wayground logo

Free Printable Worksheets

Font size

S
M
L
XL
Worksheets

Business Analyst

Total questions: 65

Worksheet time: 1hrs 5mins

Name
Class
Date
1.

a business analyst's job in quality assurance is to analyze the process but he or she does not doucment the analysis:

a)

true

b)

false

2.

Which one of these is NOT a good habit of successful Business Analysts

a)

Communicate with stakeholders only once during Business Analysis

b)

Work collaboratively with Project Managers

c)

Are clear about their roles and responsibilities

d)

Integrate creativity and critical thinking in their work

3.

A Business Analyst's role in preparing a Project to avoid crises does NOT include:

a)

Providing training to leaders

b)

Developing a clear vision statement

c)

Helping a team learn new communication skills

d)

Evaluating team performance

4.

The role of management function is to organize, deploy and control all of the following EXCEPT:

a)

Events

b)

Information

c)

Technology

d)

People

5.

The following are all cost centers EXCEPT:

a)

Human Resources

b)

Customer Service

c)

Sales & Marketing

d)

Legal Services

6.

A company purchases a fleet of cars for its rental branch. The cars are considered:

a)

Intangible assets

b)

Tangible assets

c)

Intangible liability

d)

Tangible liability

7.

Companies with inefficient processes will most likely show:

a)

Competitive market placement

b)

High staff turnover

c)

Experineced management

d)

Satisfied customers

8.

A business analyst and his or her team must be aware of both __________ of the presentation.

a)

The content and its delivery

b)

The content and the audience

c)

The delivery and the audience

d)

The audience and the topic

9.

Organizations develop their own culture to:

a)

Integrate employess

b)

Adapt to enviroment

c)

Gain market advantage

d)

Both a & b

10.

A system contains all of the following EXCEPT:

a)

Process

b)

Output

c)

Market

d)

Input

11.

1. Business analyst uses tools to perform which functions:

a)

To track, manage and describe requirements in detail

b)

To model requirements diagrammatically

c)

To collaborate with team and stakeholders

d)

All the above

12.

What are the different categories of business analyst tools?

a)

Requirement related tools

b)

Modelling tools

c)

Collaboration tools

d)

All the above

13.

Microsoft word and Microsoft Excel can be used for tracking and describing requirements.

a)

True

b)

False

14.

Can Business Analyst use MS Visio for representing business relations diagrammatically?

a)

YES

b)

NO

15.

Is Skype one of the best collaboration tools used by business analysis for meeting stringent project timeline?

a)

YES

b)

NO

16.

Which tool is used to create wireframes, host project online and acts as a collaboration tool?

a)

Balsamiq

b)

Rational Requisite Pro

c)

Pencil

d)

Smart Draw

17.

Which tool helps to collaborate and communicate between teams and share information securely, in addition it allows the admin to analyze the data?

a)

Google Docs

b)

Skype

c)

Trello

d)

MS Word

18.

Which one of the below is a real time work management tool and helps in decreasing the o project analysis cost by using central storage?

a)

Version one life cycle

b)

Wrike

c)

SWOT

d)

Rational Requisite Pro

19.

Unique feature of integration with enterprise application and open source software development tools is available in which tool?

a)

Rational Requisite Pro

b)

SWOT

c)

Trello

d)

Version one lifecycle

20.

Which one of these is not a feature of the smart draw tool?

a)

Integrate with MS office, Google docs, One drive

b)

Support 100 language for creating diagram

c)

Cannot be installed behind a firewall

d)

Automates activities like Add, Move or Delete shapes

21.

BI can catalyze a business’s success in terms of _____________

a)

Distinguish the products and services that drive revenues

b)

Rank customers and locations based on profitability

c)

Ranks customers and locations based on probability

d)

All of the mentioned

22.

Often, Where do the BI applications gather data from?

a)

Data warehouse

b)

Data mart

c)

Both Data Warehouse and Datamart

d)

Database

23.

Which of the following are direct benefits of Business Intelligence?


Options

a)

Decision making

b)

Delivers data mining functionality

c)

Artificial intelligence

d)

All of the above

24.

________________ in business intelligence allows huge data and reports to be read in a single graphical interface

a)

Warehouse

b)

Reports

c)

OLAP

d)

Dashboard

25.

