wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

NCCER Core 00100 1.0.0 Section Review

Total questions: 3

Worksheet time: 2mins

Name
Class
Date
1.

A major reason for the projected shortage of trained craft professionals is ___________________.

a)

construction salaries are too low

b)

technology has eliminated many construction careers

c)

demand for construction projects is declining

d)

the retirement of Baby Boomers

2.

For every dollar made by men in construction, women make approximately ___________________.

a)

50 Cents

b)

68 Cents

c)

87 Cents

d)

99 Cents

3.

During the 19th century, many structures could be built faster due to the invention of ___________________.

a)

hand tools

b)

steam-powered machinery

c)

self-healing concrete

d)

virtual reality