)
A team member has left the project and is being replaced
b)
A new initial public offering in the stock market is introduced
c)
Further dependencies among solution components are uncovered
d)
Number of reported quality defects is growing through phases
67.
320. Whilst working on business requirements to improve a process, a business analyst (BA) has created flowcharts from the viewpoint of several different users. The stakeholders have expressed some confusion because the flows seem inconsistent. What ensures that the process models relate to each other?
a)
Roles and Permissions Matrix
b)
Organizational Model
c)
Future State Description
d)
Information Architecture
68.
322. A business analyst (BA) is defining the decision making process for changes raised during a project and wants to understand the decision making authorities within the company. What might the BA do to gather this information?
a)
Market analysis
b)
Focus group
c)
Survey
d)
Cost benefit analysis
69.
324. A business analyst (BA) facilitated elicitation activities with subject matter experts and end users using observation, workshops, and interviews. After comparing the results, how should the BA resolve the variations?
a)
Identify a few key stakeholders to resolve the conflicts
b)
Set up additional activities to collaboratively resolve the issues
c)
Remove requirements that cause differences
d)
Weight the results from the observation because it is more reliable
70.
327. A business analyst (BA) has been coordinating several meetings with stakeholders to reach consensus regarding the solution design to implement a global currency exchange system for an international bank. Consensus has not been reached yet, although BA has great communication skills and is trusted by all stakeholders. The stakeholders formally approved the business need initially. Why is there disagreement?
a)
The requirements are interpreted differently by each stakeholder.
b)
The requirements are incorrectly traced.
c)
The approval authority for the solution is unclear.
d)
More solution alternatives need to be generated.
71.
329. A business analyst (BA) has engaged various groups from across the organization to define the business opportunity a potential project will address. The BA must consolidate the information collected from the groups. The BA should ensure the business needs __________.
a)
are traceable to their source stakeholders.
b)
are articulated from the enterprise perspective.
c)
describe the potential solutions that they will satisfy.
d)
have minimal risk associated with them.
72.
330. In a requirements elicitation effort, the business analyst (BA) needs to define boundaries for business domains, categorize and create a hierarchy of items, and show data sources and their relationships for specific audiences. Which of the following modeling formats should the BA use?
a)
Diagrams
b)
Graphics
c)
Matrices
d)
Prototype
73.
332. During a prioritization meeting, a business analyst (BA) mentioned that the access management system requirements are not stable. The project manager and a team lead proposed removing the requirements from discussion. A domain subject matter expert (SME) insisted on making that requirement a high priority, because it is really important from their point of view. What should the BA do?
a)
Make the requirement a lower priority to minimize unanticipated rework and wasted effort
b)
Set the requirements at a high priority to adhere to the SME's point of view
c)
Remove the requirement from the project
d)
Leave priority unfilled for these requirements
74.
333. A company has a process improvement initiative that is projected to increase revenue by $150,000 USD non-compounded per year. The budgeted cost of the initiative is $200.000 and supporting the initiative will cost $30.000 for years two and three. What is the projected return on investment over the first 3 years?
a)
44%
b)
73%
c)
40%
d)
51%
75.
334. A business analyst (BA) is reviewing the performance results from a recent change initiative. One of the results stated, "The planned schedule expected 50% of the project to be done at milestone 6. The schedule performance index (SPI) was .87. Three project team members worked overtime to ensure that the actual schedule would align with the planned schedule." This is an example of what type of action?
a)
Engagement
b)
Preventive
c)
Corrective
d)
Improvement
76.
336. A global organization is implementing a new Knowledge Management System and communication to the different regions has been informal. The approach is to convert the few remaining regions iteratively. The team has experienced variances at this point but feels confident in these final conversions. How should the business analyst (BA) communicate the information?
a)
Repository
b)
Document management
c)
Email
d)
Individual collaboration
77.
342. A business analyst (BA) is planning for an upcoming solution based on a signed contract with a client but has learned that one of the key subject matter experts is unavailable during the first half of the business analysis phase. The project has a tight timeline and firm deadline that is part of the contract. There are no substitutes for the key subject matter expert. How should the BA proceed?
a)
Change the solution scope by removing the subject matter expert's component and obtain approval on the new scope
b)
Reduce the schedule to coincide with the subject matter expert's availability and reduce the formality for requirements
c)
Document the contract terms as a risk and adjust the contract costs to plan for the changes/rework
d)
Identify the missing stakeholder as a risk and recommend an adaptive approach for the analysis phase
78.
343. The business analyst (BA) is preparing to determine the impact of various risks associated with the business analysis effort currently underway. Which of the following would the BA use as an input into the assessment of risk?
a)
Defined change strategy
b)
Analysis of potential value of the recommended solution
c)
List of prioritized requirements
d)
Unconfirmed results of elicitation activities
79.
344. A project is implemented using a predictive approach. Unfortunately, a lot of change requests (CR) have been raised. A project manager (PM), who should approve each change request, is overworked. What could the business analyst (BA) propose to make things better?
a)
Approve the CRs independently for the PM
b)
Transfer responsibility from the PM to a project's sponsor
c)
Revisit the Business Analysis Governance approach
d)
Decline CRs because of the approach
80.
346. A business analyst (BA) wants to estimate the potential value delivered by a set of requirements and design options by targeting a small group of stakeholders to understand their perceived value and expectations. The BA is going to organize a discussion during which feedback is collected. Which technique will be used?
a)
Focus Group
b)
Brainstorming
c)
Survey
d)
Group interview
81.
347. A business analyst (BA) has just completed a number of elicitation activities and is preparing to review the stated requirements. As part of this, the BA is checking the compliance of the stated requirements with organizational standards for business analysis. What state is the BA attempting to move the requirements into?
a)
Validated
b)
Verified
c)
Accepted
d)
Specified
82.
