PERT/CPM Introduction and Project Networks

Total questions: 88

Worksheet time: 44mins

Name
Class
Date
1.

Which statement best defines PERT/CPM as presented?

a)

A statistical quality control method for manufacturing defects

b)

A project management tool in the construction industry to plan, schedule, and control projects

c)

A financial accounting system for cost allocation

d)

A safety protocol for hazardous materials handling

2.

In a project network, what components form the network used to represent projects?

a)

Tasks and budgets

b)

Nodes and arcs

c)

Teams and milestones

d)

Risks and mitigations

3.

Which item is most directly associated with identifying immediate predecessors in project planning?

a)

Activity Information

b)

Precedence Relationship

c)

Time Information

d)

Resource Allocation

4.

Which description aligns with Time Information in a project's basic information?

a)

Detail of the activity such as excavation, masonry, or finishing

b)

Identification of required resources and costs

c)

Estimate of the activity duration

d)

Definition of the project network topology

5.

A planner lists excavation, masonry, and finishing for a project. Under which category of a project's basic information do these details fall?

a)

Time Information

b)

Risk Register

c)

Activity Information

d)

Precedence Relationship

6.

Which statement best describes the Forward Pass in project scheduling?

a)

It assumes the estimated activity duration is followed and finds early start and early finish times.

b)

It determines resource leveling across all activities.

c)

It calculates only the latest possible finish times.

d)

It identifies activities with zero float only.

7.

In a Backward Pass, what is determined for each activity without delaying the project?

a)

The earliest possible start and finish times

b)

The latest possible start and finish times

c)

Only the earliest finish time

d)

The amount of rework required

8.

Early Start and Early Finish represent which of the following?

a)

The earliest possible start and finish times for a project without delay

b)

The most optimistic resource allocation plan

c)

The dates after applying float to each activity

d)

The latest possible completion dates for noncritical tasks

9.

Late Start and Late Finish represent which of the following?

a)

The dates at which an activity must begin and end to minimize cost

b)

The latest possible start and finish times for a project without delay

c)

The baseline schedule recorded at project kickoff

d)

The earliest feasible times considering only durations

10.

What is the definition of Slack or Float?

a)

Time added to critical activities to ensure on-time completion

b)

Allowable time for an activity to delay without delaying the overall project duration

c)

Extra time available only at the end of the project

d)

Time gained by running activities in parallel

11.

Which statement about the Critical Path is correct?

a)

It consists of activities that have maximum float.

b)

It has zero slack or float; any delay on it will delay the overall project duration.

c)

It is the path with the greatest number of activities regardless of duration.

d)

It contains only activities scheduled with the Forward Pass.

12.

Which statement best characterizes PERT in project management?

a)

A deterministic, activity-oriented method emphasizing fixed durations

b)

A probabilistic, event-oriented method that considers time uncertainty

c)

A cost-only scheduling method without timing aspects

d)

A technique focused exclusively on crashing activities

13.

In CPM, which assumption about activity durations is emphasized?

a)

Durations vary randomly and must be modeled probabilistically

b)

Activities are defined only by events, not tasks

c)

Each activity follows its estimated duration deterministically

d)

Uncertainty is captured via optimistic and pessimistic estimates

14.

Which trio of time estimates is associated with PERT to capture uncertainty?

a)

Early Start, Late Start, Early Finish

b)

Crash time, Normal time, Free float

c)

Most likely, Optimistic, Pessimistic

d)

Budgeted cost, Actual cost, Earned value

15.

Which orientation correctly matches each method?

a)

PERT is activity oriented; CPM is event oriented

b)

Both PERT and CPM are event oriented

c)

PERT is event oriented; CPM is activity oriented

d)

Both PERT and CPM are activity oriented

16.

In CPM, what does the term crashing most closely mean?

a)

Eliminating non-critical activities without cost

b)

Reducing activity duration at a cost

c)

Estimating optimistic duration only

d)

Re-sequencing activities to remove uncertainty

17.

