Construction Project

Total questions: 30

Worksheet time: 15mins

Name
Class
Date
1.

Which professionals are typically involved in the design stage of a construction project?

a)

Architect, Structural Engineer, Quantity Surveyor

b)

Carpenter, Bricklayer, Plumber

c)

Landscaper, Roofer, Joiner

d)

Shopfitter, Decorator, Painter

2.

What is the main purpose of the design stage?

a)

To physically start construction

b)

To finalise plans, specifications, and ensure compliance

c)

To order landscaping materials

d)

To install utilities

3.

True or False: The planning stage may involve negotiating Section 106 agreements and CIL payments.

a)

True

b)

False

4.

Which trade is responsible for removing vegetation and old buildings from site?

a)

Demolition contractor

b)

Plumber

c)

Carpenter

d)

Roofer

5.

Which of these is NOT a material used in groundworks?

a)

MOT Type 1 hardcore

b)

Reinforcement steel

c)

Ceramic tiles

d)

Geotextiles

6.

What is the purpose of a trench box?

a)

To support excavation walls and prevent collapse

b)

To store site tools

c)

To cover manholes

d)

To test concrete cubes

7.

True or False: Utility maps and CAT & Genny scans are essential before excavation.

a)

True

b)

False

8.

Which type of pile is installed using continuous flight auger (CFA) methods?

a)

Driven pile

b)

CFA pile

c)

Screw pile

d)

Timber pile

9.

Which trade installs reinforcement cages for foundations?

a)

Plumber

b)

Steel fixer

c)

Roofer

d)

Electrician

10.

What is the role of cavity trays in wall construction?

a)

To hold bricks in place

b)

To divert moisture out of the cavity

c)

To insulate the wall

d)

To increase acoustic performance

11.

Which trade is responsible for installing suspended ceilings and partitions during fit-out?

a)

Dryliner

b)

Plumber

c)

Roofer

d)

Electrician

12.

Which of these is an example of a ground floor system?

a)

Block and beam

b)

Slate roofing

c)

Curtain walling

d)

Underfloor heating

13.

True or False: Flat roofs require tapered insulation schemes to ensure water run-off.

a)

True

b)

False

14.

What material is most commonly used for window frames in modern UK construction?

a)

uPVC

b)

Bamboo

c)

Straw

d)

Cork

15.

Which test checks the airtightness of windows and curtain walling?

a)

Flood test

b)

Air permeability test

c)

Electrical continuity test

d)

Plate load test

16.

Which trade installs underfloor heating systems?

a)

Plumber

b)

Roofer

c)

Bricklayer

d)

Electrician

17.

Which fix stage involves installing sockets, switches, and sanitaryware?

a)

First fix

b)

Second fix

c)

Shopfitting

d)

Groundworks

18.

Which method is used to test drainage systems on completion?

a)

Flood test

b)

Air or water pressure test

c)

Electrical continuity test

d)

Plate load test

19.

True or False: A gas membrane may be required as part of remediation works.

a)

True

b)

False

20.

Which of these is an example of a sustainable urban drainage system (SUDS)?

a)

Swales

b)

Concrete slab

c)

Steel pile

d)

Suspended ceiling

21.

What is the main material used for landscaping topsoil preparation?

a)

Topsoil

b)

Reinforced concrete

c)

Plasterboard

d)

Asphalt

22.

Who is responsible for carrying out topographical and as-built surveys?

a)

Electrician

b)

Surveyor

c)

Carpenter

d)

Plumber

23.

Which method is used by surveyors to ensure construction is built in the right location?

a)

Soil stabilisation

b)

Setting out

c)

Compaction

d)

Grouting

24.

Which trade installs bespoke joinery, display systems, and signage in retail units?

a)

Shopfitter

b)

Roofer

c)

Plumber

d)

Electrician

25.

True or False: Shopfitting often requires night shifts and rapid programmes.

a)

True

b)

False

26.

Which document records inspections, tests, and evidence of quality assurance during a project?

a)

Inspection & Test Plan (ITP)

b)

Risk Assessment

c)

Method Statement

d)

Toolbox Talk

27.

Which regulation sets out health and safety duties for UK construction projects?

a)

Building Regulations 2010

b)

CDM 2015

c)

LOLER

d)

COSHH

28.

What equipment is commonly used by surveyors to measure levels and positions on site?

a)

Total station

b)

Drill

c)

Trowel

d)

Jackhammer

29.

Which professional is responsible for eliminating and reducing risks at the design stage under CDM 2015?

a)

Principal Designer

b)

Carpenter

c)

Site Labourer

d)

Shopfitter

30.

What is the final stage before handover that ensures all defects are closed out?

a)

Snagging

b)

Shopfitting

c)

Excavation

d)

Demolition