350. The business analyst (BA) is assigned a small project, requiring minor enhancements to an existing system. The BA will meet with the business sponsor and developer next week to gather information about the change. What should the BA review before the meeting?
a)
Minutes from the last steering committee meeting
b)
Organizational structure of the impacted department
c)
Functional design specification of the existing system
d)
Current list of funded initiatives for the current year
83.
351. After the new report "Customer Sales by Date" was deployed last week, the sales team is now unable to generate the previously existing report "Consolidated Sales by Customer" which is causing customer dissatisfaction. What could the business analyst (BA) have assessed to prevent this situation?
a)
Current state and stakeholder needs
b)
Solution assessment results
c)
Strengths, weaknesses, and threats
d)
Balanced scorecard
84.
352. As part of identifying an enterprise's capability to adopt a potential solution, a business analyst (BA) is reviewing existing processes and tools within the enterprise for their ability to adapt to a new solution. Which of the following assessments is the BA performing?
a)
Stakeholder
b)
Enterprise
c)
Organizational
d)
Operational
85.
354. A leading software manufacturing company has appointed a business analyst (BA) to ensure that requirements are managed effectively and efficiently. The BA discovered some missing functionality as well as some implemented functionality which are not supported by requirements. Which of the following tasks did the BA use to discover the issues?
a)
Define requirements architecture
b)
Elicit requirements again
c)
Evaluate requirement changes
d)
Trace requirements
86.
356. A solution implemented three months ago has decreased performance as the volume of transactions has increased. A business analyst (BA) is tasked with analyzing the performance of the application and providing recommendations. What actions does the BA need to take?
a)
Develop new performance metrics
b)
Complete a decision analysis
c)
Perform a root cause analysis
d)
Re-analyze the current performance metrics
87.
357. A business analyst (BA) is running a workshop with a group of stakeholders to understand the requirements for a change that the company is planning to implement. What important factor does the BA need to understand to ensure the workshop remains focused on the topic in question?
a)
Future state
b)
Assets
c)
Scope
d)
Risk register
88.
358. A business analyst (BA) elicits requirements for the sales order processing of multiple product lines. Elicitation reveals that the business processes for the sales orders of most products follow similar activity patterns that have been established over a number of years. Some of the new proposed seasonal products, however, will necessitate major variations in the process flow of some departments. The seasonal products are likely to be different every year. The business needs to carefully adapt its business practices so that the significant but seasonal variations in some of the business processes for the new products are handled adequately without disrupting the processes for the other established products. Which of the following approaches must the BA take to manage the requirements for sales order processing in the long term?
a)
Reference specific departments in the requirements for the seasonal products
b)
Reference specific departments in the requirements for the established products
c)
Use a high level of abstraction for the seasonal products to make them less subject to revision during a change
d)
Use a high level of abstraction for the established products to make them less subject to revision during a change
89.
361. A business analyst (BA) works for an organization that is moving from a waterfall methodology to an agile approach. This causes new challenges and opportunities for the BA. Which business analysis planning and monitoring element is most impacted by the organization's change?
a)
Timing of business analysis work
b)
Conflict and issue management
c)
Technology and infrastructure
d)
Solution scope
90.
362. The technology team at a financial institution has successfully constructed a software application to be deployed as part of a digital banking strategy. A business analyst (BA) has completed a review of the current state description and now needs to evaluate the solution and determine limiting factors for value realization. What additional input is required to perform the assessment of enterprise limitations?
a)
Operational assessment
b)
Potential value
c)
Solution performance analysis
d)
Organizational structure
91.
363. A company that specialized in manufacturing vending machines for books has been in business for 10 years. As the e-book and online retailing grow, the company perceived that a change is required to respond to the new emerging market forces. However, the change should focus on reusability as much as possible to reduce expenses. After analyzing the current state with the business subject matter experts, the business analyst (BA) proposed investing in a new business line of vending machines that sell pay per use mobile device phone fast charging stations. Due to the urgency of this change, the BA was asked to finalize requirements elicitation in the shortest possible time. By proposing this change, what type of view did the BA use to analyze the current manufacturer's state?
a)
Data-centric
b)
Capability-centric
c)
Process-centric
d)
People-centric
92.
367. What did the BA create to ensure that everyone who needed to be included had been?
a)
Onion diagram
b)
Concept model
c)
Capability diagram
d)
Context model
93.
368. As the new pricing structure was being implemented, the chief executive officer (CEO) of the company wanted to change the premiums and associated discounts offered to customers. The BA investigated the cost, anticipated benefits and the length of time the change would likely take to complete before presenting the results back to the CEO. What type of analysis has the BA just conducted?
a)
Impact
b)
Capability
c)
Market
d)
Document
94.
370. Nếu giảm tỉ lệ verification reject xuống 50% thì tỉ lệ thành công cho mortgage origination là bao nhiêu? If an additional recommendation to reduce Verification Rejects by 50% were to be introduced into the mortgage origination process, what is the potential success rate of the mortgage origination process?
a)
86%
b)
83%
c)
70%
d)
74%
95.
371. Which of the following business processes can be identified for the process improvement initiative?
a)
Mortgage payment process
b)
Mortgage origination process
c)
Mortgage closure process
d)
Collateral verification process
96.
372. Assuming the BA's recommendation to be true, what will be the new success rate of the mortgage closure process?
a)
90%
b)
85%
c)
10%
d)
20%
97.
373. A popular department store chain wants to make computer upgrades as well as conduct a major remodeling effort to increase revenue to all their 100 stores over the next 2 years. The remodeling will occur in two phases. The two phases are required at each store and can be completed in any order, but each phase must be fully completed before the next phase can begin. Phase 1 will take approximately 32 weeks and will not require a store to be temporarily closed. Phase 2 will take approximately 20 weeks and will require a store to be temporarily closed .In order to keep inventory level and total revenue for the department store chain at an operational level, 75% of the stores must remain open to the public at all times. Against the board of director's advice, the Chief Executive Officer (CEO) made a decision to start and complete the top 25 revenue-producing stores in the first year to get those stores remodeled and fully operational. A business analyst (BA) has been brought in to help with planning the project and gathering requirements. What activity should the BA do to determine which stores will be the first to start the renovations?
a)
Perform document analysis for stores annual records
b)
Survey store managers for number of customers per day
c)
Conduct a focus group with store managers to determine which should be first
d)
Brainstorm with store managers on the current state of each store
98.
