1.7.1 - 1.7.3: Bricklaying, Stonemasonry, and Plastering Prep

Total questions: 30

Worksheet time: 15mins

Name
Class
Date
1.

Which tool is primarily used by a bricklayer to check vertical and horizontal alignment during construction?

a)

Spirit level

b)

Brick trowel

c)

Block splitter

d)

Pointing tool

2.

Which bonding pattern is commonly used for laying rows of bricks with long faces visible and staggered joints?

a)

Stretcher bond

b)

Stack bond

c)

Header bond

d)

English bond

3.

Which step comes first when a bricklayer begins constructing brickwork on site?

a)

Mix mortar with mixer

b)

Place and align the first course

c)

Spread mortar across bed joints

d)

Work from plans to measure areas

4.

Stone dressing mainly involves which activity before stone is used in construction or carving?

a)

Pouring cement into stone molds

b)

Cutting rough stone to size and shape

c)

Gluing thin veneers to blocks

d)

Painting stone with sealers

5.

Dry‑stone walling relies most on which factor for strength and durability?

a)

Steel reinforcement between courses

b)

Waterproof membrane under courses

c)

High‑strength cement mortar

d)

Careful interlocking of selected stones

6.

A stonemason repairing traditional stone mouldings is primarily doing which type of work?

a)

Architectural design drafting

b)

Initial quarry extraction

c)

Concrete formwork assembly

d)

Maintenance and restoration

7.

Before applying plaster, what is the essential preparation step to ensure a stable base?

a)

Paint with primer coats

b)

Install insulation boards

c)

Clean and level surfaces

d)

Score and seal with epoxy

8.

To achieve correct plaster consistency, which method is appropriate for a plasterer?

a)

Mix to target texture by hand or mixer

b)

Add sand until mix stiffens significantly

c)

Pour water after application to walls

d)

Use only premixed bags without checking

9.

Which statement best describes dry lining in interior construction?

a)

Fixing plasterboard to studs without wet plaster

b)

Spraying gypsum compound to level concrete surfaces

c)

Applying wet plaster coats onto solid brick walls

d)

Attaching timber cladding over existing wall finishes

10.

How do plasterers replicate traditional ornamental plasterwork?

a)

Painting stencils to imitate relief patterns on walls

b)

Using plaster, moulds, and casts for decorative elements

c)

Carving timber directly on ceiling joists by hand

d)

Installing prefabricated PVC trims around cornices

11.

Which task is most associated with a joiner at the start of a wood project?

a)

Measuring and marking out wood to technical plans

b)

Erecting scaffolds around the work area

c)

Selecting fasteners based on load requirements

d)

Applying protective varnish to finished surfaces

12.

Which pair lists common methods a joiner uses to cut wood?

a)

By chemical etching and by sanding

b)

By thermal torch and by plasma

c)

By laser and by waterjet

d)

By hand and by machine

13.

Which structures are typically produced by a joiner?

a)

Steel frames, gantry cranes, and ducts

b)

Brick walls, block foundations, and slabs

c)

Paving, kerbs, drainage channels, and manholes

d)

Staircases, windows, doors, and roof trusses

14.

Which interior woodwork items does a carpenter commonly fit?

a)

Tiles, grout joints, screed layers, and membranes

b)

Staircases, doors, skirting boards, and window frames

c)

Radiators, thermostats, pumps, and pipework

d)

Cable trays, junction boxes, sensors, and conduits

15.

What is meant by replicating traditional ornamental mouldings in woodwork?

a)

Using synthetic veneers to speed up installation

b)

Installing plain trims to reduce material wastage

c)

Producing structural beams for modern load requirements

d)

Creating decorative woodwork that mirrors historical designs

16.

What is the main purpose of wooden supports or shuttering in concrete work?

a)

Reduce the need for steel reinforcement bars

b)

Improve moisture resistance of timber joists

c)

Hold setting concrete in place during curing

d)

Provide permanent thermal insulation to slabs

17.

Which set of tasks best describes an electrician’s core duties with services and equipment?

a)

Installing, inspecting, and testing electrical systems

b)

Drafting architectural plans for building layouts

c)

Pouring and finishing reinforced concrete floors

d)

Fabricating and welding structural steel members

18.

Why must electricians follow safety regulations on site?

a)

To reduce project paperwork and save administrative time

b)

To keep workers and users safe and prevent accidents

c)

To ensure faster installation with minimal supervision

d)

To meet aesthetic standards for visible components

19.

Which tasks are involved in building and installing electrical control panels?

a)

Designing, assembling, and wiring panels to manage systems

b)

Casting panels in concrete with embedded rebar cages

c)

Mounting panels with adhesive and decorative trims

d)

Covering panels with drywall to conceal cables

20.

Beyond homes and commercial buildings, which installations do electricians commonly handle?

a)

Gas boilers and domestic hot water cylinders

b)

Timber trusses and decorative ceiling mouldings

c)

Agricultural irrigation channels and sluice gates

d)

Street lighting and traffic management systems

21.

Which task is part of basic pipework for plumbing maintenance?

a)

Cutting and shaping pipe sections

b)

Designing a new bathroom layout

c)

Scheduling subcontractor daily shifts

d)

Estimating project material costs

22.

A plumber finds a fault in a heating system. What is the first appropriate action?

a)

Switch to electric heaters

b)

Replace all radiators immediately

c)

Locate and fix the problem

d)

Drain the entire system fully

23.

Which service relates to central heating maintenance?

a)

Servicing gas and oil-fired systems

b)

Laying laminate flooring boards

c)

Installing kitchen worktops

d)

Painting exterior house walls

24.

Which situation is a typical plumbing emergency callout?

a)

Boiler breakdown or blocked drain

b)

Loose wallpaper edge seams

c)

Peeling exterior paint layers

d)

Uneven carpet underlay pad

25.

When preparing a wall for painting, which action is essential?

a)

Remove door hinges fully

b)

Install new light fixtures

c)

Fill holes and level the surface

d)

Add extra heating vents

26.

Which are examples of finishes a painter might apply?

a)

Tiles and grout

b)

Screed and concrete

c)

Stains and varnishes

d)

Carpet and underlay

27.

A decorator is stripping old finishes. What is the objective?

a)

Prepare the surface for a new finish

b)

Expose the bare brick permanently

c)

Increase wall thermal insulation

d)

Create decorative texture effects

28.

Which material might a tiler use to level a floor before tiling?

a)

Aluminum angle brackets

b)

Plaster, sand, or cement

c)

Timber joists and nails

d)

Polycarbonate roof sheets

29.

Which tool setup is most suitable for cutting many porcelain tiles to consistent widths on a job site?

a)

Hand tile nippers for gradual edge trimming

b)

Bench-mounted wet saw with guide fence

c)

Utility knife scored along a straightedge

d)

Hammer and cold chisel for quick snapping

30.

After tiles are fixed to adhesive and spacers are removed, what is the correct next step to finish the surface?

a)

Apply grout to fill joints evenly

b)

Sand the tile faces lightly

c)

Prime the joints with PVA glue

d)

Seal the tiles before any grouting