4 Unit 17 Quality checks

Total questions: 7

Worksheet time: 70secs

Name
Class
Date
1.

What is the main activity involved in most engineering quality inspection?

a)

Painting

b)

Measuring part geometry

c)

Assembling parts

d)

Packaging

2.

What is the main goal of incoming goods inspection?

a)

To ensure raw materials received are compliant

b)

To deliver goods to customers

c)

To manufacture products

d)

To pack finished goods

3.

List two reasons why materials might be placed in quarantine during incoming goods inspection.

a)

Damaged materials, wrong deliveries, incorrect quantities, awaiting return to supplier, missing paperwork/labelling, materials not yet approved for use.

b)

Materials are always placed in quarantine regardless of condition.

c)

Quarantine is only for finished products, not incoming goods.

d)

Quarantine is used to store excess inventory for future use.

4.

What is the primary purpose of a go/no-go gauge?

a)

To measure the exact size of a component

b)

To determine if a component is within tolerance

c)

To increase the size of a component

d)

To clean a component

5.

What is the main goal of calibration?

a)

To increase measurement uncertainty

b)

To minimize measurement uncertainty by ensuring the accuracy of test equipment

c)

To make equipment look new

d)

To reduce the cost of equipment

6.

What should be done if an item fails calibration tests?

a)

It should be ignored

b)

It will be either reworked/repaired or scrapped

c)

It should be used as is

d)

It should be sold

7.

Equipment with invalid or missing calibration stickers should still be used if it appears to be working correctly.

a)

True

b)

False