374. A business analyst (BA) has been brought in to help with planning the project and gathering requirements. Based on the CEO's executive decision, which risk tolerance attitude is the CEO exhibiting?
a)
Seeking
b)
Avoidance
c)
Mitigation
d)
Neutrality
99.
375. A business analyst (BA) has been brought in to help with planning the project and gathering requirements. What tool will help the BA understand the changes needed to keep the majority of the stores open?
a)
Capability Model
b)
Business capability analysis
c)
Transition State Diagram
d)
Stakeholder Matrix
100.
376. A business unit of a transnational manufacturer wants to implement a robust process for addressing integrity-critical equipment deterioration incidents. Timely and complete resolution of such incidents is vital for the business unit's continuous safe and profitable operation. Treating each incident involves many employees from different departments extensively collaborating and exchanging information. That information is spread across multiple systems having their access limited to particular user groups. With the current manual process, some incidents get forgotten and remain unresolved for years. The project's Sponsor is an Equipment Integrity and Reliability Advisor, who moved into this position from another business unit. That business unit implemented a proprietary application to integrate the information and to assist in tracking and managing the incidents. Having a positive experience with the application, the Sponsor is suggesting to customize it and reuse in the new business unit. The business unit's Enterprise Architect (EA), who is responsible for assessing solution options and presenting them to executive decision makers, has a few concerns with adopting the existing application. The application uses point-to-point interfaces with other data sources whereas the business unit's target architecture relies on a data warehouse-based integration. Moreover, the two business units use different legacy systems, as well as different front-end implementation technologies. Additionally, the existing application is monolingual, while the business unit needs user interfaces and some data to be presented in two languages. With all of this, it may be easier to build a new application from scratch than to customize the existing one. To understand which option is better, the EA asks a business analyst (BA) to define business requirements. Through the elicitation process, the BA identifies the following requirement: "Particular incident-related activities require approval by authorized personnel before beginning them, as well as confirmation of acceptance of their completion." What kind of asset should the BA provide to fully specify the approval requirement?
a)
A process diagram
b)
A RACI matrix
c)
A use case model
d)
A business rule
101.
377. With the team ready to consider design options, they are reviewing the following requirement: "Appropriate stakeholders shall be timely and reliably notified on incident-related events." What quality criteria does this requirement fail to satisfy?
a)
Consistent
b)
Complete
c)
Atomic
d)
Understandable
102.
380. Which of the following characteristics is violated by requirement 5?
a)
Feasible
b)
Concise
c)
Consistent
d)
Atomic
103.
381. Which of the following relationship types correctly identifies the nature of the relationship between the 3 business capabilities and the 11 requirements?
a)
Derives
b)
Depends
c)
Validates
d)
Verifies
104.
382. Which primary subscriber business need is addressed with the enhancements?
a)
Inability of a service provider to locate other participating service providers and their fee information
b)
Inability of a plan subscriber to get directions to nearby participating service providers
c)
Inability of a plan subscriber to locate and access fee information for nearby participating service providers
d)
Inability of a service provider to be alerted of the location of new plan subscribers in their vicinity
105.
431 What is the appropriate model type to assist the stakeholders in testing the performance and visual aspects of requirements 3 through 11?
a)
Functional Prototype
b)
Concept Model
c)
Process Model
d)
Usability Prototype
106.
432. Which of the following is the appropriate technique to define communication flows between the Postal Code validation system with other systems?
a)
Capability Analysis
b)
Interface Analysis
c)
Process Analysis
d)
Decision Analysis
107.
433. What kind of relationship is used to describe the traceability between requirement 8 and the solution artifacts that implement it?
a)
Validate
b)
Depends
c)
Derive
d)
Satisfy
108.
383. A national branch of a global company is struggling to improve business processes of its Public and Government Affairs (PGA) department. To work with external stakeholders effectively, PGA employees need to collect, manage, and exchange a vast amount of information. Complex cases involve collaboration of many employees from different departments. The ability to share information and to coordinate corresponding activities is crucial for the company's growth plans. Their current tools and practices do not serve the purpose well. The existing system, which was deployed a couple of years ago, has only a few active users. The majority of PGA employees avoid using it because the system is hard to use and lacks needed functionality. Consequently, available information is mostly unstructured and stored either locally or on a shared network drive. Some of the information exists only in a paper form. The branch's PGA head, who sponsors the project, wants to implement a configurable solution that two other branches successfully deployed several months ago. Both deployments were done by three solution consultants, who will be available to assist in the project. They will be responsible for tailoring the solution to PGA needs, as well as for training the PGA staff. With their help, the sponsor plans to complete the project in approximately three months. The solution consultants reside in another country 7 hours ahead of the rest of the project team. They will be available part-time, but are planning two one-week long trips to the PGA central office to conduct initial training and to participate in the final deployment of the system into production. The consultants, in turn, expect a business analyst (BA) to assist in collecting necessary data and defining customization requirements. The solution consultants have composed a spreadsheet with all requirements that are already implemented in the solution. The requirements in the catalog are organized partially by user tasks and partially by system features. The branch has distinct definitions of PGA user roles and uses a different approach to structuring requirements specifications. How should the BA organize the customization requirements?
a)
Devise a structure that best fits the branch's definition of user roles
b)
Explore and apply best practices for specifying this type of requirements
c)
Reuse the structure of the solution consultants' requirements catalog
d)
Use the structure of requirements suggested by the corporate standard
109.