A project manager needs to analyze the probability of finishing a project by a certain time. Which technique is more appropriate based on the comparison?

a)

CPM, because it assumes fixed durations

b)

PERT, because it uses probabilistic time estimates

c)

Either PERT or CPM; both are equally probabilistic

d)

Neither; this requires only earned value analysis

18.

According to the definition, what is a Constructor’s Performance Evaluation System primarily used for?

a)

Scheduling activities along the critical path

b)

Grading a constructor’s performance for specific projects using set criteria

c)

Estimating probabilistic durations for events

d)

Calculating the time–cost tradeoff for crashing

19.

Which credential is explicitly required for a CPE to meet the minimum qualification?

a)

Certified Project Manager (PMP)

b)

Licensed Engineer or Architect

c)

Licensed Surveyor

d)

Registered Environmental Planner

e)

Certified Safety Professional

20.

According to the CPES minimum qualification, what is the minimum industry experience required for a CPE?

a)

2 years in any industry

b)

3 years in construction or forestry

c)

5 years in the construction industry

d)

7 years in project management

e)

10 years in public works

21.

Which condition would disqualify a CPE candidate under CPES minimum qualifications?

a)

Refusing overtime work

b)

Conviction of a crime with a penalty of 6 months imprisonment

c)

Holding dual citizenship

d)

Having no prior government experience

e)

Completion of an accreditation course

22.

What does a Corrective Action Request primarily document within CPES?

a)

The constructor’s proposed schedule updates

b)

Validated findings of the constructor’s noncompliance requiring immediate action

c)

Budget overruns and cost control measures

d)

Training needs of the CPE team

e)

Design change approvals

23.

Which statement best describes a Corrective Action Plan in CPES?

a)

A checklist to verify compliance

b)

A proposed plan detailing specific actions and timetable to correct non-conformance findings

c)

A weekly progress report on completed works

d)

A risk register for future projects

e)

A procurement plan for materials

24.

In CPES terminology, what is a Spot?

a)

A defect observed on a finished surface

b)

An area selected from identified locations of ongoing or completed work for evaluation/inspection

c)

A temporary storage area for materials

d)

A contingency fund category

e)

A safety incident recorded on site

25.

During construction, which project category is associated with 60%?

a)

Vertical projects such as buildings

b)

Horizontal projects such as roads and bridges

c)

Power transmission line projects only

d)

Substation and diesel power projects only

e)

Housing projects only

26.

What percentage allocation is given to Horizontal Projects upon completion in CPES evaluations?

a)

20%

b)

30%

c)

40%

d)

50%

27.

Which of the following is categorized under Vertical Projects in the CPES upon-completion allocation list?

a)

Ports and Harbors

b)

Irrigation and Flood Control

c)

Power Transmission Line

d)

Water Supply and Sewerage

28.

During construction, what is the minimum number of CPES site visits required when actual accomplishment is at least 30%?

a)

1 visit

b)

2 visits

c)

3 visits

d)

No visit required

29.

Upon completion, what type of visit is required according to the CPES Number of Visits guidance?

a)

Quarterly audit visit

b)

Final visit for 100% completion

c)

Random spot check

d)

Pre-award inspection

30.

Which criterion increases its weight from during-construction to upon-completion in CPES, doubling from 0.15 to 0.30?

a)

Workmanship

b)

Materials

c)

Time

d)

Facilities

31.

For projects lasting 90 calendar days and below, how many CPES visits are required during construction?

a)

No visits

b)

1 visit

c)

2 visits

d)

3 visits

32.

Which of the following is listed as a Horizontal Project in the CPES upon-completion allocation?

a)

Housing

b)

Building

c)

Road and Bridges

d)

Substation and Diesel Power

33.

What is the weight for Workmanship during construction versus upon completion in CPES criteria?

a)

0.30 during, 0.40 upon completion

b)

0.40 during, 0.50 upon completion

c)

0.50 during, 0.40 upon completion

d)

0.20 during, 0.30 upon completion

34.

What percentage allocation is given to Vertical Projects upon completion in CPES evaluations?

a)

20%

b)

30%

c)

40%

d)

60%

35.