Which of the following are BI tools?

a)

Qlik

b)

Siebel

c)

Cognos

d)

All of the above

26.

All business intelligence applications require a data warehouse

a)

True

b)

False

27.

What does a typical BI environment comprise of?

a)

Data warehouse

b)

Data mart

c)

OLAP TOOLS

d)

All of the above

28.

How many types of BI users are there?

a)

Four: The Professional Data Analyst, The IT users, The head of the company, The Business Users.

b)

Two - The head of the company, The Business Users.

c)

One- The Business Users

d)

Three-The IT users, The head of the company, The Business Users.

29.

Which of the following statement is true about Business Intelligence?

a)

BI convert raw data into meaningful information

b)

BI has a direct impact on organization's strategic, tactical and operational business decisions.

c)

BI tools perform data analysis and create reports, summaries, dashboards, maps, graphs, and charts

d)

All of the above

30.

KPI stands for?

a)

Key Performance Indicators

b)

Key Performance Identifier

c)

Key Processes Identifier

d)

Key Processes Indicators

31.

Which of the following is false?

a)

Data visualization include the ability to absorb information quickly

b)

Data visualization is another form of visual art

c)

Data visualization decrease the insights and take slower decisions

d)

None Of the above

32.
Business Analysist help organization to maximize .....
a)
Business Values
b)
Business Strategy
c)
Business Process
d)
Innovation
33.
concerned with overall project success; ensure the project is deliverd on time, within budget, within scope; remove issues/barriers
a)
System Analyst
b)
Business Analyst
c)
Tester Analyst
d)
Project Manager
34.
resolving a problem face by; enabling stakeholders to take advantage of an opportunity, is called ....................
a)
Need
b)
Context
c)
Solution
d)
Change
35.
Software Development Life Cycle (SDLC) 1. Analysis 2. Maintenance 3.Design 4. Development 5. Testing & Implementation Which is the right process of SDLC?
a)
1-2-3-4-5
b)
1-3-4-5-2
c)
3-1-4-5-2
d)
3-4-5-2-1
36.

Fundamental concept to the practice of business analysis is called...

(a)  

37.
Which is not underlying compencies of Business Analyst ?
a)
Analytical Thinking
b)
Project Management
c)
Business Knowledge
d)
Communication Skill
38.
How we interact & communicate with stakholders whose impact s hight and influence is high
a)
check for change
b)
keep informed
c)
Satisfaction Must
d)
collaborate
39.
Verified Requirement to be approved, business analyst must perform which method
a)
Trace Requirements
b)
Workshops
c)
Reviews
d)
Interviews
40.

The BABOK poses basic questions that are answered as the BA navigates through the requirements and design cycle. What is the order of the four questions in which they are processed during the design cycle?

a)

What are the needs?; Why do I want it?; What do I want?; What are the conditions?

b)

Why do I want it?; What are the needs?; What are the conditions?; What do I want?

c)

Why do I want it?; What are the needs?; What do I want?; What are the conditions?

d)

What are the needs?; What are the conditions?; Why do I want it? What do I want?

41.

Which of the following is true about knowledge areas?

a)

They comprise the business analysis project life cycle.

b)

They represent areas of specific business analysis expertise that encompass several tasks

c)

They provide a methodology for completing business analysis work.

d)

They represent or correlate to project phases.

42.

Susan is a business analyst developing a screen mock-up for a key stakeholder showing fields from a data model. Which of the following is true?

a)

Susan is defining the design of some aspect of the solution based upon elicited requirements.

b)

Susan is working both as a business analyst and a design architect.

c)

Susan is eliciting requirements and using the data model fields to understand user needs.

d)

Susan is assisting the architect and developer to complete their deliverables.

43.

Eliciting requirements is a key task in business analysis and serves as a foundation for the solution to the business needs. The business analyst should understand the commonly used techniques to elicit requirements, should be able to select appropriate technique(s) for a given situation, and be knowledgeable of the tasks needed to prepare, execute and complete each technique. According to the BABOK, which types of requirements are elicited?

a)

Isolated, compartmental, validation, verification

b)

Focused technical, organizational, external, non-technical

c)

Business, stakeholder, solution, transition

d)

Functional, non-functional, customer, stakeholder

44.