384. A BA suggests interviewing employees to elicit user requirements and then performing a gap analysis to identify solution customization requirements. However, the sponsor believes that it will be a waste of time because the employees do not know how the process should work in the future. The sponsor expects the solution to help shape their process and wants to start with the solution as is, amending it as necessary based on the user feedback. What should the BA do?
a)
Deploy the current solution and survey users for improvement proposals.
b)
Utilize the solution in a test environment with actual data to elicit feedback.
c)
Collect the requirements from the sponsor and domain subject matter experts.
d)
Explain the benefits of interviews to the requirements elicitation process.
110.
385. What should define the timing of business analysis work in this project?
a)
Buy-in of the proposed solution
b)
Approach used by the previous deployments
c)
Availability of solution consultants
d)
Overall project schedule
111.
386. The solution consultants have composed a set of as-is solution documents. A spreadsheet contains a catalog of brief definitions of all requirements with priorities assigned to them. A separate document explains data models and user interfaces. For the new and changed requirements, the BA wants to capture additional attributes such as the source, reason, complexity, and priority of change. Some of these requirements can be reused in other work. How should information for these requirements be managed?
a)
Rewrite requirements independent of the solution design
b)
Enter the information in the company's change management system
c)
Add the attributes to the original requirements catalog and change requirements
d)
Create a new workbook of requirements with necessary attributes
112.
387. A business analyst (BA) is working on a payment system (PS) implementation. A set of systems which should interact with a new system has been identified. The business analyst defined that a user with role of "Supervisor" in the PS must pass a two-factor authentication before an execution of the functions: "Change system parameters" and "Set up new supervisor." A user must have the role of "Supervisor" to use the standard functions "Send mail notification" or "Send SMS notification".The BA defined the following use cases: "¢ "Change system parameters" "¢ "Setup new supervisor" "¢ "Send mail notification" "¢ "Send SMS notification" "¢ "Send notification" "¢ "Pass a two-factor authentication" The BA wants to create a Use Case diagram. Which technique should be used to define a communications protocol between the PS and other systems?
a)
Vertical prototyping
b)
Interface analysis
c)
Concept modelling
d)
System analysis
113.
388. Which standard relationship should be defined between "Setup new supervisor" and "Send notification"? 389. What standard relationship should be defined between "Change system parameters", "Setup new supervisor" and "Pass a two-factor authentication"? 390. A software development company is in the process of creating a new product for their customer base. It has been several years since such a project has been initiated and the organization has created a new team to own and develop the product. The project team will be evaluated by the successful adoption of the product, which will be developed over the next 12 months. The team's business analyst (BA) has analyzed the current state in partnership with the product owner and has been meeting with senior management to identify the goals that need to be attained. A broad view of the business has been analyzed in order to have an understanding of how the company is currently providing value to its customer base. After the BA completed the initial analysis, the information is reviewed with leadership. At this point in the project, what will the BA be presenting?
a)
Project timeline
b)
Project deliverables
c)
Resource staffing
d)
Expected benefits
114.
391. What has the BA been identifying that will be used to evaluate the solution?
a)
Business Needs
b)
Solution Requirements
c)
Success Measures
d)
Solution Limitations
115.
392. What has the BA evaluated to help determine value of the project?
a)
Internal assets
b)
External influencers
c)
Change strategy
d)
Business architecture
116.
393. A major manufacturer of popular beverages has appointed a local distributor to serve a specific territory. The demand for the beverages has a pronounced seasonal pattern. The distributor performs well overall, but is repeatedly unable to keep up with fulfilling many customer orders during peak demand periods. The distributor's current delivery capability is stretched to deliver 60 tons of merchandise per day whereas the season's peak demand periods need a daily delivery capability of up to 100 tons. The distributor is under pressure to fully meet the year-round market demand in order to stay in business. The distributor's management wants to identify and consider more cost-effective options as resorting to adding more trucks and drivers would not be economically feasible. A business analyst (BA) has spent several days observing and measuring the warehouse activities to understand the situation and to gain insights into possible solutions. The delivery workflow is a four-step process: (1) picking the orders and assembling them on trays, (2) bringing the trays to the loading bay, (3) loading the orders into trucks, and (4) delivering the orders to customers. As the following table illustrates, overall performance depends is dependent on five major resources: (1) the workers who pick the orders and load them into trucks, (2) the tallyers who check the orders, (3) the drivers, (4) the trucks, and (5) eight loading bays (LBs). What is the company's primary business objective in this scenario?
a)
Make more profit
b)
Defeat competitors
c)
Satisfy the customer
d)
Stabilize its performance
117.
394. If the driver's average throughput is 0.6 tons/hour, how many hours per day would 15 drivers have to work to deliver 100 tons of merchandise?
a)
12
b)
9
c)
10
d)
11
118.
395. Each truck can only make two trips a day. The BA has noticed that only 30% of trips have their orders available for loading when a truck arrives. Otherwise the truck has to wait one extra hour until the orders are picked and brought to the loading bay. If trucks are the only constraint, approximately how many hours are lost due to this downtime?
a)
18 hours
b)
20 hours
c)
15 hours
d)
17 hours
119.
397. Company A is a nation-wide leader in commercial demolition. Having just celebrated its 100th year of operations, the company decided to begin doing work internationally. The current system used for reporting company finances is unable to keep pace with the potential demands of doing work in geographically dispersed locations. Therefore, the company decided to replace its client-based Profit & Loss (P&L) reporting system with a more robust, web-based system. This will ensure transparency across the organization and enable better decision making. The business analyst (BA) at Company A has recently completed several rounds of elicitation to determine the requirements for the new, web-based system. Over 1250 requirements were elicited. An initial Requirements Traceability Matrix (RTM) has been drafted, and a subset of the RTM can be seen below: While verifying the requirements, the BA notices that Requirement ID NFO0003 does not meet the "unambiguous" or the "testable" characteristics of requirements quality. The BA plans to re-write the requirement. Which of the following requirements is both unambiguous and testable?
a)
"The solution shall employ a blue background."
b)
"The solution shall employ a background color blue (HEX #0000FF)."
c)
"The solution shall employ a high-contrast between background and text."
d)
"The solution shall employ a background color that is viewable to a colored-blind user."