Which criterion has a weight of 0.20 upon completion in the CPES criteria shown?

a)

Materials

b)

Facilities

c)

Environment, Safety & Health

d)

Resource Deployment

36.

According to the CPES scoring remarks, which adjective rating corresponds to a numerical score greater than 96%?

a)

Outstanding

b)

Very Satisfactory

c)

Satisfactory

d)

Unsatisfactory

e)

Poor

37.

Which numerical rating range aligns with the adjective rating "Very Satisfactory" in CPES evaluations?

a)

> 96%

b)

89% - 96%

c)

> 89% - 96%

d)

82% - 89%

e)

75% - 82%

38.

In CPES for the construction industry, what minimum rating must a constructor have for agency shortlisting?

a)

Outstanding

b)

Very Satisfactory

c)

Satisfactory

d)

Unsatisfactory

e)

Poor

39.

Which statement best describes the CPES requirement related to Time during an agency’s post qualification?

a)

A zero rating for Time is acceptable if other criteria are high

b)

At least satisfactory overall rating and no zero rating for Time are required

c)

Only an Outstanding rating for Time is acceptable

d)

Time is not considered during post qualification

e)

Time must be rated above 96%

40.

What is the consequence in CPES if a constructor’s final rating is Poor or Unsatisfactory?

a)

They must reapply after six months

b)

They are given provisional registration

c)

They are blacklisted

d)

They receive a warning but may still be shortlisted

e)

No consequence is specified

41.

Which statement best describes how CPES ratings influence PCAB registration?

a)

A contractor’s CPES rating is unrelated to PCAB licensing eligibility.

b)

CPES ratings serve as part of the evidence considered for PCAB license registration and category.

c)

Only contractors with zero CPES ratings are automatically given the highest PCAB category.

d)

PCAB registration depends solely on project cost and ignores CPES entirely.

42.

For shortlisting by procuring agencies, what minimum CPES performance threshold is typically required?

a)

Unsatisfactory

b)

Satisfactory

c)

Excellent only

d)

Zero in all categories

43.

If a contractor receives a zero rating in the Time performance criterion of CPES, what is the most likely implication?

a)

Immediate upgrade to a higher PCAB category

b)

No impact on agency evaluations

c)

Potential grounds for sanctions such as blacklisting

d)

Automatic award of time extension

44.

Which combination correctly pairs a CPES-related outcome with its likely industry consequence?

a)

High CPES rating → ineligible for shortlisting

b)

Satisfactory CPES rating → considered for agency shortlisting

c)

Zero rating in Time → recommended for acceleration bonuses

d)

No CPES records → automatic Large B PCAB category

45.

Which term refers to the maximum value a contractor can undertake for one project under a specific PCAB license category?

a)

Size Range

b)

Single Large Project

c)

Allowable Range of Contract Cost

d)

Project Duration

46.

A contractor holds a PCAB license category that allows projects only within a specified monetary interval across all contracts in a year. Which label best describes this constraint?

a)

Single Large Project

b)

Size Range

c)

Allowable Range of Contract Cost

d)

Project Aggregation Limit

47.

In the context of PCAB license categories, which item most directly differentiates the breadth of projects a contractor may bid on, regardless of the number of contracts?

a)

Project quality rating

b)

Size Range

c)

Contractor safety record

d)

Number of employees

48.

A forest road improvement contract is valued near the upper boundary of a PCAB category’s monetary band but still below the cap for one project. Which pairing correctly identifies the governing parameters you must verify before bidding?

a)

Project Duration and Safety Rating

b)

Single Large Project and Size Range

c)

Allowable Range of Contract Cost and Single Large Project

d)

Number of Employees and Equipment List

49.

Which step in timber extraction involves cutting down trees?

a)

Felling

b)

Log processing

c)

Skidding

d)

Transportation

50.

In timber extraction, what is the primary purpose of skidding?

a)

Removing bark from logs

b)

Moving logs from the cutting point to the road

c)

Transporting logs from the road to the sawmill

d)

Cutting trees into sections

51.

Which activity is most closely associated with log processing?

a)

Delimbing and debarking

b)

Building forest roads

c)

Planning harvest schedules

d)

Measuring stand volume

52.

