wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

BASIC PRA EXAM SET 3

Total questions: 100

Worksheet time: 50mins

Name
Class
Date
1.

KNX allows installers to customize installations according to individual customer requirements.

a)

True

b)

False

2.

A building owner who wants to implement KNX in a new building can consult the KNX partner database on the KNX Association website to find certified installation companies nearby.

a)

True

b)

False

3.

The KNX Association is an organization composed solely of certified training centers.

a)

True

b)

False

4.

EIB and KNX products using the same medium and the same configuration mechanisms will function together in the same installation.

a)

True

b)

False

5.

KNX can be used as a protocol to exchange Word files between computers.

a)

True

b)

False

6.

One major benefit of KNX is the ability for products from different KNX manufacturers to work together.

a)

True

b)

False

7.

Most KNX TP sensors are powered directly by the bus and do not require external power sources.

a)

True

b)

False

8.

KNX allows customers to reduce their energy consumption.

a)

True

b)

False

9.

The ETS software does not provide homeowners with complete documentation of their KNX installation.

a)

True

b)

False

10.

KNX provides standardized project design software for installers.

a)

True

b)

False

11.

An installation that contains products previously certified under EIB can be expanded with KNX-certified products.

a)

True

b)

False

12.

The KNX Association was established to merge the bus systems of LCN, LON and EIB.

a)

True

b)

False

13.

KNX can be used to manage building functions and operations.

a)

True

b)

False

14.

It is possible to download application programs of any desired manufacturer in push buttons.

a)

True

b)

False

15.

The programming button on a KNX product has to be pressed to allocate the group addresses during the commissioning stage.

a)

True

b)

False

16.

If there is a bus power failure, the application program inside the bus coupling unit will be deleted.

a)

True

b)

False

17.

Sensors and actuators can always be physically separated into a BCU and an application module.

a)

True

b)

False

18.

A bus coupling unit is the component of a KNX device of which the task is to send and receive telegrams.

a)

True

b)

False

19.

A KNX bus device that has been locked with a BCU key will no longer transmit telegrams on the bus. The BCU key has to be removed first, before the device will function normally again.

a)

True

b)

False

20.

The application program of a KNX S-mode device is made available in the form of an ETS product data entry by the manufacturer of the device.

a)

True

b)

False

21.

2 conductors of the KNX TP bus cable are required for the transmission of telegrams and 2 other conductors are required for supplying the same device with power.

a)

True

b)

False

22.

Depending on the power consumption of the application module, KNX TP devices can either be supplied solely from the bus or also from an additional power source.

a)

True

b)

False

23.

The programming button on a KNX product must be pressed in order to verify whether the individual address has been correctly assigned to a KNX device during diagnostics/troubleshooting.

a)

True

b)

False

24.

A function of a KNX sensor is to connect different KNX lines.

a)

True

b)

False

25.

In order to assign the individual address to the device one has to press the programming button on the KNX product. Since ETS6.1.1 one also has the option to download the individual address via its KNX Serial Number.

a)

True

b)

False

26.

If the polarity of the connected cable at a certain bus device is incorrect, all bus devices in that line are damaged.

a)

True

b)

False

27.

A transmitting group object can send to as many group addresses as required.

a)

True

b)

False

28.

The mask version of the actuator is transmitted in a switching telegram.

a)

True

b)

False

29.

The maximum permitted length of a line segment can be extended by lowering the data transmission rate.

a)

True

b)

False

30.

The permitted length of the bus cable between a KNX TP device and the power supply unit is between 200 m and 500 m, dependent on the supply voltage.

a)

True

b)

False

31.

Group addresses are used for controlling the programming LED.

a)

True

b)

False

32.

A dimming actuator has, per channel, at least 5 standardized group objects.

a)

True

b)

False

33.

Each group object can have a maximum of five assigned group addresses.

a)

True

b)

False

34.