120.
398. The risk associated with Requirement ID F-P0001 is HIGH. The BA has gone back to the Crew Chief to determine why this requirement's risk is HIGH. The Crew Chief stated that it was based on an assumption. Which of the following assumptions would make this requirement's risk high?
a)
The users will require specialized training.
b)
The web-based interface will be complex.
c)
The system will be inaccessible in remote locations.
d)
The cost of the solution outweighs its benefit.
121.
399. The BA will create a Data Model to meet which requirement?
a)
Requirement ID F-R0002
b)
Requirement ID FE10001
c)
Requirement ID NFP0002
d)
Requirement ID F-R0003
122.
400. The BA is working on identifying additional improvement opportunities based on these requirements. Which of the following improvement opportunities is reflected in Requirement ID NFP0002?
a)
Additional capability
b)
Increased efficiency
c)
Defined relationship to information
d)
Improved access to information
123.
401. A business analyst (BA) working on a recently implemented project is approached by the sponsor to provide artifacts that can be used organization-wide for the long-term. Which of the following should the BA provide?
a)
High-level business requirements document
b)
Transition requirements document
c)
Process models
d)
Project solution architecture
124.
403. The BA is working on the design options for the future state at the martial arts organization. There are several design elements that need to be considered for the future state. Which of the following design elements does the Activity Diagram address?
a)
Business processes to be performed and managed
b)
Business policies and business rules
c)
People who operate and maintain the solution
d)
Operational business decisions to be made
125.
404. The BA is analyzing the requirements that are represented in the Class Diagram. In addition to the diagram, the BA would like to include a separate document that has the information about the data elements to ensure a common understanding of the classes' attributes. What is used to define the data elements?
a)
Data Dictionary
b)
Data Mining
c)
Glossary
d)
Reviews
126.
406. The performance of a newly implemented document management system is falling significantly short of the measures defined as part of the project. However, the business is recognizing some level of value from the system. The business analyst (BA) considers the only option available to the company to increase performance and determines that the cost of implementing the option is ten times higher than the expected benefits. What should the BA recommend?
a)
Plan stakeholder engagement
b)
Retire the implemented solution
c)
Conduct elicitation
d)
Continue with the implemented solution
127.
407. A very large insurer of General Liability and Property Damage insurance has an upward trend of increased claims over the past 5 years. The Risk Control Area for that company has just completed a 12 month Pilot of a new improved Risk Control Site. The purpose of the site is to help their customers manage their exposures and ideally prevent them from having claims. There were 100 customers that were part of the Pilot that represented 25 different industries. The business goals were to increase use of the site and provide tools to help customer awareness of their exposures, so that they may reduce existing exposures and ultimately reduce claims. The sites Features were as follows: Improvements to the search engine to all customers to search for articles, tools and services on the site. A checklist function that allow customer to create their own unique Checklists or utilize a sample provided by ABC company to use daily, weekly etc for an area of their facility. A promotion feature "" where Risk preventing Articles, and tools on the site are marketed toward a customer. A profile section allowing for Customer Name, Address and contact Phone number. After the 12 months pilot, the business sponsor received an assessment of what was working and what was not. The Assessment of the pilot revealed overall site activity had significantly increased, however only 5% of the time the promotions were viewed. And the most shocking was that total claims increased by nearly 20% for these 100 customers during the pilot period. The business sponsor was perplexed as he had an expectation of reduced claims and at least for 30% viewing of promotions since the project team had spend a lot of careful time and effort on this feature. A BA was assigned to do further analysis regarding the low use of the promotions and why claims were not being reduced. Regarding the use of promotion the BA looked into other similar companies to see what they did differently to get their customer to look at their promotions. The BA found that similar companies had promotions that targeted the industry the customer was in so it was more relevant to them and they were more interested to view the promotion. In addition the BA sent out survey to all 100 pilot customers asking probing questions about what they thought of the site and if they felt it had decreased their exposure to risk sufficiently. The Survey responses came back with raving positive comments and providing examples of how the site had been helping in the reduction of claims from the customer's perspective. In addition the survey also revealed insight that the customers found the promotion often irrelevant to their industry. The BA asked for a dump of all documentation of the 100 claims that were filed over the 12 month pilot period. The BA found the nearly 90% of the claim field were all in one region of the country and were all for property damage related to several severe winter storms in the region and the claims were nearly all unavoidable by the customers. The BA brought all this analysis back to the business sponsor and made the recommendation to the business sponsor to require the customer to select 1 of 25 industries in their profile. This would in turn allow for the ability to show industry specific promotions and promote search results relative to a customer's industry to be stored at the top giving the customer a more personalized experience. What type of recommendation has the BA made to the business sponsor?
a)
Identify additional capabilities
b)
Reduce complexity of interfaces
c)
Perform organizational change.
d)
Retire the solution
128.
408. What technique was the BA using to understand why the promotions were not being viewed?
a)
Use cases and scenarios
b)
Benchmarking and market analysis
c)
Observation
d)
Data mining
129.
409. What technique led the BA to the source of the increase in claims?
a)
Survey
b)
Decision modelling
c)
Data mining
d)
Document analysis
130.
410. What was the business sponsor looking to validate about the use of promotions?
a)
Performance Variance
b)
Accuracy
c)
Risks
d)
Market Trends
131.
415. What analysis approach must the BA use to determine changes required to address the training needs?
a)
Future state
b)
Decision
c)
Market
d)
Root cause
132.