Arrange the following timber extraction steps in the correct sequence starting from the forest: Felling, Transportation, Skidding, Log Processing.

a)

Felling → Log Processing → Skidding → Transportation

b)

Felling → Skidding → Log Processing → Transportation

c)

Log Processing → Felling → Skidding → Transportation

d)

Skidding → Felling → Log Processing → Transportation

53.

Which statement best distinguishes clearcutting from thinning?

a)

Clearcutting removes only weaker trees; thinning removes all trees in an area.

b)

Clearcutting removes all or most trees in a specific area at once; thinning selectively removes only some trees.

c)

Both clearcutting and thinning remove only overcrowded trees.

d)

Thinning removes bark and branches; clearcutting transports logs to the mill.

54.

A forest manager wants to reduce competition among trees while maintaining stand cover. Which cutting practice is most appropriate?

a)

Clearcutting

b)

Felling

c)

Thinning

d)

Skidding

55.

Which botanical group do softwood-producing trees belong to?

a)

Angiosperms

b)

Gymnosperms

c)

Bryophytes

d)

Pteridophytes

56.

Which example is correctly identified as a softwood tree?

a)

Oak

b)

Maple

c)

Pine

d)

Teak

57.

Hardwood trees are angiosperms. Which structural feature distinguishes their wood from softwoods?

a)

Presence of cones

b)

Lack of lignin

c)

Vessels that make the structure more complex

d)

Single-celled fibers only

58.

Wood is described as a lignocellulosic material. Which set lists its primary components?

a)

Cellulose, hemicellulose, lignin

b)

Cellulose, keratin, lignin

c)

Chitin, hemicellulose, lignin

d)

Pectin, cellulose, keratin

59.

What role does lignin play in wood according to the material?

a)

It absorbs water to make wood hygroscopic

b)

It binds cellulose to make wood stronger

c)

It forms cones in gymnosperms

d)

It creates vessels in angiosperms

60.

Which statement best explains why wood is termed hygroscopic?

a)

It repels moisture

b)

It contains vessels that transport resin

c)

It tends to absorb or release moisture from the environment

d)

It has simple cell structures only

61.

Which term refers to a processed log or wood?

a)

Lumber

b)

Slab

c)

Timber

d)

Flitch

62.

A slab is best described as which of the following?

a)

Rough lumber cut tangent to the annual ring

b)

Planed lumber smooth on four sides

c)

A piece of lumber less than 4 cm thick and at least 10 cm wide

d)

A piece of lumber 5 inches or larger in its smallest dimension

63.

Which statement correctly defines a plank?

a)

Wide piece of lumber from 4–5 inches thick

b)

Any processed log or wood

c)

Thick unprocessed slab

d)

Smooth lumber on two sides

64.

What defines a board according to the specification provided?

a)

A piece of lumber less than 4 cm thick and at least 10 cm wide

b)

A wide piece of lumber 4–5 inches thick

c)

A piece of lumber 5 inches or larger in its smallest dimension

d)

Rough lumber cut tangent to annual rings

65.

Dressed lumber is described as planed lumber having at least one smooth side. Which designation means smooth on four sides?

a)

S1S

b)

S2S

c)

S3S

d)

S4S

66.

Which option correctly defines timber in this context?

a)

Any planed lumber

b)

A piece of lumber 5 inches or larger in its smallest dimension

c)

A wide piece of lumber 4–5 inches thick

d)

A piece of lumber less than 4 cm thick

67.

Which term refers to a thick piece of lumber or thick slab that is unprocessed?

a)

Board

b)

Plank

c)

Flitch

d)

Dressed lumber

68.

Which pairing is correct based on the definitions?

a)

S2S — smooth on four sides

b)

Board — less than 4 cm thick and at least 10 cm wide

c)

Plank — 2–3 inches thick

d)

Timber — smaller than 5 inches in all dimensions

69.

Which wood defect is defined as a radial crack originating from the heart of the tree?

a)

Heart shakes

b)

Star shakes

c)

Wind shake or Cup shake

d)

Knot

70.