It is possible to assign the group address 16/1924 to a device.

a)

True

b)

False

35.

Group objects of different size can be linked using ETS.

a)

True

b)

False

36.

The maximum permitted length of a line segment can be extended by using a more powerful power supply.

a)

True

b)

False

37.

A 4-output actuator has four individual addresses.

a)

True

b)

False

38.

The signal transmission in KNX TP is noise-free due to the symmetrical and non-earthed signal transmission whereby any interference voltage does not change the voltage difference between the bus wires.

a)

True

b)

False

39.

If a sensor group object is assigned to more than one group address, it is possible to modify the value of that group object via a second group address (not the sending group address).

a)

True

b)

False

40.

When finalizing the installation, the compliance in terms of the permitted cable lengths has to be checked.

a)

True

b)

False

41.

The conductors of the TP cable must be earthed.

a)

True

b)

False

42.

TP devices should be located in the lower section of the distribution board and conventional mains devices in the upper section so that the TP devices are not put under excessive stress due to the high heat dissipation of the 230 V devices.

a)

True

b)

False

43.

PE (Protective Earth) connectors of overvoltage protectors and power supply units may under no circumstance be connected to PE as this causes interference in the installation.

a)

True

b)

False

44.

The protective earth connection to the TP power supply unit has no function. It only serves to optionally branch off the earth conductor.

a)

True

b)

False

45.

When finalizing a TP installation, the insulation resistance of the bus cable shall be checked to have values of at least 500 kΩ.

a)

True

b)

False

46.

After having finalized the KNX project, the complete ETS Project should be handed to the client along with the project documentation.

a)

True

b)

False

47.

When finalizing the installation, a polarity check should be carried out on all bus devices.

a)

True

b)

False

48.

The standardized bus connector connects a KNX TP device with the bus. In order to avoid confusion, this connector shall however not be used for branching off cables.

a)

True

b)

False

49.

A bus overvoltage protector is a secondary lightning protection, the use of which is recommended e.g. together with line couplers.

a)

True

b)

False

50.

The protective earth connection to the TP central power supply unit is used to divert possible static charges.

a)

True

b)

False

51.

The red/black core pair is used for TP.

a)

True

b)

False

52.

Some chokes/power supply units have a reset switch by means of which it is possible to short-circuit the bus line. This will cause the connected bus devices to be reset.

a)

True

b)

False

53.

A filter table can be loaded in all coupler types, be it line -/backbone couplers or line repeaters.

a)

True

b)

False

54.

The difference between a TP line coupler and a line repeater is the housing.

a)

True

b)

False

55.

If a telegram on the main line is sent with the routing counter 0, the installation is operating without any errors.

a)

True

b)

False

56.

6 power supply units and 5 line couplers are required in a TP area with five lines and one main line, so that each line can function independently.

a)

True

b)

False

57.

A TP line coupler is connected with separate bus connectors both to the primary as well as the secondary side.

a)

True

b)

False

58.

A TP main line within an area can contain a maximum of 256 bus devices including the mounted line couplers.

a)

True

b)

False

59.

A bus power down in only one line has an effect on all the other lines when this power down lasts longer than five minutes.

a)

True

b)

False

60.

If a TP backbone coupler receives a telegram with the routing counter 0 from its primary side, it only routes it if the group address is located in its filter table.

a)

True

b)

False

61.

In an installation with a loop between lines or line segments, a telegram with routing counter 6 will circulate eternally.

a)

True

b)

False

62.

A maximum of 128 sensors, actuators, line and backbone couplers can be connected to a TP main line.

a)

True

b)

False

63.

A backbone coupler has the following individual address: x.0.0 (x is value between 1 and 15).

a)

True

b)

False

64.

The TP bus cable can be laid randomly using terminating resistors

a)

True

b)

False

65.

A KNX installation can be connected to other systems (AV system, logic controller,

Building Management System) with binary inputs and binary outputs.

a)

True

b)

False

66.