416. What approach would help the BA to understand the functionality definition issues?
a)
Business Analysis Communication Plan
b)
Business Analysis Performance Assessment
c)
Risk Register
d)
Requirements Traceability Repository
133.
417. Which stakeholders would the BA interview to determine the changes needed to the comparison tool?
a)
Implementation Subject Matter Expert and Tester
b)
Project Manager and Project Sponsor
c)
Regulator and Operational Support Manager
d)
Domain Subject Matter Expert and End User
134.
419. What could the business analyst (BA) do to gain consensus between the CFO and other Management?
a)
Calculate the costs incurred by each option
b)
Recommend and present a completely new option
c)
Estimate the potential value delivered by each option
d)
Compare each option against an industry benchmark
135.
420. In order to align with the added value required from the parcel tracking solution that would be an important requirements' category for the BA to give more focus?
a)
Transition
b)
Process
c)
Stakeholder
d)
Non functional
136.
421. A non-profit utility company has 900 employees, a majority of whom are hourly employees and must track their time using a paper-based process. A few years ago the Director of Human Resources purchased a software system to eliminate the current paper-based time reporting process. No requirements specific to the utility company were defined prior to the purchase. A team was formed to implement the software. During implementation process, the team discovered the software lacked functionality and was not robust enough to support the general ledger requirements. The company stopped the effort and incurred a $500,000 USD loss on the cost of the software. This year, the Director of Finance requested that a team investigate the current paper-based time reporting process and recommend solutions. The Director of Finance feels that the Director of Human Resources must be involved as a critical stakeholder. The Director of Human Resources is still bitter about the last effort because the process "˜stopped'. During a design review meeting to discuss the future state, all stakeholders are in agreement except the Director of Human Resources. Who makes the final decision?
a)
All stakeholders must be in complete agreement
b)
The sponsor
c)
The BA
d)
Those identified in the governance approach
137.
422. During a brainstorming session on improvement opportunities, the Director of Human Resources repeatedly interrupts the group and states why the proposed ideas will not work. Which approach should the business analyst (BA) take to refocus the group?
a)
Reschedule the session without the Director of Human Resources
b)
Ask the Director of Human Resources to observe in
c)
Pause the activity and reiterate the rules to the entire group
d)
Continue the activity with the group and provide a report
138.
423. Which of the following is included in performing a stakeholder analysis?
a)
Recommend excluding the Director of Human Resources as a stakeholder
b)
Compare the expertise of the Director of Human Resources to other stakeholders
c)
Implement all of the Director of Human Resources suggestions to relieve tension
d)
Develop a risk plan to anticipate negative behavior from the Director of Human Resources
139.
424. A company with a big information technology (IT) department has hired a lead business analyst (BA) to enhance its business analysis practices. The lead BA discovers that sponsors are not satisfied with project outcomes. Developers complain about incomplete, ambiguous, and changing requirements. All stakeholders, including project managers, are blaming long cycles of analysis for the delays. The business analysts, in turn, feel overwhelmed with the number of projects and frustrated by the lack of collaboration from reviewers of their deliverables. All of the evidence is anecdotal and none of the groups could strongly substantiate their options. What should the lead BA implement to identify areas of improvement?
a)
A BA time tracking system
b)
Templates for BAs to use
c)
Workload plans of the BA
d)
Key performance measures
140.
425. What is the lead BA trying to do by analyzing the results of such measurements?
a)
Establish an equitable compensation system
b)
Identify typical missing or wasteful activities
c)
Ensure even workloads of the BA
d)
Motivate the BA to work better
141.
426. Even after dozens of reviews, some stakeholders refuse to sign off on the requirements specification documents because of a few questionable requirements. This puts the projects at risk and creates tension between the participants. What should the lead BA do first?
a)
Set limits on duration of sign-offs and the number of reviews
b)
Track approvals at the level of individual requirements
c)
Escalate the problem to the executive management
d)
Offer the stakeholders incentives to sign off documents sooner
142.
427. A large insurance company wants to buy a new claims processing system or upgrade one of its two existing systems. Each year the claims department is given a$3,5 million budget to spend. Time is of the essence since there are some regulatory changes that will be coming the following year that will require several features that currently neither one of the two claims systems currently support. There are eight stakeholders involved in this initiative. There are local to where the claim systems are managed, while five are located across the country. The business analyst (BA) struggled to get all stakeholders to agree on the desired features but ultimately got agreement on ten identified key features for the new claims systems. The BA was able to build a current state and future state process model which included all ten key features. System A processes 75% of the company's claims. It is 5 years old and the claim processors love it because it is easy to use. However it must go offline for two hours each day. The code is very modular so it does have flexibility to be modified. To upgrade system A to have all ten features it would cost %5 million. System A would be at capacity if it were to process all of the company's claims. System B processes 25% of the company's claims. It is an older mainframe system, but rarely goes offline. It could easily handle double the number of claims that system A processes. However, it has a lot of legacy code and would cost $6 million to upgrade. Both systems have some of the ten desired key features. But neither system has all ten. The cost to buy a new system would be $7 million. Below is the estimated cost for each feature in priority order. During elicitation the BA must understand the non-functional requirements. What non-functional requirements does System B support over System A?
a)
Compatibility
b)
Scalability
c)
Compliance
d)
Usability
143.
428. If the budget for the initiative was firm, what is a feasible solution to make sure the project stays within budget?
a)
Upgrade system B with the first 8 features
b)
Buy the new system with only the first 5 features
c)
Upgrade system A with the first 8 features
d)
Buy the new system with only the first 7 features
144.
429. What kind of analysis must the BA do to determine if one of the systems is better suited to be modified and upgraded?
a)
Stakeholder Analysis
b)
Decision Analysis
c)
Process Analysis
d)
Risk Analysis
145.
