Worksheets4 Unit 17 Quality checks
Total questions: 7
Worksheet time: 70secs
What is the main activity involved in most engineering quality inspection?
Painting
Measuring part geometry
Assembling parts
Packaging
What is the main goal of incoming goods inspection?
To ensure raw materials received are compliant
To deliver goods to customers
To manufacture products
To pack finished goods
List two reasons why materials might be placed in quarantine during incoming goods inspection.
Damaged materials, wrong deliveries, incorrect quantities, awaiting return to supplier, missing paperwork/labelling, materials not yet approved for use.
Materials are always placed in quarantine regardless of condition.
Quarantine is only for finished products, not incoming goods.
Quarantine is used to store excess inventory for future use.
What is the primary purpose of a go/no-go gauge?
To measure the exact size of a component
To determine if a component is within tolerance
To increase the size of a component
To clean a component
What is the main goal of calibration?
To increase measurement uncertainty
To minimize measurement uncertainty by ensuring the accuracy of test equipment
To make equipment look new
To reduce the cost of equipment
What should be done if an item fails calibration tests?
It should be ignored
It will be either reworked/repaired or scrapped
It should be used as is
It should be sold
Equipment with invalid or missing calibration stickers should still be used if it appears to be working correctly.
True
False