At a conference for business analysts, there was a heated debate on the topic of the BACCM and the order of importance for the six core concepts. Which of the following statements are correct?

a)

Deriving the solution is the first priority as that drives the priority of the other five concepts.

b)

Stakeholders should be identified as the first key step in using the BACCM.

c)

The Need must be addressed first as this is the basis for the Change.

d)

No single concept holds greater importance or significance over any other concept.

45.

Gil was recently hired by Simon Technologies as a BA due to his extensive experience with Customer Relationship Management systems. Gil immediately began designing the future state processes based upon what he has seen work best for other organizations. According to the BACCM, what is Gil missing?

a)

Necessity

b)

Solution

c)

Context

d)

Value

46.

Andre is focusing on documenting the needs of the enterprise related to data conversion. What type of requirement is Andre documenting?

a)

Transition requirement

b)

Non-functional requirement

c)

Functional requirement

d)

Solution requirement

47.

Two analysts were having a debate about which job titles actually conduct business analysis. Which of the following include job titles that perform business analysis?

a)

Process analyst, business systems analyst, enterprise analyst.

b)

Process analyst, business systems analyst, product owner, product manager.

c)

Process analyst, business systems analyst, product owner, product manager.

d)

Job titles aren't important; anyone can be considered a business analyst regardless of their job title if they perform business analysis tasks.

48.

Sariah has just completed her required tasks as prescribed by the business analysis plan. Although the project is completed, how can Sariah continue to deliver value to the enterprise?

a)

Sariah does not have any further work to complete as she has done what the project manager has asked of her.

b)

Sariah can create test plans to confirm adoption of the changes by personnel.

c)

Sariah needs to conduct a readiness assessment to determine if the organization is ready for additional changes.

d)

Sariah needs to be prepared to conduct analysis in support of enterprise evolution and continuous improvement.

49.

"The system shall be available 99.3% of the time during the service hours of 6:00 a.m. and 9:00 p.m. seven days a week" is an example of what type of requirement?

a)

Non-functional requirement

b)

Stakeholder requirement

c)

Solution requirement

d)

Business requirement

50.

Multiple linear regression (MLR) is a __________ type of statistical analysis.

a)

univariate

b)

bivariate

c)

multivariate

d)

Non of the above

51.

A linear regression (LR) analysis produces the equation Y = 0.4X + 3. This indicates that:

a)

When Y = 0.4, X = 3

b)

When Y = 0, X = 3

c)

When X = 3, Y = 0.4

d)

When X = 0, Y = 3

52.

When writing regression formulae, which of the following refers to the predicted value on the dependent variable (DV)?

a)

Y

b)

Y (hat)

c)

X

d)

XX (hat)

53.

———- plot displays information as series of data points connected by straight lines.

a)

Bar

b)

Line

c)

Scatter

d)

Histogram

54.

—————- is about developing code to enable the machine to learn to perform tasks and its basic principle is the automatic modeling of underlying that have generated the collected data.

a)

Data Science

b)

Data Analytics

c)

Data Warehousing

d)

Data mining

55.

K- nearest neighbors algorithm is based on ————– learning

a)

Un- Supervised

b)

Supervised

c)

Association

d)

correlation

56.

Which of the following is NOT supervised learning ?

a)

PCA

b)

Decision Tree

c)

Linear Regression

d)

Naive Bayesian

57.

————-type of analytics descibes what happened in past

a)

Predictive

b)

Prescriptive

c)

Descriptive

d)

Probability

58.

—————– analysis estimates the relationship between single dependent variable and single independent variable

a)

Multiple regression

b)

Simple Regression

c)

Correlation

d)

Probability

59.

A perfect negative correlation is signified by ————-

A : 1 B : -1 C : 0 D : 2

a)

-0.001

b)

-1

c)

0

d)

-10

60.

A ......................... is a powerful tool to calculate, summarize, and analyze data that lets you see comparisons, patterns, and trends in your data.

a)

Pivot Table

b)

Table

c)

Chart

d)

Function

61.

Enter Your Name

4 lines
62.

Enter Your Enrolment No

4 lines
63.

Enter Your Branch(CSE, CSE-DS, CSE-AIML, CSIT, CY, IT)

4 lines
64.

Enter Your Acropolis Email ID

4 lines
65.

Enter Your Batch(2026 or 2027)

4 lines