NEW
Font size
WorksheetsEE Dia.
Total questions: 60
Worksheet time: 45mins
A LEGAL RESTRICTION ON BUILDING CONSTRUCTION TO PROVIDE ACCESS,
LIGHT, VENTILATION, OR PREVENT ENCROACHMENT.
Courtyard
Set Back
Easement
Right of Way
A DESIGNATED AREA WITHIN A CITY OR MUNICIPALITY WITH FIRE HAZARD
CLASSIFICATIONS THAT DETERMINE CONSTRUCTION REQUIREMENTS.
Fire Area
Fire Lane
Fire Risk
Fire Zone
SECTION 205: BUILDING OFFICIALS – THE ________ DESIGNATES BUILDING
OFFICIALS IN CITIES AND MUNICIPALITIES TO CARRY OUT LOCAL ENFORCEMENT.
President
Secretary
City Mayor
Governor
BUILDING PERMIT APPLICATIONSUBMISSIONS MUST INCLUDE:
______ SETS OF PLANS (ARCHITECTURAL, STRUCTURAL, ELECTRICAL, MECHANICAL,
PLUMBING, ETC.) SPECIFICATIONS, ESTIMATES, AND BILL OF MATERIALS.
Three
Four
Five
Six
SECTION 401: TYPES OF CONSTRUCTION:
MASONRY AND WOOD CONSTRUCTION, WITH PARTIAL FIRE RESISTANCE.
TYPE i
TYPE II
TYPE III
TYPE IV
Minimum Requirements for Accessibility:
Doorway widths should be with a min. 0.80 m
0.70 M.
0.80 M.
0.90 M
1.00 M.
Minimum Requirements for Accessibility:
Corridor widths must be with a minimum of _______ meter.
0.90 M
1.00 M.
1.10 M.
1.20 M.
a parcel of land bounded on the sides by streets or alleys or pathways or other natural or
man-made features, and occupied by or intended for buildings.
Lot
Subdivision
Block
Plot
a type of real property where individuals own separate units within a building and
share ownership of common areas, including the land, through a corporation formed for that
purpose.
Building
Apartment
Condominium
Skyscraper
Prevention of Site Assets: Existing trees ( ____mm+ diameter),
shrubs, and quality topsoil must be preserved as per DENR
rules and reused for landscaping.
100 mm
200 mm
300 mm
400 mm
PD 957: Road Right of Way:
Major road: ______m. minimum
8.00 m.
12.00 m.
10.00 m.
6.00 m.
PD 957 Shelter Component:
Minimum floor area for open market housing shall be 42 square meters and
_____ square meters for medium cost housing.
30 sqm.
40 sqm.
50 sqm.
20 sqm.
Affordable housing for low-income earners with slightly
higher cost and standards than socialized housing.
Low Income Housing
Economic Housing
Low Cost Housing
Resettlement Housing
A 3m-wide pedestrian access, applicable only to socialized housing.
Alley
Motor Court
Path walk
Service Road
A housing unit that is partially complete—basic structural enclosure with
windows and doors, common in socialized housing.
Core House
Shell House
Row House
Studio Unit
Refers to the number of lots or dwelling units per hectare, used to determine
allocation for parks, roads, and community facilities.
Population
Density
Concentration
Amenities
BP 220 DESIGN GUIDELINES:
Multi Condominium Housing
Elevators: Required for ____-storey & above.
4 storey
6 storey
5 storey
7 storey
A legal process where disputes are settled by a neutral third party instead of going to court.
Litigation
Settlement
Mediation
Arbitration
Mandatory for license renewal.
NBI Clearance
Continuing Professional Development
2 Yrs. Apprentice
Passed the Architecture Licensure Examination
The process of overseeing construction activities to ensure
compliance with approved plans and designs, and to ensure that the built environment meets
the required standards.
Site Visits
Construction
Supervision
Construction
Management
Site Inspections
Conducting site analysis, feasibility
studies, and preliminary design development.
Pre-Design
Design Development
Schematic Phase
Consultation Phase
A legal concept granting creators control over their literary and
artistic creations.
Copyright
Patent
Trademark
Technology Transfer
In the Philippines, copyright protection lasts during the
lifetime of the author plus ____ years after their death.
10 YRS.
50 YRS.
30 YRS.
100 YRS.
the PRC leadership is composed of ___ members.
5 members
2 members
4 members
3 members
Within 15 days after the awards of Bids, the payment to the Architect shall be adjusted so that it will amount to a sum equivalent to how many percent of the Basic Fee, computed upon the winning Bid? Price?
100%
50%
85%
90%
How many percent of the architect's fee is payable to the architect upon completion of the preparation of the schematic design phase and up to final design development phase?
20%
35%
50%
10%
The fee of the architect for design-build services by administration.
10%
5%
7%
3%
One of the methods of compensation for architectural service is based on technical hours and expenses & made by adding all costs of technical services (man-hours time rate). A multiplier is used to take care of overhead & profit. This method, however, is applicable only to non-creative work & aspects of pre-design services & supervision work. What is this method called?
Cost Plus
Multiple Direct Personal Expenses
Lump Sum
Per Diem
Which is included in the Architect's Professional Fee?
Fees for soil tests
Fees for Electronic Design
Fees for Topographical Surveys
Fees for Mechanical Systems design
The minimum fee per appearance of an architect when rendering service as an expert witness shall be.
P200
P500
P750
Free of Charge
When the owner fails to implement the plans and documents for construction as prepared by the architect, the architect is entitled to receive what percentage of his fee.