A KNX installation can be connected to other systems (AV system, logic controller,

Building Management System) with binary inputs and binary outputs.

a)

True

b)

False

67.

As much product data as necessary can be used in ETS (depending on the memory of

the hard disk)

a)

True

b)

False

68.

Project data can be transferred from one PC to another by using export and import

functions

a)

True

b)

False

69.

It is possible to trace group telegrams of a device with the source address 01.01.XXX on

the main line of area 01 as all telegrams are always routed in either direction by couplers

a)

True

b)

False

70.

The timestamp displayed in the ETS Group Monitor is the time that is included by all bus

devices in sent telegrams.

a)

True

b)

False

71.

There is no explicit “save” button in ETS. Changes to a project are constantly saved in

the background. Changes (except for bus operations like e.g. download of application

program) can only be undone by the ’Undo’ function.

a)

True

b)

False

72.

ETS projects are transferred from one PC to another by copying the file directories.

a)

True

b)

False

73.

Once a System 2 or System 7 based device has been downloaded with a BCU key

entered in the "Details" tab of the Project properties window, this key will be necessary for

any new download of the device

a)

True

b)

False

74.

ETS can only use data from one manufacturer inside one project

a)

True

b)

False

75.

The group address 33/144 is a valid group address

a)

True

b)

False

76.

A USB interface can be used for communication between the current ETS and the bus

a)

True

b)

False

77.

When ETS tries to download a device with an individual address that already exists in the

installation, ETS will automatically unload the existing device in order to be able to

program the new device

a)

True

b)

False

78.

A standard KNX device that is fully programmed contains an individual address, filter

table and IP address

a)

True

b)

False

79.

When the ‘Central’ box is checked in the Properties container of a selected group

address, the group address will be set to "blocked" in all couplers included in the

installation.

a)

True

b)

False

80.

A display unit regularly requesting the status of devices that it monitors, increases bus

load considerably

a)

True

b)

False

81.

The local individual address shall always be set to the highest device number in a line

a)

True

b)

False

82.

The telegram's “Acknowledgement” field is only displayed in the ETS Group Monitor

a)

True

b)

False

83.

The parameter settings of the devices used are exported during project export

a)

True

b)

False

84.

The "local individual address" must in all cases be set to 15.15.255

a)

True

b)

False

85.

The building structure is exported during project export

a)

True

b)

False

86.

The driver for the USB interface has to be installed via a separate installation program on

the commissioning PC

a)

True

b)

False

87.

Partial download is possible via the USB interface

a)

True

b)

False

88.

Programming a KNX TP installation can be done in advance, e.g. in a workshop by

connecting a single bus device to a small installation consisting of a power supply and a

choke

a)

True

b)

False

89.

Partial download is useful when only parameters/ group addresses have to be

downloaded

a)

True

b)

False

90.

After a bus device has been unloaded, the bus device is automatically deleted from the

ETS Buildings panel.

a)

True

b)

False

91.

Programming a KNX TP installation can only be realized when all bus devices are

connected

a)

True

b)

False

92.

The driver for the USB interface will be automatically installed when connecting it to the

commissioning PC

a)

True

b)

False

93.

The programming of a KNX TP installation can be changed later on at any time by

downloading the application

a)

True

b)

False

94.

After a bus device has been unloaded, the bus device has to be sent back to the

manufacturer

a)

True

b)

False

95.

Programming a KNX TP installation can be done without power

a)

True

b)

False

96.

Partial download should not be done because of the high bus load

a)

True

b)

False

97.

After a bus device has been unloaded, it can be programmed again as normal

a)

True

b)

False

98.

After a bus device has been unloaded, it cannot be programmed anymore with the

previously programmed application

a)

True

b)

False

99.

Partial download is only possible via the USB interface

a)

True

b)

False

100.

Partial download is not possible

a)

True

b)

False