430. If System A is unanimously selected to be the system for upgrade but the technical lead says that System A will have to be taken offline for 3 months, what kind of strategy should the project team develop while System A is offline?
a)
Change
b)
Competitive
c)
Organizational
d)
Stakeholder
146.
434. A business analyst (BA) finds conflicting requirements gathered from several stakeholders. Aside from interviews, what additional activities can the BA use to safeguard against this happening?
a)
Item tracking and mind mapping
b)
User stories and scope modelling
c)
Reviews and workshops
d)
Brainstorming and estimation
147.
437. A corporation is experiencing poor financial performance and needs to change many aspects of its business strategy in order to become solvent again. A business analyst (BA) is conducting a feasibility analysis and analyzing resources required. The BA has identified the existing resources, the resources that need to be increased, and the required additional capabilities. What is the other dimension this analysis should indicate?
a)
The enterprise readiness agreement
b)
The new resources to be developed
c)
The new financial performance metrics
d)
The timeline for instituting the change
148.
438. After the implementation of a new financial solution, the business analyst (BA) observes that the performance of a solution does not meet the anticipated benefits detailed in the original business case. What is a technique the BA can use to understand the reason for this?
a)
Interface analysis
b)
Business capability analysis
c)
Data flow diagram
d)
Fishbone diagram
149.
440. A business analyst (BA) was developing an outline of the timing of business analysis activities with the project manager. What factors may impact the timing of the activities the BA is performing?
a)
Solution design
b)
Project manager's experience
c)
Contract terms
d)
Project sponsor interest
150.
445. After having created several prototypes of a new web-based application, a business analyst (BA) would like to meet with the organization's stakeholders to elicit their perception, ideas, and attitudes about the prototypes. Which of the following techniques should the BA use?
a)
Focus Groups
b)
Prioritization
c)
Decision Analysis
d)
Brainstorming
151.
446. A Business Analyst (BA) is tasked with presenting the requirements for an auto insurance product to domain and implementation subject matter experts (SMEs). What requirements viewpoints should be used by the BA?
a)
Logical Data Model
b)
Organization Model
c)
Scope Model
d)
Business Process Model
152.
448. A business analyst (BA) finds that the proposed solution has features used by a small group of stakeholders for business scenarios which may occur up to three times a year but require a high effort to implement. What should the BA recommend in this case?
a)
Assign it a lower priority for future release
b)
Deliver as part of the initial release
c)
Change the related business process
d)
Remove the requirement
153.
452. In a risk assessment exercise of a software implementation program, the business analyst (BA) has successfully computed the probability of occurrence (POC) and the cost of impact for each of the identified risks as follows: Which of the following will have the highest negative impact to value?
a)
System security
b)
Natural disasters
c)
Human errors
d)
Power surges
154.
453. A business analyst (BA) is tasked with developing a business analysis plan and must decide the best approach to use. Which of the following factors would drive the decision towards an adaptive approach?
a)
Requirements can effectively be defined ahead of implementation.
b)
The risk of an incorrect implementation is unacceptably high.
c)
Engaging stakeholders presents significant challenges.
d)
The organization's tolerance for uncertainty is high
155.
461. A business analyst (BA) conducts a business rules analysis exercise to identify the organizational rules constraining the project. In addition to existing regulations and contracts, what else does the BA check?
a)
Backlogs
b)
Permissions matrix
c)
Policies
d)
Business case
156.
466. A utility company found that its current billing system charges customers for their usage, but does so incorrectly when the system estimates reads on meters rather than performs actual reads. Company stakeholders would like to improve this aspect of the system but are hesitant to make changes because they are otherwise pleased with the system. A business analyst (BA) has completed a current state diagram and would like to start discussions on what the future state may look like. What information can the BA determine by having a current state diagram?
a)
The strengths and weaknesses of the current system
b)
The cost/benefit measures for the new system
c)
The change management plan for implementation
d)
The needs for the future state solution
157.
470. A business analyst (BA) has recently completed a comprehensive stakeholder analysis. Next, the BA would like to consider ways in which to ensure that the stakeholders remain engaged throughout the change strategy. Some of the considerations include timing and frequency, location, available tools, delivery methods, and the stakeholders' preferences. In which of the following plans would the BA document these considerations?
a)
Communications Management Plan
b)
Business Analysis Plan
c)
Stakeholder Analysis Plan
d)
Stakeholder Collaboration Plan
158.
472. Before investing further in the project, a customer and the key stakeholders of the project want to be able to visualize the final product. Which elicitation technique should the business analyst (BA) select?
a)
Interface Analysis
b)
Prototyping
c)
Observation
d)
Reverse Engineering
159.
473. A business analyst (BA) is preparing a requirement package for access management system. A state diagram for entity "User" has been prepared. The BA wants to check the completeness of requirements by comparing different models. Which diagram should be used with a state diagram to verify that all functions are defined to work with entity "User" for the different roles?
a)
Data flow diagram
b)
Sequence diagram
c)
Use case diagram
d)
Functional diagram
160.
474. Before the start of a large, cross functional change effort, the team of business analysts (BAs) assigned decided they need something to help them ensure requirements collectively support one another and do not conflict. What option would provide the consistency they are looking for?
a)
Requirements Architecture
b)
Functional decomposition
c)
Checklists
d)
Process modeling
161.
476. A business analyst (BA) is capturing the requirements for an application which displays information on a mobile device. The information will be extracted from a database owned by another department within the organization. Which of the following will identify the stakeholder who can approve access to the database?
a)
Solution Scope
b)
Governance Approach
c)
Change Strategy
d)
Requirements Architecture
162.
477. A business analyst (BA) assigned to a project has been asked to implement regulatory requirements based on priority. What type of traceability relationship can the BA use to find all the solution components that need to be implemented?
a)
Validate
b)
Satisfy
c)
Derive
d)
Dependency
163.