35%
50%
85%
100%
For interior design services, the architect shall be paid what percentage of
the fee upon submission of the final design.
5%
25%
50%
20%
How are projects classified in determining the basis for the Architect's Basic Fee?
Owners Financial Funds
Contractors Adaptability to Project
Degree of Project Complexity
Architects Reputation
For a housing project exceeding 10 units, how much is the minimum fee chargeable for each additional unit, excluding the fees for the first 10 units?
10% of Minimum Basic Fee
30% MBF for 11th Unit above
30% MBF for 2nd to 10th Unit
60% MBF for 11th Unit and Above
The Project Construction Cost referred to in the compensation of the Architect for his Regular Design Fee means the cost of the completed structure which include one of the following:
Grottos
swimming pool
communications and electronic system
movable pieces of furniture
What method of compensation is most suitable for compensating
the Architect's services for the pre-design phase?
Lump Sum / Fixed Fee
MDPE
Professional Fee
Reimbursable Expenses
If the Project Manager (PM) also serves as the Construction Manager (CM) to oversee _________ during the construction of the project, he shall provide the services detailed under SPP Documents 204-A and/or 204-B.
plan, program and monitor various activities
quality and performance
elements of time, quality and performance
time, cost and quality control
As early as during the design development phase, perhaps even concurrently with the Architect’s commission, the Project Manager (PM) should conduct regular ________
with the Owner and with the Architects and Engineers (for A&E services) on all aspects of planning for the project.
meetings
consultations
inspection
visitations
The presence of a Project Manager does not relieve the _________ and _________ of their respective normal duties and responsibilities in the design and construction of the project.
Architect, Client
Designers, Contractors
Contractors, Consultants
Architect, Engineers
________ involves management activities over and above the normal architectural and engineering (A&E) services carried out during the pre-design, design
and construction phase.
Construction Management (CM)
Building Management (BM)
Project Management (PM)
Comprehensive Architectural Services
The Architect EXPLAINS HIS METHODOLOGY in translating the plan/design
requirements of the proposed project.
Observation
Feasibility Study
Interview
Evaluation
An Architect nominated by the Owner and approved by the IAPoA to organize the Architectural Design Competition on behalf of the Owner.
Design Consultancy
Professional Advisor
Competition Coordinator
Architect of Records
When the Architect of Record of a finished project dies, who can assume permission regarding reproducing his/her plans?
Family
Firms Co-owner
Depends on the ruling of the court
Nobody
If an ALE passer fails to take his/her oath with any member of the Board or authorized representative present, will he/she still be able to practice architecture?
Yes, he/she passed the examination anyway
No, he/she is not allowed to practiced.
It depends on the Board's decision
Yes, if he/she passes the requirements for reconsideration
Any person or entity who/which shall force an architect to render service
without a service agreement shall be guilty of:
malpractice
misdemeanor
illegal practice
moral turpitude
Any formal grouping of two or more architects or architectural firms
working in joint venture on a project basis.
Sole Proprietorship
Architectural Partnership
Association
Architectural Corporation
What is the proof that the architect is licensed?
Professional Identification Card (PIC)
Certificate of Registration (COR)
Seal
IAPOA Certificate
An additional fee is mandated to be given to Architects-of-Record working in the government to cover his/her civil liability. How much is this fee?
1.0% of the project cost every project
2.0% of the project cost every project
1.5% of the project cost every project
0.5% of the project cost every project
If your Certificate of Registration (COR) is revoked, how long shall you wait
before you can apply for its re-issuance?
2 years
1 year
6 months
3 years
Refers to the range of professional services that covers Pre-design Services, Regular Design Services, Specialized Architectural Services, Construction Services and Post-Construction Services.
Comprehensive Development Planning Services
Detailed Architectural & Engineering Design Services
Comprehensive Architectural Services
Detailed Architectural Design Services
In this extended dimension, the Architect is the ________. He functions as creator, author, and coordinator of the building design which becomes the basis for the construction of a project.
Professional Designer
Prime Designer
Prime Professional
Project Manager
The Architect is not expected to perform all the services. Rather, he is to act as the ________ in procuring and coordinating the necessary services required by a project.
Coordinator
Agent of the Client
Middleman
Representative
Official guidelines under RA 9266 that define the scope of an architect’s services.
Standards of Professional Practice
The National Building Code of the Philippines
UAP Documents 300 series
UAP Documents 200 series
The science and art of managing land use and development
at urban or regional scales for sustainability.
Environmental Planning
Planning Services
Allied Services
Site Planning
The process of managing land use, infrastructure, transport, housing,
and environmental systems to guide city growth.
Site Planning
Community Planning
Urban Design
Regional Planning
The architect oversees upkeep and safety while coordinating with various stakeholders to support the building’s performance and preservation.
Post Design Services
Post Construction Services
Construction Services
Pre-Design Services
The Architect manage business operations by maximizing occupancy
and billing tenants for rentals and utilities.
Post-Construction Evaluation
Business Management
Operation
Building & Facilities Administration
Marketing Management Operations
Evaluates reports and collaborates with the Architect.
Clerk of Works
Contractor’s Site Engineer
Site Manager
Owner’s Representative
Professional service ensuring cost, time, and quality control in construction.
Full-time Supervision Services
Construction Management
Building Administration
Building Systems Design
a person who concentrate primarily on a particular subject or activity;
a person highly skilled in a restricted field.
Expert
Specialist
Master
Professional
