1.
“Courtyard” is not considered in which of the following estimates?
a)

Approximate quantity method

b)
Unit rate estimate
c)
Lump sum estimate
d)
Plinth area estimate
2.
During tender submission, the contractor should deposit —————— as a guarantee of the tender.
a)
Security deposit
b)
Earnest money
c)
Caution deposit
d)
None of the above
3.
Choose the correct statement:
a)
The amount deposited by the contractor while submitting the tender is called security deposit
b)
Earnest Money Deposit (EMD) has to be deposited only by the contractor whose tender is accepted by the client
c)
If the lowest quoted contractor refuses to take up the work, his EMD will be forfeited by the client
d)
Security deposit is refunded to the contractor soon after completing the project
4.
Estimate expected to be least accurate is:
a)
Supplementary estimate
b)
Plinth area estimate
c)
Detailed estimate
d)
Revised estimate
5.
For laying or paving 400 sq.m area using 20 cm × 20 cm size paving tiles, the number of tiles required will be
a)
10000
b)
1000
c)
400
d)
4000
6.
Weight of 12 mm dia steel bar per running meter is
a)
0.617 kg
b)
0.789 kg
c)
0.888 kg
d)
0.698 kg
7.
The specification of earth work in foundation trenches, drains, etc., lift ordinarily specified is
a)
0 m
b)
1.5 m
c)
5 m
d)
3 m
8.
In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and:
a)

2 Times of Breadth of the wall

b)
Half breadth of wall on each side
c)
One fourth breadth of wall on each side
d)
None of these
9.
Honey comb brick wall is measured in
a)
Metres
b)
Square metres
c)
Cubic metres
d)
Number
10.
In detailed estimate, the provision for contingencies is usually
a)
1%
b)
3% to 5%
c)
10%
d)
12% to 50%