Star shakes are best described as which of the following?

a)

Cracks or breaks across annual rings due to wind pressure

b)

A single radial crack from the tree’s center

c)

Several heart shakes

d)

A defect at the starting point of a limb or branch

71.

Wind shake, also called Cup shake, occurs as cracks or breaks across annual rings of the wood during its growth. What is identified as the cause?

a)

Temperature fluctuation

b)

Improper seasoning

c)

Fungal attack

d)

Wind pressure

72.

Which defect occurs at the starting point of a limb or branch?

a)

Heart shake

b)

Star shake

c)

Knot

d)

Radial shake

73.

Which wood product is made from chips, sawdust, and shavings, and is characterized as low density?

a)

Plywood

b)

Particle board

c)

Fiberboard

d)

Glulam

74.

Glulam is best defined as which of the following?

a)

Thin layers of wood veneers glued with grains perpendicular

b)

Fine wood fibers pressed to medium to high density

c)

Engineered wood made by gluing layers of lumber to create stronger and larger pieces than solid wood

d)

Solid timber cut directly from logs with no adhesive

75.

Which category of lumber is typically used for light construction and finishing work?

a)

Yard lumber

b)

Shop lumber

c)

Structural lumber

d)

Reclaimed lumber

76.

Shop lumber is most commonly intended for which applications?

a)

Roof trusses and floor joists

b)

Doors, cabinets, and furniture

c)

Exterior siding and shingles

d)

Beams and columns

77.

Structural lumber is best described as lumber used for which of the following?

a)

Decorative trim and molding

b)

Beams and columns

c)

Cabinet carcasses

d)

Outdoor decking only

78.

Which engineered wood product consists of thin layers of wood veneers glued together with adjacent layers having their wood grain rotated up to 90 degrees to one another?

a)

Plywood

b)

Particle board

c)

Fiberboard

d)

Glulam

79.

Which product is formed by bonding small wood particles with resin under heat and pressure?

a)

Glulam

b)

Plywood

c)

Particle board

d)

Solid sawn lumber

80.

Glulam refers to a structural member made by which process?

a)

Compressing wood fibers into dense panels

b)

Laminating dimension lumber with adhesives to form beams or columns

c)

Slicing veneers for decorative overlays

d)

Extruding wood-plastic composite profiles

81.

In the context of exterior finishes, what does cladding mean?

a)

A structural shear wall panel

b)

A nonstructural covering material applied to the exterior of a building for protection and aesthetic finish

c)

An interior vapor barrier to control moisture

d)

A method of joining beams to columns

82.

Identify the flooring/cladding profile shown as (a) in the diagram: boards interlock using a projecting tongue on one edge and a matching groove on the other.

a)

T&G

b)

Rectangular

c)

Featheredge

d)

Shiplap

e)

V-rustic

83.

Which profile is shown as (b): simple blocks with flat sides and no interlocking features?

a)

Shiplap

b)

Rectangular

c)

Featheredge

d)

Parallelogram

e)

V-rustic

84.

Which profile is shown as (c): boards with a tapered section producing thin and thick edges for overlapping cladding?

a)

Featheredge

b)

V-rustic

c)

Parallelogram

d)

Shiplap

e)

Rectangular

85.

Identify the profile shown as (d): boards overlap with a recess and rebate forming a horizontal lap joint along their edges.

a)

T&G

b)

Shiplap

c)

V-rustic

d)

Parallelogram

e)

Rectangular

86.

Which profile is shown as (e): boards cut with parallel sloped faces forming a consistent angled section?

a)

Parallelogram

b)

Featheredge

c)

Rectangular

d)

V-rustic

e)

T&G

87.

In the warping diagram, which defect shows curvature along the length of the board without edge bending?

a)

Cup

b)

Bow

c)

Twist

d)

Kink

e)

Crook

88.

A board shows a V-shaped groove between adjacent faces when installed to emphasize the joint line. Which profile typically creates this visual effect?

a)

V-rustic

b)

Rectangular

c)

Parallelogram

d)

Shiplap