479. A company wants to develop a product roadmap to guide future development efforts. The product owner asks a business analyst (BA) to lead the analysis effort. Feature suggestions have been compiled from customer support calls. Which of the following should the BA do first?
a)
Determine the value of each feature
b)
Compare the implementation costs of each feature
c)
Prioritize the features in the backlog
d)
Confirm the feature requests
164.
480. A customer has provided a business analyst (BA) with many business requirements and some have inter-dependencies with other requirements. To ensure the requirements are delivered according to customer expectations, which requirements attribute should the BA consider including in the project requirements document?
a)
Priority
b)
Constraints
c)
Unique identifier
d)
Acceptance criteria
165.
483. A business analyst (BA) was tasked with eliciting requirements for a new product scheduling system. The BA interviewed and discussed the requirements with the manager and supervisor. The requirements were written and approved by both the supervisor and manager. Which stakeholders were missed in the requirements?
a)
IT support
b)
Project manager
c)
Upper management
d)
End users
166.
484. The business analyst (BA) works in a global company and the majority of stakeholders are located in different countries. The BA already explained the core requirements during the initial meetings. However, due to the time zone differences it has been cumbersome to organize further meetings. What method should the BA use so the stakeholders can review the document before final approval?
a)
Group collaboration
b)
E-mail
c)
Brainstorming
d)
Collaborative games
167.
485. An automobile manufacturer is undertaking a project intended to modify or replace the company's current timekeeping system. Negative employee reaction to change follows as word of the proposed solution spreads throughout the company. What could a business analyst (BA) do to prevent or reduce employee discontent?
a)
Relay upper management support to stakeholders
b)
Record negative employee reaction as a project risk
c)
Propose cultural changes for the organization
d)
Report potential sources of dissent to management
168.
487. A business analyst (BA) is working on improving solution performance and increasing value. The BA discovers that a set of interfaces and activities do not contribute to the final product either directly or indirectly. What should the BA recommend?
a)
Provide a single solution for stakeholders thus reducing the cost of implementation
b)
Remove or minimize interfaces and activities that do not provide value to the final product
c)
Retire the current solution as it is not fulfilling the need for which it was created
d)
Propose an organizational change to automate the work people perform
169.
488. A business analyst (BA) had identified redundancy in the process for the first contact resolution for customer issues; currently two separate divisions handle this task. A new solution identifies a single point of contact that will eliminate the redundancy. What can the BA do to highlight the required changes to the structure?
a)
Business capability analysis
b)
Current state description
c)
Organizational modelling
d)
Policies and procedures
170.
490. A business analyst (BA) is assigned to a project which has two main stakeholders: a highly regulated government agency and a less formal private company. To select the business analysis approach, the BA will conduct a meeting with representatives from each entity to decide on the level of formality needed for requirements and design specifications. During the meeting, what should the BA's strategy be?
a)
Develop consensus on a tailored approach for formality
b)
Use a formal approach to appeal to the government entity's higher authority
c)
Ask the government entity to accept a flexible collaborative approach
d)
Employ the standard business analysis level of formality
171.
491. A business analyst (BA) has defined a business analysis approach and presented the documents to the sponsors, the senior executives, the domain experts, the project manager, and the head of technology, to obtain agreement from all. At this juncture, the project manager objected to some of the estimates determined in the budget and refused to agree with the estimates. Which guideline or tool, if followed by the BA, would have helped in avoiding such disagreements?
a)
Risk Analysis and Management
b)
Business Analysis Performance Assessment
c)
Requirements Classification Schema
d)
Stakeholder Engagement Approach
172.
492. Due to the complexity of a project, the project board is concerned that the business analyst (BA) will not be able to ensure all requirements are verified. What tool can the BA present to the project board to mitigate their concern?
a)
Data model
b)
Use case diagram
c)
Business analysis checklist
d)
Risk register
173.
494. A business analyst (BA) has just finished verifying requirements for a new application that impacts various business processes for product setup, sales, and support. Which of the following methods should be used to validate the requirements with key stakeholders?
a)
Team review
b)
Joint application design
c)
Product backlog prioritization
d)
Brainstorming
174.
498. A bank moves currency from the main office to the branches daily for operational use. To avoid paying overnight interest, the branches return the currency at the end of the business day. The bank requires a new inventory management system to account for the where abouts of the cash at all times. A software provider has proposed a heavily customized version of their standard inventory management software. As the project progresses, the business analyst (BA) identifies a number of subtleties that would suggest a fully made to order solution may be a better option for the bank. What inputs does the BA need to perform the analysis?
a)
Change strategy and performance objectives
b)
Requirements and business policies
c)
Potential value and design options
d)
Needs and business analysis approach
175.
37. You are the business analyst for your organization and management has asked that you identify opportunities to improve the operations of the business. You notice that some of the stakeholders use several pieces of software and several duplicate activities within each software package to generate data reports for customers. What type of recommendation can you make in regard to this observation?
a)
You can address the automation of how the workers perform.
b)
You will need to perform active observation first to understand the processes in more detail.
c)
You can address the non-functional requirements of the activities.
d)
You will need to perform passive observation first to understand the processes in more detail.
176.
38. You are the business analyst for your organization and are beginning the requirements analysis processes. Which one of the following statements best describes the requirements analysis processes?
a)
It ensures that analysis and implementation efforts focus on the most critical requirements.
b)
It covers the definition of stakeholder requirements, which describe what a solution must be capable of doing.
c)
It defines all of the work, and only the required work, to complete the project objectives.
d)
It is conformity to requirements and a fitness for use.
177.
268. The business analyst (BA) is not having great success scheduling stakeholder meetings. Stakeholders say they are too busy or there are higher priority meetings on their calendars. The BA is concerned, knowing that stakeholder availability, attitude, and willingness to engage will impact the timeliness of project delivery as well as the. Options:
a)
Test execution.
b)
Approval process.
c)
Requirements reuse.
d)
Risk analysis process.